Dataset Viewer (First 5GB)
Auto-converted to Parquet Duplicate
id
int64
0
102
image_name
stringlengths
14
27
page_image
imagewidth (px)
1.02k
1.02k
description
stringclasses
1 value
annotation
stringlengths
103
2.8k
mol
stringlengths
422
3.61k
cxsmiles_dataset
stringlengths
21
227
cxsmiles
stringlengths
21
227
cxsmiles_opt
stringlengths
28
247
keypoints
null
cells
listlengths
3
31
0
EP14861496NWB1_40.png
<markush><cxsmi><r>R2</r>C1=CC=C(C(=O)NC2=CC=C(<r>R4</r>)C(<r>R6</r>)=C2<r>R7</r>)C(S(<r>R1</r>)=O)=C1|Sg:n:20:m:ht</cxsmi><stable>R1:(C1-C6)alkyl group<ns>R2:a halo (C1-C6) alkyl group<ns>R4:a halo (C1-C6) alkyl group<ns>m:0-2<ns>R6:a hydrogen atom<n>a halogen atom<n>a (C1-C6) alkyl group<ns>R7:a hydrogen atom<n>a halogen atom<n>a (C1-C6) alkyl group</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 22 23 1 0 0 M V30 BEGIN ATOM M V30 1 R 3.000000 0.000000 0.000000 0 VAL=1 M V30 2 C 1.500000 0.000000 0.000000 0 M V30 3 C 0.750000 -1.299038 0.000000 0 M V30 4 C -0.750000 -1.299038 0.000000 0 M V30 5 C -0.000000 -0.000000 0.000000 0 M V30 6 C 1.500000 -0.000000 0.000000 0 M V30 7 O 2.250000 1.299038 0.000000 0 M V30 8 N 2.250000 -1.299038 0.000000 0 M V30 9 C 3.750000 -1.299038 0.000000 0 M V30 10 C 4.500000 -2.598076 0.000000 0 M V30 11 C 5.250000 -1.299038 0.000000 0 M V30 12 C 6.750000 -1.299038 0.000000 0 M V30 13 R 7.500000 -0.000000 0.000000 0 VAL=1 M V30 14 C 5.250000 -1.299038 0.000000 0 M V30 15 R 4.836622 -2.740953 0.000000 0 VAL=1 M V30 16 C 4.500000 -0.000000 0.000000 0 M V30 17 R 3.750000 1.299038 0.000000 0 VAL=1 M V30 18 C -0.750000 1.299038 0.000000 0 M V30 19 C 0.750000 1.299038 0.000000 0 M V30 20 S -2.250000 1.299038 0.000000 0 M V30 21 R -3.000000 2.598076 0.000000 0 VAL=1 M V30 22 O -3.000000 0.000000 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 3 4 M V30 4 2 4 5 M V30 5 1 5 6 M V30 6 2 6 7 M V30 7 1 6 8 M V30 8 1 8 9 M V30 9 2 9 10 M V30 10 1 10 11 M V30 11 2 11 12 M V30 12 1 12 13 M V30 13 1 12 14 M V30 14 1 14 15 M V30 15 2 14 16 M V30 16 1 16 17 M V30 17 1 5 18 M V30 18 2 18 19 M V30 19 1 18 20 M V30 20 1 20 21 M V30 21 2 20 22 M V30 22 1 19 2 M V30 23 1 16 9 M V30 END BOND M V30 BEGIN SGROUP M V30 1 SRU 0 ATOMS=(1 22) XBONDS=(1 21) XBHEAD=(1 21) CONNECT=HT LABEL=m M V30 END SGROUP M V30 END CTAB M END
*C1=CC=C(C(=O)NC2=CC=C(*)C(*)=C2*)C(S(*)=O)=C1 |$R2;;;;;;;;;;;;R4;;R6;;R7;;;R1;;$,Sg:n:20:m:ht:::,|
*C1=CC=C(C(=O)NC2=CC=C(*)C(*)=C2*)C(S(*)=O)=C1 |$R2;;;;;;;;;;;;R4;;R6;;R7;;;R1;;$,Sg:n:20:m:ht:::,|
<r>R2</r>C1=CC=C(C(=O)NC2=CC=C(<r>R4</r>)C(<r>R6</r>)=C2<r>R7</r>)C(S(<r>R1</r>)=O)=C1|Sg:n:20:m:ht
null
[ { "bbox": [ 0.0439453125, 0.4990234375, 0.107421875, 0.5146484375 ], "text": "wherein" }, { "bbox": [ 0.0751953125, 0.5458984375, 0.3642578125, 0.56640625 ], "text": "R1 represents a (C1-C6)alkyl group," }, { "bbox": [ 0.076171875, 0.5693359375, 0.7822265625, 0.58984375 ], "text": "R2 and R4 may be the same or different, and each represent a halo (C1-C6) alkyl group," }, { "bbox": [ 0.0771484375, 0.595703125, 0.296875, 0.611328125 ], "text": "m represents 0, 1 or 2, and" }, { "bbox": [ 0.0751953125, 0.6181640625, 0.955078125, 0.638671875 ], "text": "R6 and R7 may be the same or different, and each represent a hydrogen atom, a halogen atom or a (C1-C6)" }, { "bbox": [ 0.0771484375, 0.6416015625, 0.4326171875, 0.6591796875 ], "text": "alkyl group, or a salt thereof to plants or soil." }, { "bbox": [ 0.318359375, 0.419921875, 0.33984375, 0.443359375 ], "text": "R2" }, { "bbox": [ 0.3779296875, 0.3388671875, 0.3994140625, 0.359375 ], "text": "R1" }, { "bbox": [ 0.4091796875, 0.3671875, 0.421875, 0.384765625 ], "text": "S" }, { "bbox": [ 0.4501953125, 0.3896484375, 0.4677734375, 0.4072265625 ], "text": "O" }, { "bbox": [ 0.4609375, 0.4384765625, 0.4775390625, 0.4716796875 ], "text": "N" }, { "bbox": [ 0.48046875, 0.380859375, 0.5009765625, 0.40234375 ], "text": "R7" }, { "bbox": [ 0.544921875, 0.3740234375, 0.56640625, 0.3955078125 ], "text": "R6" }, { "bbox": [ 0.580078125, 0.4208984375, 0.6005859375, 0.439453125 ], "text": "R4" }, { "bbox": [ 0.427734375, 0.3388671875, 0.4423828125, 0.35546875 ], "text": "O" }, { "bbox": [ 0.44921875, 0.349609375, 0.4658203125, 0.359375 ], "text": "m" } ]
1
US5953857_17.png
<markush><cxsmi><r>B16</r>C1=C(<r>B15</r>)C(<r>A13</r>)=C2C(=O)C(<r>B17</r>)=C(<r>B18</r>)C(<r>A14</r>)=C2C1=O</cxsmi><stable>A13:an amino group<n>a substituted or unsubstituted alkylamino group<n>a substituted or unsubstituted alkylamino group<n>a substituted or unsubstituted arylamino group<ns>A14:an amino group<n>a substituted or unsubstituted alkylamino group<n>a substituted or unsubstituted alkylamino group<n>a substituted or unsubstituted arylamino group<ns>B15:a hydrogen atom<n>a halogen atom<n>a substituted or unsubstituted alkyl group<n>a substituted or unsubstituted alkoxy group<n>a substituted or unsubstituted aryl group<n>a substituted or unsubstituted aryloxy group<ns>B16:a hydrogen atom<n>a halogen atom<n>a substituted or unsubstituted alkyl group<n>a substituted or unsubstituted alkoxy group<n>a substituted or unsubstituted aryl group<n>a substituted or unsubstituted aryloxy group<ns>B17:a hydrogen atom<n>a halogen atom<n>a substituted or unsubstituted alkyl group<n>a substituted or unsubstituted alkoxy group<n>a substituted or unsubstituted aryl group<n>a substituted or unsubstituted aryloxy group<ns>B18:a hydrogen atom<n>a halogen atom<n>a substituted or unsubstituted alkyl group<n>a substituted or unsubstituted alkoxy group<n>a substituted or unsubstituted aryl group<n>a substituted or unsubstituted aryloxy group</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 18 19 0 0 0 M V30 BEGIN ATOM M V30 1 R 2.250000 1.299038 0.000000 0 VAL=1 M V30 2 C 1.500000 0.000000 0.000000 0 M V30 3 C -0.000000 0.000000 0.000000 0 M V30 4 R -0.902755 1.197929 0.000000 0 VAL=1 M V30 5 C -0.750000 -1.299038 0.000000 0 M V30 6 O -0.000000 -2.598076 0.000000 0 M V30 7 C -1.500000 0.000000 0.000000 0 M V30 8 C -1.363666 0.350604 0.000000 0 M V30 9 R 0.750000 -1.299038 0.000000 0 VAL=1 M V30 10 C -1.282113 -0.673169 0.000000 0 M V30 11 R -0.597245 1.197929 0.000000 0 VAL=1 M V30 12 C -1.095610 0.535511 0.000000 0 M V30 13 R -4.500000 -0.000000 0.000000 0 VAL=1 M V30 14 C -0.959497 0.203274 0.000000 0 M V30 15 O -3.000000 2.598076 0.000000 0 M V30 16 C -0.750000 1.299038 0.000000 0 M V30 17 C 0.000000 0.000000 0.000000 0 M V30 18 R -0.052188 -1.499092 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 3 4 M V30 4 1 3 5 M V30 5 2 5 6 M V30 6 1 5 7 M V30 7 2 7 8 M V30 8 1 8 9 M V30 9 1 8 10 M V30 10 1 10 11 M V30 11 2 10 12 M V30 12 1 12 13 M V30 13 1 12 14 M V30 14 2 14 15 M V30 15 1 14 16 M V30 16 2 16 17 M V30 17 1 17 18 M V30 18 1 17 2 M V30 19 1 16 7 M V30 END BOND M V30 END CTAB M END
*C1=C(*)C(*)=C2C(=O)C(*)=C(*)C(*)=C2C1=O |$B16;;;B15;;A13;;;;;B17;;B18;;A14;;;$,|
*C1=C(*)C(*)=C2C(=O)C(*)=C(*)C(*)=C2C1=O |$B16;;;B15;;A13;;;;;B17;;B18;;A14;;;$,|
<r>B16</r>C1=C(<r>B15</r>)C(<r>A13</r>)=C2C(=O)C(<r>B17</r>)=C(<r>B18</r>)C(<r>A14</r>)=C2C1=O
null
[ { "bbox": [ 0.1298828125, 0.236328125, 0.1708984375, 0.265625 ], "text": "B17" }, { "bbox": [ 0.2734375, 0.1748046875, 0.29296875, 0.197265625 ], "text": "O" }, { "bbox": [ 0.3896484375, 0.169921875, 0.4326171875, 0.197265625 ], "text": "A13" }, { "bbox": [ 0.505859375, 0.236328125, 0.55078125, 0.267578125 ], "text": "B15" }, { "bbox": [ 0.5078125, 0.3720703125, 0.55078125, 0.3994140625 ], "text": "B16" }, { "bbox": [ 0.3896484375, 0.4453125, 0.4091796875, 0.466796875 ], "text": "O" }, { "bbox": [ 0.2705078125, 0.4404296875, 0.31640625, 0.466796875 ], "text": "A14" }, { "bbox": [ 0.1279296875, 0.369140625, 0.1708984375, 0.3994140625 ], "text": "B18" }, { "bbox": [ 0.0439453125, 0.5361328125, 0.953125, 0.5771484375 ], "text": "where each of A13 and A14 is independently an amino group," }, { "bbox": [ 0.0439453125, 0.5810546875, 0.951171875, 0.6171875 ], "text": "a substituted or unsubstituted alkylamino group, or a sub-" }, { "bbox": [ 0.0439453125, 0.619140625, 0.951171875, 0.6591796875 ], "text": "stituted or unsubstituted arylamino group; and each of B15 to" }, { "bbox": [ 0.0439453125, 0.6611328125, 0.951171875, 0.69921875 ], "text": "B18 is independently a hydrogen atom, a halogen atom, a" }, { "bbox": [ 0.0439453125, 0.705078125, 0.953125, 0.7421875 ], "text": "substituted or unsubstituted alkyl group, a substituted or" }, { "bbox": [ 0.0439453125, 0.75, 0.953125, 0.7861328125 ], "text": "unsubstituted alkoxy group, a substituted or unsubstituted" }, { "bbox": [ 0.0439453125, 0.7900390625, 0.951171875, 0.828125 ], "text": "aryl group, or a substituted or unsubstituted aryloxy group." } ]
2
US6232309_16.png
<markush><cxsmi><r>R3</r>C.CCC1=CN=CC=C1|m:1:4.5.6.7.8.9</cxsmi><stable>R3:H<n>a halogen atom</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 10 9 0 0 0 M V30 BEGIN ATOM M V30 1 C 3.750000 -1.299038 0.000000 0 M V30 2 C 3.000000 0.000000 0.000000 0 M V30 3 C 1.500000 0.000000 0.000000 0 M V30 4 C 0.750000 -1.299038 0.000000 0 M V30 5 N -0.750000 -1.299038 0.000000 0 M V30 6 C -1.500000 0.000000 0.000000 0 M V30 7 C -0.750000 1.299038 0.000000 0 M V30 8 C 0.750000 1.299038 0.000000 0 M V30 9 C 1.299038 3.049038 0.000000 0 M V30 10 R 0.000000 2.299038 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 2 3 4 M V30 4 1 4 5 M V30 5 2 5 6 M V30 6 1 6 7 M V30 7 2 7 8 M V30 8 1 9 10 ENDPTS=(6 6 7 8 5 3 4) ATTACH=ANY M V30 9 1 8 3 M V30 END BOND M V30 END CTAB M END
*C.CCC1=CN=CC=C1 |$R3;;;;;;;;;$,m:1:7.8.9.6.4.5|
*C.CCC1=CN=CC=C1 |$R3;;;;;;;;;$,m:1:7.8.9.6.4.5|
<r>R3</r>C.CCC1=CN=CC=C1|m:1:4.5.6.7.8.9
null
[ { "bbox": [ 0.6484375, 0.16015625, 0.693359375, 0.2021484375 ], "text": "R3" }, { "bbox": [ 0.5654296875, 0.3291015625, 0.595703125, 0.369140625 ], "text": "N" }, { "bbox": [ 0.0419921875, 0.4794921875, 0.2314453125, 0.5263671875 ], "text": "wherein" }, { "bbox": [ 0.099609375, 0.5439453125, 0.955078125, 0.609375 ], "text": "R3 represents H or a halogen atom," }, { "bbox": [ 0.099609375, 0.626953125, 0.6484375, 0.6845703125 ], "text": "X represents CH or N," }, { "bbox": [ 0.099609375, 0.705078125, 0.81640625, 0.759765625 ], "text": "Y represents NO2 or CN, and" }, { "bbox": [ 0.1005859375, 0.775390625, 0.498046875, 0.8349609375 ], "text": "R1 represents H. " } ]
3
US6344453_16.png
<markush><cxsmi><r>R3</r>C.CCC1=CN=CC=C1|m:1:4.5.6.7.8.9</cxsmi><stable>R3:hydrogen<n>halogen</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 10 9 0 0 0 M V30 BEGIN ATOM M V30 1 C 3.750000 -1.299038 0.000000 0 M V30 2 C 3.000000 0.000000 0.000000 0 M V30 3 C 1.500000 0.000000 0.000000 0 M V30 4 C 0.750000 -1.299038 0.000000 0 M V30 5 N -0.750000 -1.299038 0.000000 0 M V30 6 C -1.500000 0.000000 0.000000 0 M V30 7 C -0.750000 1.299038 0.000000 0 M V30 8 C 0.750000 1.299038 0.000000 0 M V30 9 C 1.299038 3.049038 0.000000 0 M V30 10 R 0.000000 2.299038 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 2 3 4 M V30 4 1 4 5 M V30 5 2 5 6 M V30 6 1 6 7 M V30 7 2 7 8 M V30 8 1 9 10 ENDPTS=(6 6 7 8 5 3 4) ATTACH=ANY M V30 9 1 8 3 M V30 END BOND M V30 END CTAB M END
*C.CCC1=CN=CC=C1 |$R3;;;;;;;;;$,m:1:7.8.9.6.4.5|
*C.CCC1=CN=CC=C1 |$R3;;;;;;;;;$,m:1:7.8.9.6.4.5|
<r>R3</r>C.CCC1=CN=CC=C1|m:1:4.5.6.7.8.9
null
[ { "bbox": [ 0.3857421875, 0.3017578125, 0.416015625, 0.3330078125 ], "text": "R3" }, { "bbox": [ 0.328125, 0.4287109375, 0.34765625, 0.44921875 ], "text": "N" }, { "bbox": [ 0.0439453125, 0.5517578125, 0.953125, 0.5947265625 ], "text": "wherein R3 is hydrogen or halogen, X represents N, Y" }, { "bbox": [ 0.044921875, 0.6015625, 0.951171875, 0.6455078125 ], "text": "represents a nitro group or cyano group, and R1 rep-" }, { "bbox": [ 0.0439453125, 0.658203125, 0.470703125, 0.6953125 ], "text": "resents a hydrogen atom." } ]
4
US6521785_11.png
<markush><cxsmi><r>R2</r>C.<r>R3</r>C.O=S(=O)(O)C1=C2C=CC=CC2=CC=C1|m:1:9.10.11.12.13.14,m:3:8.9.14.15.16.17</cxsmi><stable>R2:hydrogen<n>C1-C24 alkyl<ns>R3:hydrogen<n>C1-C24 alkyl</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 18 17 0 0 0 M V30 BEGIN ATOM M V30 1 O 3.000000 2.598076 0.000000 0 M V30 2 S 2.250000 1.299038 0.000000 0 M V30 3 O 3.549038 0.549038 0.000000 0 M V30 4 O 1.171046 2.341084 0.000000 0 M V30 5 C 0.443315 -1.432248 0.000000 0 M V30 6 C 0.750000 -1.299038 0.000000 0 M V30 7 C 1.500000 0.000000 0.000000 0 M V30 8 C 0.750000 1.299038 0.000000 0 M V30 9 C -0.750000 1.299038 0.000000 0 M V30 10 C -1.500000 0.000000 0.000000 0 M V30 11 C -0.750000 -1.299038 0.000000 0 M V30 12 C -0.278897 -0.779970 0.000000 0 M V30 13 C -0.140425 -1.409370 0.000000 0 M V30 14 C 0.427410 -0.381189 0.000000 0 M V30 15 C 1.299038 4.348076 0.000000 0 M V30 16 R 0.000000 3.598076 0.000000 0 VAL=1 M V30 17 C 5.848076 0.750000 0.000000 0 M V30 18 R 4.549038 0.000000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 2 2 4 M V30 4 1 2 5 M V30 5 2 5 6 M V30 6 1 6 7 M V30 7 2 7 8 M V30 8 1 8 9 M V30 9 2 9 10 M V30 10 1 10 11 M V30 11 2 11 12 M V30 12 1 12 13 M V30 13 2 13 14 M V30 14 1 15 16 ENDPTS=(6 8 7 9 6 11 10) ATTACH=ANY M V30 15 1 17 18 ENDPTS=(6 11 12 6 5 14 13) ATTACH=ANY M V30 16 1 14 5 M V30 17 1 11 6 M V30 END BOND M V30 END CTAB M END
*C.*C.O=S(=O)(O)C1=C2C=CC=CC2=CC=C1 |$R2;;R3;;;;;;;;;;;;;;;$,m:1:11.10.12.9.14.13,m:3:14.15.9.8.17.16|
*C.*C.O=S(=O)(O)C1=C2C=CC=CC2=CC=C1 |$R2;;R3;;;;;;;;;;;;;;;$,m:1:11.10.12.9.14.13,m:3:14.15.9.8.17.16|
<r>R2</r>C.<r>R3</r>C.O=S(=O)(O)C1=C2C=CC=CC2=CC=C1|m:1:9.10.11.12.13.14,m:3:8.9.14.15.16.17
null
[ { "bbox": [ 0.0908203125, 0.275390625, 0.123046875, 0.30078125 ], "text": "R2" }, { "bbox": [ 0.09375, 0.5, 0.123046875, 0.5302734375 ], "text": "R3" }, { "bbox": [ 0.33984375, 0.37890625, 0.36328125, 0.4033203125 ], "text": "O" }, { "bbox": [ 0.3408203125, 0.453125, 0.3603515625, 0.4716796875 ], "text": "S" }, { "bbox": [ 0.3388671875, 0.521484375, 0.3603515625, 0.5419921875 ], "text": "O" }, { "bbox": [ 0.41015625, 0.4501953125, 0.4541015625, 0.4716796875 ], "text": "O" }, { "bbox": [ 0.0439453125, 0.6396484375, 0.9560546875, 0.6767578125 ], "text": "wherein R1, R2, and R3 are independently selected from" }, { "bbox": [ 0.0810546875, 0.6845703125, 0.923828125, 0.720703125 ], "text": "the group consisting of hydrogen and C1-C24 alkyl;" } ]
5
US8901170_31.png
<markush><cxsmi><r>RB</r>NC(=O)C1=C(NC(=O)C2=CC(<r>B2</r>)=NN2C2=C(Cl)C=CC=N2)C(C)=CC(<r>B1</r>)=C1</cxsmi><stable>B1:hydrogen<n>chlorine<n>cyano<ns>B2:a bromine atom<n>CF3<ns>RB:H<n>CH3<n>CH(CH3)2</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 28 30 0 0 0 M V30 BEGIN ATOM M V30 1 C 2.250000 1.299038 0.000000 0 M V30 2 C 1.500000 0.000000 0.000000 0 M V30 3 C 0.750000 -1.299038 0.000000 0 M V30 4 C -0.750000 -1.299038 0.000000 0 M V30 5 R -1.500000 -2.598076 0.000000 0 VAL=1 M V30 6 C -1.500000 0.000000 0.000000 0 M V30 7 C -0.750000 1.299038 0.000000 0 M V30 8 C -1.500000 2.598076 0.000000 0 M V30 9 O -3.000000 2.598076 0.000000 0 M V30 10 N -0.750000 3.897114 0.000000 0 M V30 11 R -1.500000 5.196152 0.000000 0 VAL=1 M V30 12 C 0.000000 0.000000 0.000000 0 M V30 13 N -0.750000 -1.299038 0.000000 0 M V30 14 C -2.250000 -1.299038 0.000000 0 M V30 15 O -3.000000 0.000000 0.000000 0 M V30 16 C -3.000000 -2.598076 0.000000 0 M V30 17 C -2.389895 -3.968394 0.000000 0 M V30 18 C -3.504612 -4.972090 0.000000 0 M V30 19 R -3.347820 -6.463873 0.000000 0 VAL=1 M V30 20 N -4.803650 -4.222090 0.000000 0 M V30 21 N -4.491783 -2.754869 0.000000 0 M V30 22 C -5.495479 -1.640152 0.000000 0 M V30 23 C -6.962700 -1.952019 0.000000 0 M V30 24 Cl -8.429922 -2.263887 0.000000 0 M V30 25 C -5.959004 -3.066736 0.000000 0 M V30 26 C -4.491783 -2.754869 0.000000 0 M V30 27 C -4.028257 -1.328284 0.000000 0 M V30 28 N -5.031953 -0.213567 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 3 4 M V30 4 1 4 5 M V30 5 2 4 6 M V30 6 1 6 7 M V30 7 1 7 8 M V30 8 2 8 9 M V30 9 1 8 10 M V30 10 1 10 11 M V30 11 2 7 12 M V30 12 1 12 13 M V30 13 1 13 14 M V30 14 2 14 15 M V30 15 1 14 16 M V30 16 2 16 17 M V30 17 1 17 18 M V30 18 1 18 19 M V30 19 2 18 20 M V30 20 1 20 21 M V30 21 1 21 22 M V30 22 2 22 23 M V30 23 1 23 24 M V30 24 1 23 25 M V30 25 2 25 26 M V30 26 1 26 27 M V30 27 2 27 28 M V30 28 1 12 2 M V30 29 1 21 16 M V30 30 1 28 22 M V30 END BOND M V30 END CTAB M END
*NC(=O)C1=C(NC(=O)C2=CC(*)=NN2C2=C(Cl)C=CC=N2)C(C)=CC(*)=C1 |$RB;;;;;;;;;;;;B2;;;;;;;;;;;;;;B1;$,|
*NC(=O)C1=C(NC(=O)C2=CC(*)=NN2C2=C(Cl)C=CC=N2)C(C)=CC(*)=C1 |$RB;;;;;;;;;;;;B2;;;;;;;;;;;;;;B1;$,|
<r>RB</r>NC(=O)C1=C(NC(=O)C2=CC(<r>B2</r>)=NN2C2=C(Cl)C=CC=N2)C(C)=CC(<r>B1</r>)=C1
null
[ { "bbox": [ 0.1572265625, 0.36328125, 0.1845703125, 0.392578125 ], "text": "B1" }, { "bbox": [ 0.4365234375, 0.4921875, 0.4560546875, 0.513671875 ], "text": "O" }, { "bbox": [ 0.3310546875, 0.552734375, 0.3515625, 0.6005859375 ], "text": "N" }, { "bbox": [ 0.2548828125, 0.5458984375, 0.2880859375, 0.578125 ], "text": "RB" }, { "bbox": [ 0.435546875, 0.3681640625, 0.4580078125, 0.41796875 ], "text": "N" }, { "bbox": [ 0.4326171875, 0.2470703125, 0.45703125, 0.271484375 ], "text": "O" }, { "bbox": [ 0.58203125, 0.36328125, 0.603515625, 0.3876953125 ], "text": "N" }, { "bbox": [ 0.6513671875, 0.345703125, 0.6708984375, 0.3671875 ], "text": "N" }, { "bbox": [ 0.71484375, 0.2333984375, 0.7431640625, 0.2626953125 ], "text": "B2" }, { "bbox": [ 0.5146484375, 0.453125, 0.53515625, 0.478515625 ], "text": "N" }, { "bbox": [ 0.701171875, 0.4677734375, 0.7294921875, 0.4921875 ], "text": "Cl" }, { "bbox": [ 0.04296875, 0.6708984375, 0.953125, 0.7099609375 ], "text": "wherein B1 is hydrogen, chlorine or cyano, B2 is a bromine" }, { "bbox": [ 0.0810546875, 0.712890625, 0.796875, 0.755859375 ], "text": "atom or CF3, and RB is H, CH3 or CH(CH3)2." } ]
6
US9550902_23.png
<markush><cxsmi><r>Re</r>C(C)(C)CC|Sg:n:4:e:ht</cxsmi><stable>Re:hydrogen<n>methyl<ns>e:0-3</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 6 5 1 0 0 M V30 BEGIN ATOM M V30 1 C 1.299038 3.348076 0.000000 0 M V30 2 C 0.549038 2.049038 0.000000 0 M V30 3 C 1.299038 0.750000 0.000000 0 M V30 4 C 2.598076 1.500000 0.000000 0 M V30 5 C 2.049038 -0.549038 0.000000 0 M V30 6 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 3 4 M V30 4 1 3 5 M V30 5 1 3 6 M V30 END BOND M V30 BEGIN SGROUP M V30 1 SRU 0 ATOMS=(1 2) XBONDS=(2 1 2) XBHEAD=(1 1) XBCORR=(2 1 2) - M V30 CONNECT=HT LABEL=e M V30 END SGROUP M V30 END CTAB M END
*C(C)(C)CC |$Re;;;;;$,Sg:n:4:e:ht:::,|
*C(C)(C)CC |$Re;;;;;$,Sg:n:4:e:ht:::,|
<r>Re</r>C(C)(C)CC|Sg:n:4:e:ht
null
[ { "bbox": [ 0.3720703125, 0.4326171875, 0.3828125, 0.443359375 ], "text": "e" }, { "bbox": [ 0.4658203125, 0.4130859375, 0.4931640625, 0.43359375 ], "text": "Re" }, { "bbox": [ 0.04296875, 0.5712890625, 0.955078125, 0.6083984375 ], "text": "wherein Re is hydrogen or methyl, and e is an integer of 0" }, { "bbox": [ 0.0439453125, 0.6142578125, 0.1103515625, 0.640625 ], "text": "to 3." } ]
7
US10526338B2_17_c.png
<markush><cxsmi><r>R1</r>C.<r>R2</r>C.<r>R3</r>C(C)(C)C(CC(=O)O)NC1=C(F)C=<r>X</r>C(C2=CNC3=<r>Y</r>C=<r>Z</r>C=C23)=N1|m:1:23.24.25.26.27.28,m:3:14.15.17.18.19.29</cxsmi><stable>Y:N<ns>X:C<n>N<ns>Z:C<n>N<ns>R1:halogen<n>H<ns>R2:H<n>CN<ns>R3:heterocycle<n>OCH3</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 30 30 0 0 0 M V30 BEGIN ATOM M V30 1 C -6.228036 -4.932229 0.000000 0 M V30 2 C -7.231732 -6.046946 0.000000 0 M V30 3 C -8.346449 -5.043250 0.000000 0 M V30 4 R -8.235428 -7.161663 0.000000 0 VAL=1 M V30 5 C -6.117015 -7.050642 0.000000 0 M V30 6 C -6.428882 -8.517864 0.000000 0 M V30 7 C -7.855467 -8.981389 0.000000 0 M V30 8 O -8.167335 -10.448610 0.000000 0 M V30 9 O -8.970184 -7.977693 0.000000 0 M V30 10 N -4.690430 -6.587117 0.000000 0 M V30 11 C -4.378563 -5.119895 0.000000 0 M V30 12 C -4.066695 -3.652674 0.000000 0 M V30 13 F -3.271472 -3.597110 0.000000 0 M V30 14 C -5.181412 -2.648978 0.000000 0 M V30 15 R -3.754828 -2.185452 0.000000 0 VAL=3 M V30 16 C -2.640110 -3.189148 0.000000 0 M V30 17 N -2.951978 -4.656370 0.000000 0 M V30 18 C -1.213525 -2.725623 0.000000 0 M V30 19 C -0.000000 -3.607301 0.000000 0 M V30 20 N 1.213525 -2.725623 0.000000 0 M V30 21 C 0.750000 -1.299038 0.000000 0 M V30 22 R 1.500000 0.000000 0.000000 0 VAL=3 M V30 23 C 0.750000 1.299038 0.000000 0 M V30 24 R -0.750000 1.299038 0.000000 0 VAL=3 M V30 25 C -0.000000 -0.000000 0.000000 0 M V30 26 C -0.750000 -1.299038 0.000000 0 M V30 27 C 3.799038 0.750000 0.000000 0 M V30 28 R 2.500000 0.000000 0.000000 0 VAL=1 M V30 29 C 1.299038 3.049038 0.000000 0 M V30 30 R 0.000000 2.299038 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 4 1 2 5 M V30 5 1 5 6 M V30 6 1 6 7 M V30 7 1 7 8 M V30 8 2 7 9 M V30 9 1 5 10 M V30 10 1 10 11 M V30 11 2 11 12 M V30 12 1 12 13 M V30 13 1 12 14 M V30 14 2 14 15 M V30 15 1 15 16 M V30 16 2 16 17 M V30 17 1 16 18 M V30 18 2 18 19 M V30 19 1 19 20 M V30 20 1 20 21 M V30 21 2 21 22 M V30 22 1 22 23 M V30 23 2 23 24 M V30 24 1 24 25 M V30 25 2 25 26 M V30 26 1 27 28 ENDPTS=(6 23 22 24 21 26 25) ATTACH=ANY M V30 27 1 29 30 ENDPTS=(6 15 14 16 17 11 12) ATTACH=ANY M V30 28 1 17 11 M V30 29 1 26 18 M V30 30 1 26 21 M V30 END BOND M V30 END CTAB M END
*C.*C.*C(C)(C)C(CC(=O)O)NC1=C(F)C=*C(C2=CNC3=*C=*C=C32)=N1 |$R1;;R2;;R3;;;;;;;;;;;;;;X;;;;;;Y;;Z;;;$,m:1:25.24.26.23.28.27,m:3:18.17.19.29.14.15|
*C.*C.*C(C)(C)C(CC(=O)O)NC1=C(F)C=*C(C2=CNC3=*C=*C=C32)=N1 |$R1;;R2;;R3;;;;;;;;;;;;;;X;;;;;;Y;;Z;;;$,m:1:25.24.26.23.28.27,m:3:18.17.19.29.14.15|
<r>R1</r>C.<r>R2</r>C.<r>R3</r>C(C)(C)C(CC(=O)O)NC1=C(F)C=<r>X</r>C(C2=CNC3=<r>Y</r>C=<r>Z</r>C=C23)=N1|m:1:23.24.25.26.27.28,m:3:14.15.17.18.19.29
null
[ { "bbox": [ 0.1123046875, 0.556640625, 0.146484375, 0.5859375 ], "text": "R1" }, { "bbox": [ 0.177734375, 0.5, 0.1982421875, 0.5263671875 ], "text": "Z" }, { "bbox": [ 0.240234375, 0.6123046875, 0.26171875, 0.63671875 ], "text": "Y" }, { "bbox": [ 0.373046875, 0.59765625, 0.3974609375, 0.6474609375 ], "text": "N" }, { "bbox": [ 0.3583984375, 0.3623046875, 0.3828125, 0.388671875 ], "text": "X" }, { "bbox": [ 0.3115234375, 0.2880859375, 0.34375, 0.3251953125 ], "text": "R2" }, { "bbox": [ 0.4716796875, 0.2001953125, 0.490234375, 0.224609375 ], "text": "F" }, { "bbox": [ 0.4833984375, 0.39453125, 0.505859375, 0.419921875 ], "text": "N" }, { "bbox": [ 0.5703125, 0.3046875, 0.623046875, 0.3330078125 ], "text": "N" }, { "bbox": [ 0.6064453125, 0.0556640625, 0.62890625, 0.078125 ], "text": "O" }, { "bbox": [ 0.6953125, 0.140625, 0.7421875, 0.169921875 ], "text": "O" }, { "bbox": [ 0.7197265625, 0.3046875, 0.7529296875, 0.3349609375 ], "text": "R3" }, { "bbox": [ 0.62109375, 0.796875, 0.955078125, 0.8359375 ], "text": "wherein Y is N, X is" }, { "bbox": [ 0.0439453125, 0.8505859375, 0.955078125, 0.8896484375 ], "text": "C or N, Z is C or N, R1 is halogen or H, R2 is H or CN," }, { "bbox": [ 0.0419921875, 0.904296875, 0.57421875, 0.943359375 ], "text": "and R3 is heterocycle or OCH3." } ]
8
WO2002010163A1_23.png
<markush><cxsmi><r>R</r>C(=O)C(<r>L</r>)<r>R1</r></cxsmi><stable>R:described hereinabove<ns>R1:described hereinabove<ns>L:halogen<n>sulfonate</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 6 5 0 0 0 M V30 BEGIN ATOM M V30 1 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 2 C 1.299038 0.750000 0.000000 0 M V30 3 R 2.598076 -0.000000 0.000000 0 VAL=1 M V30 4 C 1.299038 2.250000 0.000000 0 M V30 5 R 2.598076 3.000000 0.000000 0 VAL=1 M V30 6 O 0.000000 3.000000 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 4 1 4 5 M V30 5 2 4 6 M V30 END BOND M V30 END CTAB M END
*C(=O)C(*)* |$R;;;;L;R1$,|
*C(=O)C(*)* |$R;;;;L;R1$,|
<r>R</r>C(=O)C(<r>L</r>)<r>R1</r>
null
[ { "bbox": [ 0.7705078125, 0.2890625, 0.7998046875, 0.3203125 ], "text": "R" }, { "bbox": [ 0.822265625, 0.201171875, 0.8515625, 0.23046875 ], "text": "O" }, { "bbox": [ 0.876953125, 0.3427734375, 0.9169921875, 0.380859375 ], "text": "R1" }, { "bbox": [ 0.9296875, 0.259765625, 0.955078125, 0.2890625 ], "text": "L" }, { "bbox": [ 0.0439453125, 0.525390625, 0.2099609375, 0.5615234375 ], "text": "wherein:" }, { "bbox": [ 0.04296875, 0.6259765625, 0.8837890625, 0.6787109375 ], "text": "R and R1 are as described hereinabove; and" }, { "bbox": [ 0.044921875, 0.75, 0.5380859375, 0.794921875 ], "text": "L is halogen or sulfonate;" } ]
9
WO2002010163A1_29_2.png
<markush><cxsmi><r>Z</r>C(=<r>Y</r>)SC(<r>R3</r>)(<r>R2</r>)C1=NC(<r>R1</r>)=C(<r>R</r>)O1</cxsmi><stable>R:alkyl<n>aryl<n>heteroaryl<ns>R1:hydrogen<n>alkyl<n>aryl<n>heteroaryl<ns>R2:hydrogen<n>alkyl<n>aryl<n>heteroaryl<ns>R3:hydrogen<n>alkyl<n>aryl<n>heteroaryl<ns>Y:O<n>S<n>NH<n>N-alkyl<n>N-aryl<n>N-acyl<ns>Z:hydrogen<n>alkyl<n>aryl<n>O-alkyl<n>O-aryl<n>S-alkyl<n>S-aryl<n>NH2<n>N-alkyl<n>N-aryl<n>N-acyl</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 14 14 0 0 0 M V30 BEGIN ATOM M V30 1 R 6.525976 1.299038 0.000000 0 VAL=1 M V30 2 C 5.025976 1.299038 0.000000 0 M V30 3 R 4.275976 2.598076 0.000000 0 VAL=2 M V30 4 S 4.275976 0.000000 0.000000 0 M V30 5 C 2.775976 0.000000 0.000000 0 M V30 6 R 2.775976 1.500000 0.000000 0 VAL=1 M V30 7 R 2.775976 -1.500000 0.000000 0 VAL=1 M V30 8 C 1.275976 0.000000 0.000000 0 M V30 9 N 0.394298 1.213525 0.000000 0 M V30 10 C 0.394298 -0.286475 0.000000 0 M V30 11 R 1.607824 -1.168152 0.000000 0 VAL=1 M V30 12 C -1.032286 -0.750000 0.000000 0 M V30 13 R -2.245812 -1.631678 0.000000 0 VAL=1 M V30 14 O 0.394298 -1.213525 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 2 4 M V30 4 1 4 5 M V30 5 1 5 6 M V30 6 1 5 7 M V30 7 1 5 8 M V30 8 2 8 9 M V30 9 1 9 10 M V30 10 1 10 11 M V30 11 2 10 12 M V30 12 1 12 13 M V30 13 1 12 14 M V30 14 1 14 8 M V30 END BOND M V30 END CTAB M END
*C(=*)SC(*)(*)C1=NC(*)=C(*)O1 |$Z;;Y;;;R3;R2;;;;R1;;R;$,|
*C(=*)SC(*)(*)C1=NC(*)=C(*)O1 |$Z;;Y;;;R3;R2;;;;R1;;R;$,|
<r>Z</r>C(=<r>Y</r>)SC(<r>R3</r>)(<r>R2</r>)C1=NC(<r>R1</r>)=C(<r>R</r>)O1
null
[ { "bbox": [ 0.44140625, 0.25, 0.4638671875, 0.275390625 ], "text": "R1" }, { "bbox": [ 0.4404296875, 0.3291015625, 0.4599609375, 0.3486328125 ], "text": "R" }, { "bbox": [ 0.498046875, 0.267578125, 0.5126953125, 0.2841796875 ], "text": "N" }, { "bbox": [ 0.5, 0.318359375, 0.5146484375, 0.337890625 ], "text": "O" }, { "bbox": [ 0.552734375, 0.3232421875, 0.5771484375, 0.34375 ], "text": "R2" }, { "bbox": [ 0.5703125, 0.265625, 0.5830078125, 0.2822265625 ], "text": "S" }, { "bbox": [ 0.5830078125, 0.306640625, 0.6044921875, 0.3291015625 ], "text": "R3" }, { "bbox": [ 0.619140625, 0.236328125, 0.6328125, 0.25 ], "text": "Y" }, { "bbox": [ 0.619140625, 0.294921875, 0.6328125, 0.3125 ], "text": "Z" }, { "bbox": [ 0.0419921875, 0.484375, 0.34765625, 0.5126953125 ], "text": "R is alkyl, aryl or heteroaryl;" }, { "bbox": [ 0.04296875, 0.5458984375, 0.8115234375, 0.5751953125 ], "text": "R1, R2 and R3 are each independently hydrogen, alkyl, aryl or heteroaryl;" }, { "bbox": [ 0.0439453125, 0.6123046875, 0.52734375, 0.63671875 ], "text": "Y is O, S, NH, N-alkyl, N-aryl or N-acyl; and" }, { "bbox": [ 0.0439453125, 0.673828125, 0.9521484375, 0.6982421875 ], "text": "Z is hydrogen, alkyl, aryl, O-alkyl, O-aryl, S-alkyl, S-aryl, NH2, N-alkyl, N-aryl or N-" }, { "bbox": [ 0.0439453125, 0.7373046875, 0.09375, 0.759765625 ], "text": "acyl;" } ]
10
06521785_9.png
<markush><cxsmi><r>R4</r>[N+]([H])(<r>R5</r>O[H])<r>R5</r>O[H]|Sg:n:6,7:x:ht,Sg:n:3,4:y:ht</cxsmi><stable>R4:C7-C24 alkyl<n>C2-C24 alkenyl—CH2—<ns>R5:a straight or branched chain C2-C4 alkylene<ns>x:1-50<ns>y:0-50</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 9 8 2 0 0 M V30 BEGIN ATOM M V30 1 H 3.897114 3.750000 0.000000 0 M V30 2 O 2.598076 3.000000 0.000000 0 M V30 3 R 2.598076 1.500000 0.000000 0 VAL=2 M V30 4 N 1.299038 0.750000 0.000000 0 CHG=1 VAL=4 M V30 5 H 0.549038 2.049038 0.000000 0 M V30 6 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 7 R 2.049038 -0.549038 0.000000 0 VAL=2 M V30 8 O 3.549038 -0.549038 0.000000 0 M V30 9 H 4.299038 -1.848076 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 3 4 M V30 4 1 4 5 M V30 5 1 4 6 M V30 6 1 4 7 M V30 7 1 7 8 M V30 8 1 8 9 M V30 END BOND M V30 BEGIN SGROUP M V30 1 SRU 0 ATOMS=(2 7 8) XBONDS=(2 6 8) XBHEAD=(1 6) XBCORR=(2 6 8) - M V30 CONNECT=HT LABEL=x M V30 2 SRU 0 ATOMS=(2 3 2) XBONDS=(2 3 1) XBHEAD=(1 3) XBCORR=(2 3 1) - M V30 CONNECT=HT LABEL=y M V30 END SGROUP M V30 END CTAB M END
*[N+]([H])(*O[H])*O[H] |$R4;;;R5;;;R5;;$,,,Sg:n:6,7:x:ht:::,Sg:n:3,4:y:ht:::,|
*[N+]([H])(*O[H])*O[H] |$R4;;;R5;;;R5;;$,,,Sg:n:6,7:x:ht:::,Sg:n:3,4:y:ht:::,|
<r>R4</r>[N+]([H])(<r>R5</r>O[H])<r>R5</r>O[H]|Sg:n:6,7:x:ht,Sg:n:3,4:y:ht
null
[ { "bbox": [ 0.091796875, 0.2451171875, 0.1171875, 0.2705078125 ], "text": "H" }, { "bbox": [ 0.208984375, 0.24609375, 0.259765625, 0.2763671875 ], "text": "R5O" }, { "bbox": [ 0.271484375, 0.2626953125, 0.2822265625, 0.275390625 ], "text": "x" }, { "bbox": [ 0.3095703125, 0.2470703125, 0.333984375, 0.26953125 ], "text": "H" }, { "bbox": [ 0.1416015625, 0.2939453125, 0.1748046875, 0.3193359375 ], "text": "N+1" }, { "bbox": [ 0.091796875, 0.345703125, 0.123046875, 0.3740234375 ], "text": "R4" }, { "bbox": [ 0.208984375, 0.345703125, 0.259765625, 0.3720703125 ], "text": "R5O" }, { "bbox": [ 0.2734375, 0.36328125, 0.2822265625, 0.3798828125 ], "text": "y" }, { "bbox": [ 0.3095703125, 0.345703125, 0.3330078125, 0.37109375 ], "text": "H" }, { "bbox": [ 0.0439453125, 0.4794921875, 0.9580078125, 0.5185546875 ], "text": "wherein R4 is selected from the group consisting of" }, { "bbox": [ 0.0810546875, 0.5283203125, 0.951171875, 0.5693359375 ], "text": "C7-C24 alkyl and C2-C24 alkenyl—CH2—, each R5" }, { "bbox": [ 0.083984375, 0.5791015625, 0.951171875, 0.6142578125 ], "text": "independently is a straight chain or branched C2-C4" }, { "bbox": [ 0.0830078125, 0.625, 0.951171875, 0.6611328125 ], "text": "alkylene, x is a number from 1-50 and y is a number" }, { "bbox": [ 0.080078125, 0.6728515625, 0.951171875, 0.7099609375 ], "text": "from 0 to 50, wherein the salt compound has a pH of" }, { "bbox": [ 0.0830078125, 0.720703125, 0.185546875, 0.7548828125 ], "text": "4 to 6." } ]
11
07083908_90_c.png
<markush><cxsmi><r>R</r>C.C1=CC2=C(C=C1)NN=N2|m:1:2.3.4.5.6.7</cxsmi><stable>R:a hydrogen atom<n>an alkyl group having 1 to 4 carbon atoms<n>an aryl group<n>a halogen atom<n>an amino group<n>a nitro group<n>an alkoxycarbonyl group<n>a substituted or non-substituted carboxy group<n>a sulfonic group</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 11 11 0 0 0 M V30 BEGIN ATOM M V30 1 C 3.302734 0.750000 0.000000 0 M V30 2 R 2.003696 0.000000 0.000000 0 M V30 3 N -0.620318 -0.688933 0.000000 0 M V30 4 N -0.463525 0.802850 0.000000 0 M V30 5 N 1.003696 1.114717 0.000000 0 M V30 6 C -0.000000 -0.000000 0.000000 0 M V30 7 C 0.750000 -1.299038 0.000000 0 M V30 8 C 0.064922 -1.150585 0.000000 0 M V30 9 C 0.540763 -0.715965 0.000000 0 M V30 10 C -0.633585 -0.738296 0.000000 0 M V30 11 C 0.268705 -0.198993 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 ENDPTS=(6 8 7 6 9 10 11) ATTACH=ANY M V30 2 1 3 4 M V30 3 2 4 5 M V30 4 1 5 6 M V30 5 2 6 7 M V30 6 1 7 8 M V30 7 2 8 9 M V30 8 1 9 10 M V30 9 2 10 11 M V30 10 1 7 3 M V30 11 1 11 6 M V30 END BOND M V30 END CTAB M END
*C.C1=CC2=C(C=C1)NN=N2 |$R;;;;;;;;;;$,m:0:6.5.4.7.2.3|
*C.C1=CC2=C(C=C1)NN=N2 |$R;;;;;;;;;;$,m:0:6.5.4.7.2.3|
<r>R</r>C.C1=CC2=C(C=C1)NN=N2|m:1:2.3.4.5.6.7
null
[ { "bbox": [ 0.279296875, 0.3564453125, 0.296875, 0.3798828125 ], "text": "R" }, { "bbox": [ 0.5068359375, 0.3046875, 0.525390625, 0.322265625 ], "text": "N" }, { "bbox": [ 0.5390625, 0.244140625, 0.5595703125, 0.265625 ], "text": "H" }, { "bbox": [ 0.54296875, 0.3564453125, 0.5654296875, 0.3798828125 ], "text": "N" }, { "bbox": [ 0.505859375, 0.412109375, 0.525390625, 0.4326171875 ], "text": "N" }, { "bbox": [ 0.0439453125, 0.55078125, 0.953125, 0.58203125 ], "text": "wherein R represents a hydrogen atom, an alkyl group" }, { "bbox": [ 0.0439453125, 0.591796875, 0.9501953125, 0.623046875 ], "text": "having 1 to 4 carbon atoms, an aryl group, a halogen atom," }, { "bbox": [ 0.044921875, 0.6337890625, 0.955078125, 0.6650390625 ], "text": "an amino group, a nitro group, an alkoxycarbonyl group, a" }, { "bbox": [ 0.0439453125, 0.67578125, 0.953125, 0.7099609375 ], "text": "substituted or non-substituted carboxy] group or salt thereof," }, { "bbox": [ 0.0439453125, 0.716796875, 0.5771484375, 0.751953125 ], "text": "or a sulfonic group or salt thereof;" } ]
12
07083908_91.png
<markush><cxsmi><r>R1</r>C(<r>R2</r>)C(<r>X</r>)C#N</cxsmi><stable>R1:a hydroxyl group<n>a metal salt of a hydroxyl group<ns>R2:an alkyl group<n>an aryl group<ns>X:an electron withdrawing group</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 7 6 0 0 0 M V30 BEGIN ATOM M V30 1 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 2 C 1.299038 0.750000 0.000000 0 M V30 3 R 2.598076 -0.000000 0.000000 0 VAL=1 M V30 4 C 1.299038 2.250000 0.000000 0 M V30 5 R 2.598076 3.000000 0.000000 0 VAL=1 M V30 6 C 0.000000 3.000000 0.000000 0 M V30 7 N 0.000000 4.500000 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 4 1 4 5 M V30 5 1 4 6 M V30 6 3 6 7 M V30 END BOND M V30 END CTAB M END
*C(*)C(*)C#N |$R1;;R2;;X;;$,|
*C(*)C(*)C#N |$R1;;R2;;X;;$,|
<r>R1</r>C(<r>R2</r>)C(<r>X</r>)C#N
null
[ { "bbox": [ 0.1298828125, 0.27734375, 0.15234375, 0.298828125 ], "text": "X" }, { "bbox": [ 0.25, 0.2783203125, 0.2919921875, 0.30078125 ], "text": "CN" }, { "bbox": [ 0.119140625, 0.4091796875, 0.1484375, 0.4384765625 ], "text": "R1" }, { "bbox": [ 0.2509765625, 0.4111328125, 0.279296875, 0.4384765625 ], "text": "R2" }, { "bbox": [ 0.0439453125, 0.5166015625, 0.9501953125, 0.5498046875 ], "text": "wherein R1 represents a hydroxyl group or a metal salt of a" }, { "bbox": [ 0.044921875, 0.5595703125, 0.94921875, 0.59375 ], "text": "hydroxyl group; R2 represents an alkyl group or an aryl" }, { "bbox": [ 0.044921875, 0.6025390625, 0.955078125, 0.6357421875 ], "text": "group; and X represents an electron withdrawing group, or" }, { "bbox": [ 0.0439453125, 0.64453125, 0.9501953125, 0.6767578125 ], "text": "R1 and X together form a ring containing an electron" }, { "bbox": [ 0.0439453125, 0.6845703125, 0.345703125, 0.7197265625 ], "text": "withdrawing group." } ]
13
EP1337602B1_13_c.png
<markush><cxsmi><r>R1</r>C1(C<r>X</r><r>Y</r><r>Z</r><r>M</r><r>Z'</r><r>Y'</r><r>X'</r>CC2(<r>R2</r>)COC2)COC1</cxsmi><stable>R1:straight or branched C1-C4 alkyl<n>hydrogen<ns>R2:straight or branched C1-C4 alkyl<n>hydrogen<ns>X:oxygen<n>sulfur<n>a single covalent bond<n>-O-CO-<n>-CO-O-<n>-O-CO-O-<ns>X':oxygen<n>sulfur<n>a single covalent bond<n>-O-CO-<n>-CO-O-<n>-O-CO-O-<ns>Y:spacer groups having each independently 1 to 30 carbon atoms (linear or branched)<ns>Y':spacer groups having each independently 1 to 30 carbon atoms (linear or branched)<ns>Z:oxygen<n>sulfur<n>a single covalent bond<n>-O-CO-<n>-CO-O-<n>-O-CO-<n>O-<ns>Z':oxygen<n>sulfur<n>a single covalent bond<n>-O-CO-<n>-CO-O-<n>-O-CO-<n>O-<ns>M:any suitable mesogenic group</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 19 20 0 0 0 M V30 BEGIN ATOM M V30 1 R -12.159516 -2.973929 0.000000 0 VAL=1 M V30 2 C -12.547745 -4.422818 0.000000 0 M V30 3 C -11.098856 -4.811047 0.000000 0 M V30 4 R -10.038196 -3.750387 0.000000 0 VAL=2 M V30 5 R -8.589307 -4.138615 0.000000 0 VAL=2 M V30 6 R -7.528647 -3.077955 0.000000 0 VAL=2 M V30 7 R -6.079758 -3.466184 0.000000 0 VAL=2 M V30 8 R -5.019098 -2.405523 0.000000 0 VAL=2 M V30 9 R -3.570209 -2.793752 0.000000 0 VAL=2 M V30 10 R -2.509549 -1.733092 0.000000 0 VAL=2 M V30 11 C -1.060660 -2.121320 0.000000 0 M V30 12 C -0.000000 -1.060660 0.000000 0 M V30 13 R 1.060660 -2.121320 0.000000 0 VAL=1 M V30 14 C 1.060660 0.000000 0.000000 0 M V30 15 O 0.000000 1.060660 0.000000 0 M V30 16 C -1.060660 0.000000 0.000000 0 M V30 17 C -12.935973 -5.871707 0.000000 0 M V30 18 O -14.384862 -5.483478 0.000000 0 M V30 19 C -13.996633 -4.034590 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 3 4 M V30 4 1 4 5 M V30 5 1 5 6 M V30 6 1 6 7 M V30 7 1 7 8 M V30 8 1 8 9 M V30 9 1 9 10 M V30 10 1 10 11 M V30 11 1 11 12 M V30 12 1 12 13 M V30 13 1 12 14 M V30 14 1 14 15 M V30 15 1 15 16 M V30 16 1 2 17 M V30 17 1 17 18 M V30 18 1 18 19 M V30 19 1 19 2 M V30 20 1 16 12 M V30 END BOND M V30 END CTAB M END
*C1(C*******CC2(*)COC2)COC1 |$R1;;;X;Y;Z;M;Z';Y';X';;;R2;;;;;;$,|
*C1(C*******CC2(*)COC2)COC1 |$R1;;;X;Y;Z;M;Z';Y';X';;;R2;;;;;;$,|
<r>R1</r>C1(C<r>X</r><r>Y</r><r>Z</r><r>M</r><r>Z'</r><r>Y'</r><r>X'</r>CC2(<r>R2</r>)COC2)COC1
null
[ { "bbox": [ 0.083984375, 0.28515625, 0.1025390625, 0.3046875 ], "text": "O" }, { "bbox": [ 0.181640625, 0.3291015625, 0.2060546875, 0.3525390625 ], "text": "R1" }, { "bbox": [ 0.2216796875, 0.4091796875, 0.2373046875, 0.4287109375 ], "text": "X" }, { "bbox": [ 0.2802734375, 0.4091796875, 0.298828125, 0.4287109375 ], "text": "Y" }, { "bbox": [ 0.3505859375, 0.4091796875, 0.3681640625, 0.4287109375 ], "text": "Z" }, { "bbox": [ 0.4091796875, 0.4091796875, 0.4296875, 0.4296875 ], "text": "M" }, { "bbox": [ 0.4765625, 0.4091796875, 0.4970703125, 0.427734375 ], "text": "Z'" }, { "bbox": [ 0.54296875, 0.4091796875, 0.5625, 0.427734375 ], "text": "Y'" }, { "bbox": [ 0.6171875, 0.4072265625, 0.634765625, 0.4267578125 ], "text": "X'" }, { "bbox": [ 0.65234375, 0.3251953125, 0.6787109375, 0.3515625 ], "text": "R2" }, { "bbox": [ 0.759765625, 0.2822265625, 0.779296875, 0.30078125 ], "text": "O" }, { "bbox": [ 0.0439453125, 0.505859375, 0.109375, 0.521484375 ], "text": "wherein:" }, { "bbox": [ 0.078125, 0.5546875, 0.806640625, 0.5712890625 ], "text": "R1 and R2 are independently selected from straight or branched C1-C4 alkyl and hydrogen;" }, { "bbox": [ 0.078125, 0.576171875, 0.955078125, 0.5966796875 ], "text": "X and X’ are independently selected from oxygen, sulfur, a single covalent bond, -O-CO-, -CO-O-, and -O-CO-O-;" }, { "bbox": [ 0.0791015625, 0.6025390625, 0.955078125, 0.619140625 ], "text": "Y and Y’ are spacer groups having each independently 1 to 30 carbon atoms (linear or branched), in which the" }, { "bbox": [ 0.076171875, 0.626953125, 0.884765625, 0.6435546875 ], "text": "carbon chain may be interrupted by oxygen in the ether function or by sulfur in the thioether function;" }, { "bbox": [ 0.078125, 0.650390625, 0.9560546875, 0.66796875 ], "text": "Z and Z’ are independently selected from oxygen, sulfur, a single covalent bond, -O-CO-, -CO-O-, and -O-CO-" }, { "bbox": [ 0.078125, 0.673828125, 0.140625, 0.69140625 ], "text": "O-; and" }, { "bbox": [ 0.0791015625, 0.6982421875, 0.3642578125, 0.7158203125 ], "text": "M is any suitable mesogenic group," } ]
14
EP1337602B1_14.png
<markush><cxsmi><r>R</r>C1=C(OC(=O)C2=CC=C(OCOCC3(C)COC3)C=C2)C=CC(OC(=O)C2=CC=C(OCOC3(C)COC3)C=C2)=C1|Sg:n:32:n:ht,Sg:n:11:n:ht</cxsmi><stable>R:methyl<ns>n:4-6</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 42 46 2 0 0 M V30 BEGIN ATOM M V30 1 C 2.799038 -7.044229 0.000000 0 M V30 2 C 1.500000 -7.794229 0.000000 0 M V30 3 C 0.750000 -6.495191 0.000000 0 M V30 4 O 1.500000 -5.196152 0.000000 0 M V30 5 C 0.750000 -3.897114 0.000000 0 M V30 6 O 1.500000 -2.598076 0.000000 0 M V30 7 C 0.750000 -1.299038 0.000000 0 M V30 8 C 1.500000 0.000000 0.000000 0 M V30 9 C 0.000000 0.000000 0.000000 0 M V30 10 C -0.750000 1.299038 0.000000 0 M V30 11 C -1.500000 0.000000 0.000000 0 M V30 12 C -0.750000 -1.299038 0.000000 0 M V30 13 C -1.500000 2.598076 0.000000 0 M V30 14 O -0.750000 3.897114 0.000000 0 M V30 15 O -3.000000 2.598076 0.000000 0 M V30 16 C -4.100000 4.503332 0.000000 0 M V30 17 C -3.350000 4.589935 0.000000 0 M V30 18 R -3.750000 6.495191 0.000000 0 VAL=1 M V30 19 C -3.050000 3.897114 0.000000 0 M V30 20 C -3.606218 2.948076 0.000000 0 M V30 21 O -2.250000 1.299038 0.000000 0 M V30 22 C -3.000000 0.000000 0.000000 0 M V30 23 O -4.500000 0.000000 0.000000 0 M V30 24 C -2.250000 -1.299038 0.000000 0 M V30 25 C -0.750000 -1.299038 0.000000 0 M V30 26 C -1.500000 -2.598076 0.000000 0 M V30 27 C -0.750000 -3.897114 0.000000 0 M V30 28 O -0.000000 -5.196152 0.000000 0 M V30 29 C -0.750000 -6.495191 0.000000 0 M V30 30 O -0.000000 -7.794229 0.000000 0 M V30 31 C -0.750000 -9.093267 0.000000 0 M V30 32 C 0.328954 -10.135312 0.000000 0 M V30 33 C -2.049038 -8.343267 0.000000 0 M V30 34 O -2.799038 -9.642305 0.000000 0 M V30 35 C -1.500000 -10.392305 0.000000 0 M V30 36 C -2.250000 -3.897114 0.000000 0 M V30 37 C -3.000000 -2.598076 0.000000 0 M V30 38 C -4.150000 3.204294 0.000000 0 M V30 39 C -4.643782 3.547114 0.000000 0 M V30 40 C 0.200962 -8.544229 0.000000 0 M V30 41 O 0.950962 -9.843267 0.000000 0 M V30 42 C 2.250000 -9.093267 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 3 4 M V30 4 1 4 5 M V30 5 1 5 6 M V30 6 1 6 7 M V30 7 2 7 8 M V30 8 1 8 9 M V30 9 2 9 10 M V30 10 1 10 11 M V30 11 2 11 12 M V30 12 1 10 13 M V30 13 2 13 14 M V30 14 1 13 15 M V30 15 1 15 16 M V30 16 2 16 17 M V30 17 1 17 18 M V30 18 1 17 19 M V30 19 2 19 20 M V30 20 1 20 21 M V30 21 1 21 22 M V30 22 2 22 23 M V30 23 1 22 24 M V30 24 2 24 25 M V30 25 1 25 26 M V30 26 2 26 27 M V30 27 1 27 28 M V30 28 1 28 29 M V30 29 1 29 30 M V30 30 1 30 31 M V30 31 1 31 32 M V30 32 1 31 33 M V30 33 1 33 34 M V30 34 1 34 35 M V30 35 1 27 36 M V30 36 2 36 37 M V30 37 1 20 38 M V30 38 2 38 39 M V30 39 1 2 40 M V30 40 1 40 41 M V30 41 1 41 42 M V30 42 1 42 2 M V30 43 1 12 7 M V30 44 1 39 16 M V30 45 1 37 24 M V30 46 1 35 31 M V30 END BOND M V30 BEGIN SGROUP M V30 1 SRU 0 ATOMS=(1 29) XBONDS=(2 28 29) XBHEAD=(1 28) XBCORR=(2 28 29) - M V30 CONNECT=HT LABEL=n M V30 2 SRU 0 ATOMS=(1 5) XBONDS=(2 4 5) XBHEAD=(1 4) XBCORR=(2 4 5) - M V30 CONNECT=HT LABEL=n M V30 END SGROUP M V30 END CTAB M END
*C1=C(OC(=O)C2=CC=C(OCOCC3(C)COC3)C=C2)C=CC(OC(=O)C2=CC=C(OCOC3(C)COC3)C=C2)=C1 |$R;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;$,,,Sg:n:32:n:ht:::,Sg:n:11:n:ht:::,|
*C1=C(OC(=O)C2=CC=C(OCOCC3(C)COC3)C=C2)C=CC(OC(=O)C2=CC=C(OCOC3(C)COC3)C=C2)=C1 |$R;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;$,,,Sg:n:32:n:ht:::,Sg:n:11:n:ht:::,|
<r>R</r>C1=C(OC(=O)C2=CC=C(OCOCC3(C)COC3)C=C2)C=CC(OC(=O)C2=CC=C(OCOC3(C)COC3)C=C2)=C1|Sg:n:32:n:ht,Sg:n:11:n:ht
null
[ { "bbox": [ 0.0439453125, 0.41015625, 0.0595703125, 0.4296875 ], "text": "O" }, { "bbox": [ 0.15625, 0.4560546875, 0.2578125, 0.4794921875 ], "text": "O(CH2)nO" }, { "bbox": [ 0.4140625, 0.421875, 0.431640625, 0.4423828125 ], "text": "O" }, { "bbox": [ 0.4130859375, 0.48828125, 0.4296875, 0.50390625 ], "text": "O" }, { "bbox": [ 0.529296875, 0.4228515625, 0.5439453125, 0.4423828125 ], "text": "R" }, { "bbox": [ 0.5654296875, 0.4228515625, 0.5830078125, 0.439453125 ], "text": "O" }, { "bbox": [ 0.564453125, 0.4873046875, 0.58203125, 0.505859375 ], "text": "O" }, { "bbox": [ 0.73828125, 0.455078125, 0.83984375, 0.4794921875 ], "text": "O(CH2)nO" }, { "bbox": [ 0.9365234375, 0.4091796875, 0.9521484375, 0.431640625 ], "text": "O" }, { "bbox": [ 0.0546875, 0.5791015625, 0.380859375, 0.5966796875 ], "text": "wherein R is methyl and n is 4, 5 or 6." } ]
15
EP12764969NWB2_43.png
<markush><cxsmi><r>R1</r><r>R2</r>OOP(=O)(O<r>M1</r>)O<r>M2</r>|Sg:n:1,2:n:ht</cxsmi><stable>R1:a hydrocarbon group<ns>R2:a hydrocarbon group<ns>M1:an alkali metal<ns>M2:an alkali metal<n>a hydrogen atom<n>a hydrocarbon group<n>a hydrocarbon group containing an oxygen atom(s)<ns>n:1-</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 10 9 1 0 0 M V30 BEGIN ATOM M V30 1 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 2 O 1.299038 0.750000 0.000000 0 M V30 3 P 2.598076 -0.000000 0.000000 0 M V30 4 O 3.897114 -0.750000 0.000000 0 M V30 5 O 1.848076 -1.299038 0.000000 0 M V30 6 R 2.598076 -2.598076 0.000000 0 VAL=1 M V30 7 O 3.348076 1.299038 0.000000 0 M V30 8 O 4.848076 1.299038 0.000000 0 M V30 9 R 5.598076 2.598076 0.000000 0 VAL=2 M V30 10 R 7.098076 2.598076 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 2 3 4 M V30 4 1 3 5 M V30 5 1 5 6 M V30 6 1 3 7 M V30 7 1 7 8 M V30 8 1 8 9 M V30 9 1 9 10 M V30 END BOND M V30 BEGIN SGROUP M V30 1 SRU 0 ATOMS=(2 9 8) XBONDS=(2 9 7) XBHEAD=(1 9) XBCORR=(2 9 7) - M V30 CONNECT=HT LABEL=n M V30 END SGROUP M V30 END CTAB M END
**OOP(=O)(O*)O* |$R1;R2;;;;;;M1;;M2$,Sg:n:1,2:n:ht:::,|
**OOP(=O)(O*)O* |$R1;R2;;;;;;M1;;M2$,Sg:n:1,2:n:ht:::,|
<r>R1</r><r>R2</r>OOP(=O)(O<r>M1</r>)O<r>M2</r>|Sg:n:1,2:n:ht
null
[ { "bbox": [ 0.236328125, 0.41015625, 0.2666015625, 0.4365234375 ], "text": "R1" }, { "bbox": [ 0.2998046875, 0.4091796875, 0.3271484375, 0.435546875 ], "text": "R2" }, { "bbox": [ 0.349609375, 0.4130859375, 0.3671875, 0.43359375 ], "text": "O" }, { "bbox": [ 0.3916015625, 0.423828125, 0.4013671875, 0.4365234375 ], "text": "n" }, { "bbox": [ 0.4072265625, 0.4091796875, 0.42578125, 0.4296875 ], "text": "O" }, { "bbox": [ 0.4619140625, 0.4091796875, 0.4775390625, 0.4296875 ], "text": "P" }, { "bbox": [ 0.4599609375, 0.357421875, 0.4775390625, 0.3759765625 ], "text": "O" }, { "bbox": [ 0.5126953125, 0.4091796875, 0.5625, 0.435546875 ], "text": "OM1" }, { "bbox": [ 0.4619140625, 0.46875, 0.513671875, 0.4892578125 ], "text": "OM2" }, { "bbox": [ 0.0439453125, 0.521484375, 0.5048828125, 0.5400390625 ], "text": "Condition 1: R1 and R2 represent a hydrocarbon group;" }, { "bbox": [ 0.0439453125, 0.546875, 0.3994140625, 0.56640625 ], "text": "Condition 2: M1 represents an alkali metal;" }, { "bbox": [ 0.0439453125, 0.572265625, 0.9541015625, 0.591796875 ], "text": "Condition 3: M2 represents a group selected from an alkali metal, a hydrogen atom, a hydrocarbon group and" }, { "bbox": [ 0.0439453125, 0.5986328125, 0.4765625, 0.6162109375 ], "text": "a hydrocarbon group containing an oxygen atom(s);" }, { "bbox": [ 0.0439453125, 0.6220703125, 0.455078125, 0.6396484375 ], "text": "Condition 4: n represents an integer of 1 or more." } ]
16
EP14750931NWB1_98.png
<markush><cxsmi><r>Rd</r>C.<r>Rc</r>C.<r>B</r>C1=NN=C(C2=CC3=C(C=C2O)N=CC=C3)C=C1|m:1:11.12.16.17.18.19,m:3:11.12.16.17.18.19</cxsmi><stable>Rc:hydrogen<n>cyano<n>halogen<n>hydroxy<n>C1-C4alkyl<n>C2-C4alkenyl<n>C2-C4alkynyl<n>C1-C4alkoxy<n>C3-C7cycloalkyl<n>heterocyclyl<n>heteroaryl<n>heterocyclyl C1-C4alkyl<n>C1-C4alkyl aryl<n>C1-C4alkyl heterocyclyl<n>C1-C4alkyl heteroaryl<n>C1-C4alkoxy aryl<n>C1-C4alkoxy heterocyclyl<n>C1-C4alkoxy heteroaryl<n>C1-C4alkoxy substituted with hydroxy C1-C4alkoxy amino and mono-and di-C1-C4alkylamino<ns>Rd:hydrogen<n>cyano<n>halogen<n>hydroxy<n>C1-C4alkyl<n>C2-C4alkenyl<n>C2-C4alkynyl<n>C1-C4alkoxy<n>C3-C7cycloalkyl<n>heterocyclyl<n>heteroaryl<n>heterocyclyl C1-C4alkyl<n>C1-C4alkyl aryl<n>C1-C4alkyl heterocyclyl<n>C1-C4alkyl heteroaryl<n>C1-C4alkoxy aryl<n>C1-C4alkoxy heterocyclyl<n>C1-C4alkoxy heteroaryl<n>C1-C4alkoxy substituted with hydroxy C1-C4alkoxy amino and mono-and di-C1-C4alkylamino</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 22 22 0 0 0 M V30 BEGIN ATOM M V30 1 O 0.750000 -3.897114 0.000000 0 M V30 2 C 0.488429 -0.681071 0.000000 0 M V30 3 C 0.844211 -0.729312 0.000000 0 M V30 4 C -0.000000 -0.000000 0.000000 0 M V30 5 C 0.750000 -1.299038 0.000000 0 M V30 6 C 1.500000 0.000000 0.000000 0 M V30 7 C 0.750000 1.299038 0.000000 0 M V30 8 C -0.750000 1.299038 0.000000 0 M V30 9 N -1.500000 0.000000 0.000000 0 M V30 10 C 0.514535 -1.005668 0.000000 0 M V30 11 C 1.441926 -1.446927 0.000000 0 M V30 12 C -0.000000 -0.000000 0.000000 0 M V30 13 N -1.500000 0.000000 0.000000 0 M V30 14 N -0.750000 1.299038 0.000000 0 M V30 15 C -1.500000 2.598076 0.000000 0 M V30 16 R -2.250000 3.897114 0.000000 0 VAL=1 M V30 17 C 0.000000 2.598076 0.000000 0 M V30 18 C 0.750000 1.299038 0.000000 0 M V30 19 C 3.799038 0.750000 0.000000 0 M V30 20 R 2.500000 0.000000 0.000000 0 VAL=1 M V30 21 C 6.098076 0.750000 0.000000 0 M V30 22 R 4.799038 0.000000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 3 4 M V30 4 2 4 5 M V30 5 1 5 6 M V30 6 2 6 7 M V30 7 1 7 8 M V30 8 2 8 9 M V30 9 1 5 10 M V30 10 2 10 11 M V30 11 1 11 12 M V30 12 2 12 13 M V30 13 1 13 14 M V30 14 2 14 15 M V30 15 1 15 16 M V30 16 1 15 17 M V30 17 2 17 18 M V30 18 1 19 20 ENDPTS=(6 9 8 4 7 5 6) ATTACH=ANY M V30 19 1 21 22 ENDPTS=(6 7 5 6 9 8 4) ATTACH=ANY M V30 20 1 11 2 M V30 21 1 18 12 M V30 22 1 9 4 M V30 END BOND M V30 END CTAB M END
*C.*C.*C1=NN=C(C2=CC3=C(C=C2O)N=CC=C3)C=C1 |$Rd;;Rc;;B;;;;;;;;;;;;;;;;;$,m:1:16.17.12.18.11.19,m:3:18.11.19.16.17.12|
*C.*C.*C1=NN=C(C2=CC3=C(C=C2O)N=CC=C3)C=C1 |$Rd;;Rc;;B;;;;;;;;;;;;;;;;;$,m:1:16.17.12.18.11.19,m:3:18.11.19.16.17.12|
<r>Rd</r>C.<r>Rc</r>C.<r>B</r>C1=NN=C(C2=CC3=C(C=C2O)N=CC=C3)C=C1|m:1:11.12.16.17.18.19,m:3:11.12.16.17.18.19
null
[ { "bbox": [ 0.353515625, 0.4208984375, 0.3740234375, 0.443359375 ], "text": "Rd" }, { "bbox": [ 0.375, 0.3837890625, 0.3974609375, 0.404296875 ], "text": "Rc" }, { "bbox": [ 0.4052734375, 0.4482421875, 0.416015625, 0.46484375 ], "text": "N" }, { "bbox": [ 0.501953125, 0.4482421875, 0.5302734375, 0.4638671875 ], "text": "O" }, { "bbox": [ 0.525390625, 0.408203125, 0.5400390625, 0.4228515625 ], "text": "N" }, { "bbox": [ 0.5537109375, 0.396484375, 0.564453125, 0.4091796875 ], "text": "N" }, { "bbox": [ 0.5751953125, 0.3515625, 0.5869140625, 0.3671875 ], "text": "B" }, { "bbox": [ 0.04296875, 0.5302734375, 0.1064453125, 0.546875 ], "text": "wherein" }, { "bbox": [ 0.0439453125, 0.5546875, 0.955078125, 0.57421875 ], "text": "Rc and Rd are each, independently, selected from hydrogen, cyano, halogen, hydroxy, C1-C4alkyl, C2-C4alkenyl," }, { "bbox": [ 0.0439453125, 0.5791015625, 0.9560546875, 0.5966796875 ], "text": "C2-C4alkynyl, C1-C4alkoxy, C3-C7cycloalkyl, heterocyclyl, heteroaryl, heterocyclyl C1-C4alkyl, C1-C4alkyl aryl," }, { "bbox": [ 0.044921875, 0.6015625, 0.951171875, 0.619140625 ], "text": "C1-C4alkyl heterocyclyl, C1-C4alkyl heteroaryl, C1-C4alkoxy aryl, C1-C4alkoxy heterocyclyl, C1-C4alkoxy heteroaryl," }, { "bbox": [ 0.0439453125, 0.6259765625, 0.796875, 0.6435546875 ], "text": "C1-C4alkoxy substituted with hydroxy, C1-C4alkoxy, amino and mono-and di-C1-C4alkylamino." } ]
17
EP14750931NWB1_99.png
<markush><cxsmi><r>Rd</r>C.<r>Rc</r>C.<r>B</r>C1=NN=C(C2=CC3=C(C=CC=N3)C=C2O)C=C1|m:1:11.12.13.14.15.16,m:3:11.12.13.14.15.16</cxsmi><stable>Rc:hydrogen<n>cyano<n>halogen<n>hydroxy<n>C1-C4alkyl<n>C2-C4alkenyl<n>C2-C4alkynyl<n>C1-C4alkoxy<n>C3-C7cycloalkyl<n>heterocyclyl<n>heteroaryl<n>heterocyclyl C1-C4alkyl<n>C1-C4alkyl aryl<n>C1-C4alkyl heterocyclyl<n>C1-C4alkyl heteroaryl<n>C1-C4alkoxy aryl<n>C1-C4alkoxy heterocyclyl<n>C1-C4alkoxy heteroaryl<n>C1-C4alkoxy substituted with hydroxy C1-C4alkoxy amino and mono-and di-C1-C4alkylamino<ns>Rd:hydrogen<n>cyano<n>halogen<n>hydroxy<n>C1-C4alkyl<n>C2-C4alkenyl<n>C2-C4alkynyl<n>C1-C4alkoxy<n>C3-C7cycloalkyl<n>heterocyclyl<n>heteroaryl<n>heterocyclyl C1-C4alkyl<n>C1-C4alkyl aryl<n>C1-C4alkyl heterocyclyl<n>C1-C4alkyl heteroaryl<n>C1-C4alkoxy aryl<n>C1-C4alkoxy heterocyclyl<n>C1-C4alkoxy heteroaryl<n>C1-C4alkoxy substituted with hydroxy C1-C4alkoxy amino and mono-and di-C1-C4alkylamino</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 22 22 0 0 0 M V30 BEGIN ATOM M V30 1 O 0.750000 -3.897114 0.000000 0 M V30 2 C 0.488429 -0.681071 0.000000 0 M V30 3 C 0.844211 -0.729312 0.000000 0 M V30 4 C -0.000000 -0.000000 0.000000 0 M V30 5 C 0.750000 -1.299038 0.000000 0 M V30 6 C 0.514535 -1.005668 0.000000 0 M V30 7 C 1.441926 -1.446927 0.000000 0 M V30 8 C -0.000000 -0.000000 0.000000 0 M V30 9 N -1.500000 0.000000 0.000000 0 M V30 10 N -0.750000 1.299038 0.000000 0 M V30 11 C -1.500000 2.598076 0.000000 0 M V30 12 R -2.250000 3.897114 0.000000 0 VAL=1 M V30 13 C 0.000000 2.598076 0.000000 0 M V30 14 C 0.750000 1.299038 0.000000 0 M V30 15 N 1.500000 0.000000 0.000000 0 M V30 16 C 0.750000 1.299038 0.000000 0 M V30 17 C -0.750000 1.299038 0.000000 0 M V30 18 C -1.500000 0.000000 0.000000 0 M V30 19 C 3.799038 0.750000 0.000000 0 M V30 20 R 2.500000 0.000000 0.000000 0 VAL=1 M V30 21 C 6.098076 0.750000 0.000000 0 M V30 22 R 4.799038 0.000000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 3 4 M V30 4 2 4 5 M V30 5 1 5 6 M V30 6 2 6 7 M V30 7 1 7 8 M V30 8 2 8 9 M V30 9 1 9 10 M V30 10 2 10 11 M V30 11 1 11 12 M V30 12 1 11 13 M V30 13 2 13 14 M V30 14 1 5 15 M V30 15 2 15 16 M V30 16 1 16 17 M V30 17 2 17 18 M V30 18 1 19 20 ENDPTS=(6 5 15 17 18 16 4) ATTACH=ANY M V30 19 1 21 22 ENDPTS=(6 17 18 16 4 5 15) ATTACH=ANY M V30 20 1 7 2 M V30 21 1 14 8 M V30 22 1 18 4 M V30 END BOND M V30 END CTAB M END
*C.*C.*C1=NN=C(C2=CC3=C(C=CC=N3)C=C2O)C=C1 |$Rd;;Rc;;B;;;;;;;;;;;;;;;;;$,m:1:11.16.14.13.15.12,m:3:14.13.15.12.11.16|
*C.*C.*C1=NN=C(C2=CC3=C(C=CC=N3)C=C2O)C=C1 |$Rd;;Rc;;B;;;;;;;;;;;;;;;;;$,m:1:11.16.14.13.15.12,m:3:14.13.15.12.11.16|
<r>Rd</r>C.<r>Rc</r>C.<r>B</r>C1=NN=C(C2=CC3=C(C=CC=N3)C=C2O)C=C1|m:1:11.12.13.14.15.16,m:3:11.12.13.14.15.16
null
[ { "bbox": [ 0.349609375, 0.4189453125, 0.373046875, 0.439453125 ], "text": "Rd" }, { "bbox": [ 0.3701171875, 0.453125, 0.3916015625, 0.474609375 ], "text": "Rc" }, { "bbox": [ 0.4013671875, 0.3916015625, 0.416015625, 0.4072265625 ], "text": "N" }, { "bbox": [ 0.5, 0.4443359375, 0.5302734375, 0.4609375 ], "text": "O" }, { "bbox": [ 0.525390625, 0.40625, 0.5390625, 0.419921875 ], "text": "N" }, { "bbox": [ 0.5517578125, 0.390625, 0.564453125, 0.4072265625 ], "text": "N" }, { "bbox": [ 0.5751953125, 0.349609375, 0.5869140625, 0.365234375 ], "text": "B" }, { "bbox": [ 0.0439453125, 0.5361328125, 0.107421875, 0.548828125 ], "text": "wherein" }, { "bbox": [ 0.0439453125, 0.55859375, 0.9521484375, 0.5771484375 ], "text": "Rc and Rd are each, independently, selected from hydrogen, cyano, halogen, hydroxy, C1-C4alkyl, C2-C4alkenyl," }, { "bbox": [ 0.04296875, 0.5791015625, 0.955078125, 0.6005859375 ], "text": "C2-C4alkynyl, C1-C4alkoxy, C3-C7cycloalkyl, heterocyclyl, heteroaryl, heterocyclyl C1-C4alkyl, C1-C4alkyl aryl," }, { "bbox": [ 0.0439453125, 0.60546875, 0.9560546875, 0.625 ], "text": "C1-C4alkyl heterocyclyl, C1-C4alkyl heteroaryl, C1-C4alkoxy aryl, C1-C4alkoxy heterocyclyl, C1-C4alkoxy heteroaryl," }, { "bbox": [ 0.04296875, 0.6298828125, 0.7978515625, 0.6474609375 ], "text": "C1-C4alkoxy substituted with hydroxy, C1-C4alkoxy, amino and mono-and di-C1-C4alkylamino." } ]
18
EP14750931NWB1_99_2.png
<markush><cxsmi><r>Rd</r>C.<r>Rc</r>C.<r>B</r>C1=NN=C(C2=CC3=C(C=CN=C3)C=C2O)C=C1|m:1:11.12.13.14.15.16,m:3:11.12.13.14.15.16</cxsmi><stable>Rc:hydrogen<n>cyano<n>halogen<n>hydroxy<n>C1-C4alkyl<n>C2-C4alkenyl<n>C2-C4alkynyl<n>C1-C4alkoxy<n>C3-C7cycloalkyl<n>heterocyclyl<n>heteroaryl<n>heterocyclyl C1-C4alkyl<n>C1-C4alkyl aryl<n>C1-C4alkyl heterocyclyl<n>C1-C4alkyl heteroaryl<n>C1-C4alkoxy aryl<n>C1-C4alkoxy heterocyclyl<n>C1-C4alkoxy heteroaryl<n>C1-C4alkoxy substituted with hydroxy C1-C4alkoxy amino and mono-and di-C1-C4alkylamino<ns>Rd:hydrogen<n>cyano<n>halogen<n>hydroxy<n>C1-C4alkyl<n>C2-C4alkenyl<n>C2-C4alkynyl<n>C1-C4alkoxy<n>C3-C7cycloalkyl<n>heterocyclyl<n>heteroaryl<n>heterocyclyl C1-C4alkyl<n>C1-C4alkyl aryl<n>C1-C4alkyl heterocyclyl<n>C1-C4alkyl heteroaryl<n>C1-C4alkoxy aryl<n>C1-C4alkoxy heterocyclyl<n>C1-C4alkoxy heteroaryl<n>C1-C4alkoxy substituted with hydroxy C1-C4alkoxy amino and mono-and di-C1-C4alkylamino</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 22 22 0 0 0 M V30 BEGIN ATOM M V30 1 O 0.750000 -3.897114 0.000000 0 M V30 2 C 0.488429 -0.681071 0.000000 0 M V30 3 C 0.844211 -0.729312 0.000000 0 M V30 4 C -0.000000 -0.000000 0.000000 0 M V30 5 C 0.750000 -1.299038 0.000000 0 M V30 6 C 1.500000 0.000000 0.000000 0 M V30 7 N 0.750000 1.299038 0.000000 0 M V30 8 C -0.750000 1.299038 0.000000 0 M V30 9 C -1.500000 0.000000 0.000000 0 M V30 10 C 0.514535 -1.005668 0.000000 0 M V30 11 C 1.441926 -1.446927 0.000000 0 M V30 12 C -0.000000 -0.000000 0.000000 0 M V30 13 N -1.500000 0.000000 0.000000 0 M V30 14 N -0.750000 1.299038 0.000000 0 M V30 15 C -1.500000 2.598076 0.000000 0 M V30 16 R -2.250000 3.897114 0.000000 0 VAL=1 M V30 17 C 0.000000 2.598076 0.000000 0 M V30 18 C 0.750000 1.299038 0.000000 0 M V30 19 C 3.799038 0.750000 0.000000 0 M V30 20 R 2.500000 0.000000 0.000000 0 VAL=1 M V30 21 C 6.098076 0.750000 0.000000 0 M V30 22 R 4.799038 0.000000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 3 4 M V30 4 2 4 5 M V30 5 1 5 6 M V30 6 2 6 7 M V30 7 1 7 8 M V30 8 2 8 9 M V30 9 1 5 10 M V30 10 2 10 11 M V30 11 1 11 12 M V30 12 2 12 13 M V30 13 1 13 14 M V30 14 2 14 15 M V30 15 1 15 16 M V30 16 1 15 17 M V30 17 2 17 18 M V30 18 1 19 20 ENDPTS=(6 5 6 8 9 4 7) ATTACH=ANY M V30 19 1 21 22 ENDPTS=(6 8 9 4 7 5 6) ATTACH=ANY M V30 20 1 11 2 M V30 21 1 18 12 M V30 22 1 9 4 M V30 END BOND M V30 END CTAB M END
*C.*C.*C1=NN=C(C2=CC3=C(C=CN=C3)C=C2O)C=C1 |$Rd;;Rc;;B;;;;;;;;;;;;;;;;;$,m:1:11.16.14.13.12.15,m:3:14.13.12.15.11.16|
*C.*C.*C1=NN=C(C2=CC3=C(C=CN=C3)C=C2O)C=C1 |$Rd;;Rc;;B;;;;;;;;;;;;;;;;;$,m:1:11.16.14.13.12.15,m:3:14.13.12.15.11.16|
<r>Rd</r>C.<r>Rc</r>C.<r>B</r>C1=NN=C(C2=CC3=C(C=CN=C3)C=C2O)C=C1|m:1:11.12.13.14.15.16,m:3:11.12.13.14.15.16
null
[ { "bbox": [ 0.373046875, 0.3798828125, 0.3916015625, 0.3974609375 ], "text": "Rd" }, { "bbox": [ 0.3701171875, 0.4072265625, 0.380859375, 0.4208984375 ], "text": "N" }, { "bbox": [ 0.359375, 0.453125, 0.3798828125, 0.474609375 ], "text": "Rc" }, { "bbox": [ 0.490234375, 0.4482421875, 0.5185546875, 0.462890625 ], "text": "O" }, { "bbox": [ 0.517578125, 0.4072265625, 0.5283203125, 0.419921875 ], "text": "N" }, { "bbox": [ 0.5390625, 0.390625, 0.552734375, 0.4072265625 ], "text": "N" }, { "bbox": [ 0.564453125, 0.349609375, 0.57421875, 0.3662109375 ], "text": "B" }, { "bbox": [ 0.0439453125, 0.5341796875, 0.107421875, 0.5498046875 ], "text": "wherein" }, { "bbox": [ 0.0439453125, 0.5595703125, 0.955078125, 0.5771484375 ], "text": "Rc and Rd are each, independently, selected from hydrogen, cyano, halogen, hydroxy, C1-C4alkyl, C2-C4alkenyl," }, { "bbox": [ 0.0439453125, 0.5810546875, 0.953125, 0.599609375 ], "text": "C2-C4alkynyl, C1-C4alkoxy, C3-C7cycloalkyl, heterocyclyl, heteroaryl, heterocyclyl C1-C4alkyl, C1-C4alkyl aryl," }, { "bbox": [ 0.0439453125, 0.6064453125, 0.9560546875, 0.6240234375 ], "text": "C1-C4alkyl heterocyclyl, C1-C4alkyl heteroaryl, C1-C4alkoxy aryl, C1-C4alkoxy heterocyclyl, C1-C4alkoxy heteroaryl," }, { "bbox": [ 0.0439453125, 0.6298828125, 0.7939453125, 0.6474609375 ], "text": "C1-C4alkoxy substituted with hydroxy, C1-C4alkoxy, amino and mono-and di-C1-C4alkylamino." } ]
19
EP14750931NWB1_100.png
<markush><cxsmi><r>Rd</r>C.<r>Rc</r>C.<r>B</r>C1=NN=C(C2=CC3=C(C=C2O)N=CC=N3)C=C1|m:1:11.12.16.17.18.19,m:3:11.12.16.17.18.19</cxsmi><stable>Rc:hydrogen<n>cyano<n>halogen<n>hydroxy<n>C1-C4alkyl<n>C2-C4alkenyl<n>C2-C4alkynyl<n>C1-C4alkoxy<n>C3-C7cycloalkyl<n>heterocyclyl<n>heteroaryl<n>heterocyclyl C1-C4alkyl<n>C1-C4alkyl aryl<n>C1-C4alkyl heterocyclyl<n>C1-C4alkyl heteroaryl<n>C1-C4alkoxy aryl<n>C1-C4alkoxy heterocyclyl<n>C1-C4alkoxy heteroaryl<n>C1-C4alkoxy substituted with hydroxy C1-C4alkoxy amino and mono-and di-C1-C4alkylamino<ns>Rd:hydrogen<n>cyano<n>halogen<n>hydroxy<n>C1-C4alkyl<n>C2-C4alkenyl<n>C2-C4alkynyl<n>C1-C4alkoxy<n>C3-C7cycloalkyl<n>heterocyclyl<n>heteroaryl<n>heterocyclyl C1-C4alkyl<n>C1-C4alkyl aryl<n>C1-C4alkyl heterocyclyl<n>C1-C4alkyl heteroaryl<n>C1-C4alkoxy aryl<n>C1-C4alkoxy heterocyclyl<n>C1-C4alkoxy heteroaryl<n>C1-C4alkoxy substituted with hydroxy C1-C4alkoxy amino and mono-and di-C1-C4alkylamino</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 22 22 0 0 0 M V30 BEGIN ATOM M V30 1 O 0.750000 -3.897114 0.000000 0 M V30 2 C 0.488429 -0.681071 0.000000 0 M V30 3 C 0.844211 -0.729312 0.000000 0 M V30 4 C -0.000000 -0.000000 0.000000 0 M V30 5 C 0.750000 -1.299038 0.000000 0 M V30 6 C 0.514535 -1.005668 0.000000 0 M V30 7 C 1.441926 -1.446927 0.000000 0 M V30 8 C -0.000000 -0.000000 0.000000 0 M V30 9 N -1.500000 0.000000 0.000000 0 M V30 10 N -0.750000 1.299038 0.000000 0 M V30 11 C -1.500000 2.598076 0.000000 0 M V30 12 R -2.250000 3.897114 0.000000 0 VAL=1 M V30 13 C 0.000000 2.598076 0.000000 0 M V30 14 C 0.750000 1.299038 0.000000 0 M V30 15 N 1.500000 0.000000 0.000000 0 M V30 16 C 0.750000 1.299038 0.000000 0 M V30 17 C -0.750000 1.299038 0.000000 0 M V30 18 N -1.500000 0.000000 0.000000 0 M V30 19 C 3.799038 0.750000 0.000000 0 M V30 20 R 2.500000 0.000000 0.000000 0 VAL=1 M V30 21 C 6.098076 0.750000 0.000000 0 M V30 22 R 4.799038 0.000000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 3 4 M V30 4 2 4 5 M V30 5 1 5 6 M V30 6 2 6 7 M V30 7 1 7 8 M V30 8 2 8 9 M V30 9 1 9 10 M V30 10 2 10 11 M V30 11 1 11 12 M V30 12 1 11 13 M V30 13 2 13 14 M V30 14 1 5 15 M V30 15 2 15 16 M V30 16 1 16 17 M V30 17 2 17 18 M V30 18 1 19 20 ENDPTS=(6 5 15 17 4 18 16) ATTACH=ANY M V30 19 1 21 22 ENDPTS=(6 17 4 18 16 5 15) ATTACH=ANY M V30 20 1 7 2 M V30 21 1 14 8 M V30 22 1 18 4 M V30 END BOND M V30 END CTAB M END
*C.*C.*C1=NN=C(C2=CC3=C(C=C2O)N=CC=N3)C=C1 |$Rd;;Rc;;B;;;;;;;;;;;;;;;;;$,m:1:11.19.17.12.16.18,m:3:17.12.16.18.11.19|
*C.*C.*C1=NN=C(C2=CC3=C(C=C2O)N=CC=N3)C=C1 |$Rd;;Rc;;B;;;;;;;;;;;;;;;;;$,m:1:11.19.17.12.16.18,m:3:17.12.16.18.11.19|
<r>Rd</r>C.<r>Rc</r>C.<r>B</r>C1=NN=C(C2=CC3=C(C=C2O)N=CC=N3)C=C1|m:1:11.12.16.17.18.19,m:3:11.12.16.17.18.19
null
[ { "bbox": [ 0.353515625, 0.388671875, 0.3779296875, 0.40234375 ], "text": "Rd" }, { "bbox": [ 0.3896484375, 0.3935546875, 0.40234375, 0.4091796875 ], "text": "N" }, { "bbox": [ 0.353515625, 0.4560546875, 0.3759765625, 0.46875 ], "text": "Rc" }, { "bbox": [ 0.3896484375, 0.447265625, 0.4013671875, 0.46484375 ], "text": "N" }, { "bbox": [ 0.4853515625, 0.4482421875, 0.513671875, 0.4638671875 ], "text": "O" }, { "bbox": [ 0.5126953125, 0.408203125, 0.5244140625, 0.421875 ], "text": "N" }, { "bbox": [ 0.5341796875, 0.3935546875, 0.5478515625, 0.40625 ], "text": "N" }, { "bbox": [ 0.5595703125, 0.349609375, 0.5693359375, 0.3662109375 ], "text": "B" }, { "bbox": [ 0.0439453125, 0.533203125, 0.1064453125, 0.548828125 ], "text": "wherein" }, { "bbox": [ 0.0439453125, 0.556640625, 0.955078125, 0.5751953125 ], "text": "Rc and Rd are each, independently, selected from hydrogen, cyano, halogen, hydroxy, C1-C4alkyl, C2-C4alkenyl," }, { "bbox": [ 0.0439453125, 0.580078125, 0.9541015625, 0.599609375 ], "text": "C2-C4alkynyl, C1-C4alkoxy, C3-C7cycloalkyl, heterocyclyl, heteroaryl, heterocyclyl C1-C4alkyl, C1-C4alkyl aryl," }, { "bbox": [ 0.0439453125, 0.60546875, 0.955078125, 0.6201171875 ], "text": "C1-C4alkyl heterocyclyl, C1-C4alkyl heteroaryl, C1-C4alkoxy aryl, C1-C4alkoxy heterocyclyl, C1-C4alkoxy heteroaryl," }, { "bbox": [ 0.0439453125, 0.6298828125, 0.7958984375, 0.646484375 ], "text": "C1-C4alkoxy substituted with hydroxy, C1-C4alkoxy, amino and mono-and di-C1-C4alkylamino." } ]
20
US6239192_9.png
<markush><cxsmi><r>R3</r>C.<r>R4</r>C.<r>R2</r>C1=CC=CC(<r>R1</r>)=C1C(=O)NC(=O)NC1=CC=CC=C1|m:1:18.19.20.21.22.23,m:3:18.19.20.21.22.23</cxsmi><stable>R1:halogen<ns>R2:hydrogen<n>halogen<ns>R3:hydrogen<n>halogen<n>C1-4-alkyl<ns>R4:halogen<n>1-5-halogeno-C1-4-alkyl<n>C1-4-alkoxy<n>1-5-halogeno-C1-4-alkoxy<n>C1-4-alkylthio<n>1-5-halogeno-C1-4-alkylthio<n>phenoxy<n>pyridyloxy</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 24 23 0 0 0 M V30 BEGIN ATOM M V30 1 C 5.299038 0.750000 0.000000 0 M V30 2 R 4.000000 0.000000 0.000000 0 VAL=1 M V30 3 C 7.598076 0.750000 0.000000 0 M V30 4 R 6.299038 0.000000 0.000000 0 VAL=1 M V30 5 R 3.000000 0.000000 0.000000 0 VAL=1 M V30 6 C 1.500000 0.000000 0.000000 0 M V30 7 C -0.000000 0.000000 0.000000 0 M V30 8 C -0.750000 1.299038 0.000000 0 M V30 9 O -2.250000 1.299038 0.000000 0 M V30 10 N -0.000000 2.598076 0.000000 0 M V30 11 C -0.750000 3.897114 0.000000 0 M V30 12 O -2.250000 3.897114 0.000000 0 M V30 13 N 0.000000 5.196152 0.000000 0 M V30 14 C -0.750000 6.495191 0.000000 0 M V30 15 C 0.000000 7.794229 0.000000 0 M V30 16 C -0.750000 9.093267 0.000000 0 M V30 17 C -2.250000 9.093267 0.000000 0 M V30 18 C -3.000000 7.794229 0.000000 0 M V30 19 C -2.250000 6.495191 0.000000 0 M V30 20 C -0.750000 -1.299038 0.000000 0 M V30 21 R -0.000000 -2.598076 0.000000 0 VAL=1 M V30 22 C -1.500000 0.000000 0.000000 0 M V30 23 C -0.750000 1.299038 0.000000 0 M V30 24 C 0.750000 1.299038 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 ENDPTS=(6 15 16 14 17 19 18) ATTACH=ANY M V30 2 1 3 4 ENDPTS=(6 14 17 19 18 15 16) ATTACH=ANY M V30 3 1 5 6 M V30 4 2 6 7 M V30 5 1 7 8 M V30 6 2 8 9 M V30 7 1 8 10 M V30 8 1 10 11 M V30 9 2 11 12 M V30 10 1 11 13 M V30 11 1 13 14 M V30 12 2 14 15 M V30 13 1 15 16 M V30 14 2 16 17 M V30 15 1 17 18 M V30 16 2 18 19 M V30 17 1 7 20 M V30 18 1 20 21 M V30 19 2 20 22 M V30 20 1 22 23 M V30 21 2 23 24 M V30 22 1 24 6 M V30 23 1 19 14 M V30 END BOND M V30 END CTAB M END
*C.*C.*C1=CC=CC(*)=C1C(=O)NC(=O)NC1=CC=CC=C1 |$R3;;R4;;R2;;;;;;R1;;;;;;;;;;;;;$,m:1:19.20.18.21.23.22,m:3:18.21.23.22.19.20|
*C.*C.*C1=CC=CC(*)=C1C(=O)NC(=O)NC1=CC=CC=C1 |$R3;;R4;;R2;;;;;;R1;;;;;;;;;;;;;$,m:1:19.20.18.21.23.22,m:3:18.21.23.22.19.20|
<r>R3</r>C.<r>R4</r>C.<r>R2</r>C1=CC=CC(<r>R1</r>)=C1C(=O)NC(=O)NC1=CC=CC=C1|m:1:18.19.20.21.22.23,m:3:18.19.20.21.22.23
null
[ { "bbox": [ 0.26953125, 0.0439453125, 0.296875, 0.068359375 ], "text": "R1" }, { "bbox": [ 0.26953125, 0.2646484375, 0.2998046875, 0.2939453125 ], "text": "R2" }, { "bbox": [ 0.3330078125, 0.1591796875, 0.3720703125, 0.1796875 ], "text": "CO" }, { "bbox": [ 0.419921875, 0.1591796875, 0.458984375, 0.1826171875 ], "text": "N" }, { "bbox": [ 0.501953125, 0.15625, 0.583984375, 0.1796875 ], "text": "CONH" }, { "bbox": [ 0.775390625, 0.10546875, 0.806640625, 0.1328125 ], "text": "R3" }, { "bbox": [ 0.7734375, 0.2060546875, 0.8076171875, 0.2294921875 ], "text": "R4" }, { "bbox": [ 0.0654296875, 0.4306640625, 0.177734375, 0.4638671875 ], "text": "wherein" }, { "bbox": [ 0.0654296875, 0.5390625, 0.3984375, 0.576171875 ], "text": "R1 represents halogen," }, { "bbox": [ 0.06640625, 0.591796875, 0.5869140625, 0.62890625 ], "text": "R2 represents hydrogen or halogen," }, { "bbox": [ 0.0654296875, 0.64453125, 0.7548828125, 0.6796875 ], "text": "R3 represents hydrogen, halogen or C1-4-alkyl," }, { "bbox": [ 0.0654296875, 0.697265625, 0.9326171875, 0.7373046875 ], "text": "R4 represents halogen, 1-5-halogeno-C1-4-alkyl, C1-4-" }, { "bbox": [ 0.099609375, 0.7431640625, 0.9306640625, 0.775390625 ], "text": "alkoxy, 1-5-halogeno-C1-4-alkoxy, C1-4-alkylthio, 1-5-" }, { "bbox": [ 0.1015625, 0.78515625, 0.9306640625, 0.8203125 ], "text": "halogeno-C1-4-alkylthio, phenoxy or pyridyloxy, which" }, { "bbox": [ 0.099609375, 0.8310546875, 0.9296875, 0.8671875 ], "text": "can optionally be substituted by halogeno, C1-4-alkyl," }, { "bbox": [ 0.1015625, 0.8779296875, 0.9326171875, 0.9091796875 ], "text": "1-5-halogeno-C1-4-alkyl, C1-4-alkoxy, 1-5-halogeno-C1-4-" }, { "bbox": [ 0.099609375, 0.91796875, 0.853515625, 0.955078125 ], "text": "alkoxy, C1-4-alkylthio, 1-5-halogeno-C1-4-alkylthio." } ]
21
US6495573_10.png
<markush><cxsmi><r>R4</r>C.<r>R5</r>C.<r>R1</r>C(<r>R2</r>)=CC1C(C(=O)OC(<r>R3</r>)C2=CC=CC(OC3=CC=CC=C3)=C2)C1(C)C|m:1:15.16.17.18.19.27,m:3:21.22.23.24.25.26</cxsmi><stable>R1:hydrogen<n>halogen<n>halogen-substituted alkyl<n>halogen-substituted phenyl<ns>R2:hydrogen<n>halogen<n>halogen-substituted alkyl<n>halogen-substituted phenyl<ns>R3:hydrogen<n>CN<ns>R4:hydrogen<n>halogen<ns>R5:hydrogen<n>halogen</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 31 31 0 0 0 M V30 BEGIN ATOM M V30 1 C 8.026250 -4.907587 0.000000 0 M V30 2 C 6.549038 -4.647114 0.000000 0 M V30 3 C 6.036008 -6.056653 0.000000 0 M V30 4 C 6.549038 -3.147114 0.000000 0 M V30 5 C 7.299038 -1.848076 0.000000 0 M V30 6 C 6.549038 -0.549038 0.000000 0 M V30 7 R 7.299038 0.750000 0.000000 0 VAL=1 M V30 8 R 5.049038 -0.549038 0.000000 0 VAL=1 M V30 9 C 5.250000 -3.897114 0.000000 0 M V30 10 C 3.750000 -3.897114 0.000000 0 M V30 11 O 3.000000 -5.196152 0.000000 0 M V30 12 O 3.000000 -2.598076 0.000000 0 M V30 13 C 1.500000 -2.598076 0.000000 0 M V30 14 R 0.750000 -3.897114 0.000000 0 VAL=1 M V30 15 C 0.750000 -1.299038 0.000000 0 M V30 16 C 1.500000 0.000000 0.000000 0 M V30 17 C 0.750000 1.299038 0.000000 0 M V30 18 C -0.750000 1.299038 0.000000 0 M V30 19 C -1.500000 0.000000 0.000000 0 M V30 20 O -3.000000 0.000000 0.000000 0 M V30 21 C -3.750000 1.299038 0.000000 0 M V30 22 C -3.000000 2.598076 0.000000 0 M V30 23 C -3.750000 3.897114 0.000000 0 M V30 24 C -5.250000 3.897114 0.000000 0 M V30 25 C -6.000000 2.598076 0.000000 0 M V30 26 C -5.250000 1.299038 0.000000 0 M V30 27 C -0.750000 -1.299038 0.000000 0 M V30 28 C 1.299038 5.647114 0.000000 0 M V30 29 R 0.000000 4.897114 0.000000 0 VAL=1 M V30 30 C 1.299038 7.397114 0.000000 0 M V30 31 R 0.000000 6.647114 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 4 1 4 5 M V30 5 2 5 6 M V30 6 1 6 7 M V30 7 1 6 8 M V30 8 1 4 9 M V30 9 1 9 10 M V30 10 2 10 11 M V30 11 1 10 12 M V30 12 1 12 13 M V30 13 1 13 14 M V30 14 1 13 15 M V30 15 2 15 16 M V30 16 1 16 17 M V30 17 2 17 18 M V30 18 1 18 19 M V30 19 1 19 20 M V30 20 1 20 21 M V30 21 2 21 22 M V30 22 1 22 23 M V30 23 2 23 24 M V30 24 1 24 25 M V30 25 2 25 26 M V30 26 2 19 27 M V30 27 1 28 29 ENDPTS=(6 15 16 17 27 18 19) ATTACH=ANY M V30 28 1 30 31 ENDPTS=(6 22 21 23 24 25 26) ATTACH=ANY M V30 29 1 9 2 M V30 30 1 27 15 M V30 31 1 26 21 M V30 END BOND M V30 END CTAB M END
*C.*C.*C(*)=CC1C(C(=O)OC(*)C2=CC=CC(OC3=CC=CC=C3)=C2)C1(C)C |$R4;;R5;;R1;;R2;;;;;;;;R3;;;;;;;;;;;;;;;;$,m:1:15.16.17.27.18.19,m:3:22.21.23.24.25.26|
*C.*C.*C(*)=CC1C(C(=O)OC(*)C2=CC=CC(OC3=CC=CC=C3)=C2)C1(C)C |$R4;;R5;;R1;;R2;;;;;;;;R3;;;;;;;;;;;;;;;;$,m:1:15.16.17.27.18.19,m:3:22.21.23.24.25.26|
<r>R4</r>C.<r>R5</r>C.<r>R1</r>C(<r>R2</r>)=CC1C(C(=O)OC(<r>R3</r>)C2=CC=CC(OC3=CC=CC=C3)=C2)C1(C)C|m:1:15.16.17.18.19.27,m:3:21.22.23.24.25.26
null
[ { "bbox": [ 0.099609375, 0.28125, 0.1279296875, 0.3076171875 ], "text": "R1" }, { "bbox": [ 0.0966796875, 0.396484375, 0.1318359375, 0.4267578125 ], "text": "R2" }, { "bbox": [ 0.3359375, 0.345703125, 0.3935546875, 0.3662109375 ], "text": "COO" }, { "bbox": [ 0.4443359375, 0.26953125, 0.4775390625, 0.2998046875 ], "text": "R2" }, { "bbox": [ 0.693359375, 0.2509765625, 0.7138671875, 0.2744140625 ], "text": "O" }, { "bbox": [ 0.6884765625, 0.388671875, 0.7158203125, 0.4169921875 ], "text": "R4" }, { "bbox": [ 0.873046875, 0.3857421875, 0.9013671875, 0.4169921875 ], "text": "R5" }, { "bbox": [ 0.0439453125, 0.5029296875, 0.1787109375, 0.5361328125 ], "text": "in which" }, { "bbox": [ 0.0791015625, 0.5458984375, 0.9521484375, 0.5869140625 ], "text": "R1 and R2 represent halogen, optionally halogen-" }, { "bbox": [ 0.1142578125, 0.5966796875, 0.9521484375, 0.626953125 ], "text": "substituted alkyl or optionally halogen-substituted" }, { "bbox": [ 0.1171875, 0.6376953125, 0.2294921875, 0.6728515625 ], "text": "phenyl," }, { "bbox": [ 0.0810546875, 0.677734375, 0.548828125, 0.71875 ], "text": "R3 represent hydrogen or CN," }, { "bbox": [ 0.0791015625, 0.728515625, 0.685546875, 0.76953125 ], "text": "R4 represents hydrogen or halogen and" }, { "bbox": [ 0.0791015625, 0.77734375, 0.6279296875, 0.814453125 ], "text": "R5 represents hydrogen or halogen." } ]
22
US6538013_36_c.png
<markush><cxsmi><r>Y</r>/<r>X</r>=C(\N(<r>R1</r>)<r>T</r>)N(<r>U</r>)C(=O)OC(<r>R2</r>)(<r>R2'</r>)OC(<r>R</r>)=O</cxsmi><stable>R1:pyridyl-substituted C1-C6alkyl<ns>X:CH<ns>Y:NO2<ns>T:hydrogen<n>C1-C6alkyl<ns>U:hydrogen<n>C1-C6alkyl<ns>R2:hydrogen<n>C1-C6alkyl<ns>R2':hydrogen<n>C1-C6alkyl<ns>R:C1-C20alkyl</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 18 17 0 0 0 M V30 BEGIN ATOM M V30 1 R -0.750000 -1.299038 0.000000 0 VAL=1 M V30 2 R 0.000000 0.000000 0.000000 0 VAL=3 M V30 3 C 1.500000 0.000000 0.000000 0 M V30 4 N 2.250000 -1.299038 0.000000 0 M V30 5 R 3.750000 -1.299038 0.000000 0 VAL=1 M V30 6 R 1.500000 -2.598076 0.000000 0 VAL=1 M V30 7 N 2.250000 1.299038 0.000000 0 M V30 8 R 3.750000 1.299038 0.000000 0 VAL=1 M V30 9 C 1.500000 2.598076 0.000000 0 M V30 10 O -0.000000 2.598076 0.000000 0 M V30 11 O 2.250000 3.897114 0.000000 0 M V30 12 C 1.500000 5.196152 0.000000 0 M V30 13 R 2.799038 5.946152 0.000000 0 VAL=1 M V30 14 R 0.200962 4.446152 0.000000 0 VAL=1 M V30 15 O 0.750000 6.495191 0.000000 0 M V30 16 C -0.750000 6.495191 0.000000 0 M V30 17 R -1.500000 7.794229 0.000000 0 VAL=1 M V30 18 O -1.500000 5.196152 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 3 4 M V30 4 1 4 5 M V30 5 1 4 6 M V30 6 1 3 7 M V30 7 1 7 8 M V30 8 1 7 9 M V30 9 2 9 10 M V30 10 1 9 11 M V30 11 1 11 12 M V30 12 1 12 13 M V30 13 1 12 14 M V30 14 1 12 15 M V30 15 1 15 16 M V30 16 1 16 17 M V30 17 2 16 18 M V30 END BOND M V30 END CTAB M END
*/*=C(\N(*)*)N(*)C(=O)OC(*)(*)OC(*)=O |$Y;X;;;R1;T;;U;;;;;R2;R2';;;R;$,|
*/*=C(\N(*)*)N(*)C(=O)OC(*)(*)OC(*)=O |$Y;X;;;R1;T;;U;;;;;R2;R2';;;R;$,|
<r>Y</r>/<r>X</r>=C(\N(<r>R1</r>)<r>T</r>)N(<r>U</r>)C(=O)OC(<r>R2</r>)(<r>R2'</r>)OC(<r>R</r>)=O
null
[ { "bbox": [ 0.2529296875, 0.125, 0.27734375, 0.1474609375 ], "text": "R1" }, { "bbox": [ 0.310546875, 0.15234375, 0.3291015625, 0.173828125 ], "text": "N" }, { "bbox": [ 0.3134765625, 0.20703125, 0.3291015625, 0.2275390625 ], "text": "T" }, { "bbox": [ 0.353515625, 0.068359375, 0.37890625, 0.087890625 ], "text": "X" }, { "bbox": [ 0.3125, 0.041015625, 0.3291015625, 0.0595703125 ], "text": "Y" }, { "bbox": [ 0.40625, 0.1494140625, 0.4267578125, 0.169921875 ], "text": "N" }, { "bbox": [ 0.4091796875, 0.2060546875, 0.4267578125, 0.2265625 ], "text": "U" }, { "bbox": [ 0.4560546875, 0.068359375, 0.474609375, 0.08984375 ], "text": "O" }, { "bbox": [ 0.505859375, 0.1533203125, 0.5224609375, 0.169921875 ], "text": "O" }, { "bbox": [ 0.52734375, 0.076171875, 0.5498046875, 0.099609375 ], "text": "R2" }, { "bbox": [ 0.58203125, 0.0732421875, 0.6123046875, 0.0986328125 ], "text": "R2'" }, { "bbox": [ 0.6005859375, 0.150390625, 0.619140625, 0.1708984375 ], "text": "O" }, { "bbox": [ 0.650390625, 0.0693359375, 0.66796875, 0.087890625 ], "text": "O" }, { "bbox": [ 0.69921875, 0.15234375, 0.71484375, 0.1708984375 ], "text": "R" }, { "bbox": [ 0.1220703125, 0.3935546875, 0.2255859375, 0.419921875 ], "text": "wherein" }, { "bbox": [ 0.154296875, 0.4365234375, 0.875, 0.46484375 ], "text": "R1 pyridyl-substituted C1-C6alkyl, wherein the pyridyl" }, { "bbox": [ 0.1845703125, 0.47265625, 0.875, 0.5 ], "text": "moiety is unsubstituted or mono- or poly-substituted by" }, { "bbox": [ 0.1865234375, 0.5048828125, 0.6494140625, 0.533203125 ], "text": "identical or different halogen atoms;" }, { "bbox": [ 0.123046875, 0.5390625, 0.2373046875, 0.5693359375 ], "text": "X is CH;" }, { "bbox": [ 0.1220703125, 0.578125, 0.25, 0.60546875 ], "text": "Y is NO2;" }, { "bbox": [ 0.1220703125, 0.615234375, 0.5, 0.64453125 ], "text": "T is hydrogen or C1-C6alkyl;" }, { "bbox": [ 0.123046875, 0.6552734375, 0.505859375, 0.6845703125 ], "text": "U is hydrogen or C1-C6alkyl;" }, { "bbox": [ 0.123046875, 0.6923828125, 0.513671875, 0.7255859375 ], "text": "R2 is hydrogen or C1-C6alkyl;" }, { "bbox": [ 0.123046875, 0.7314453125, 0.5673828125, 0.7626953125 ], "text": "R2'is hydrogen or C1-C6alkyl; and" }, { "bbox": [ 0.1220703125, 0.7705078125, 0.875, 0.7998046875 ], "text": "R is C1-C20alkyl, being unsubstituted or substituted by one" }, { "bbox": [ 0.154296875, 0.8095703125, 0.875, 0.8349609375 ], "text": "or more identical or different substituents, the said sub-" }, { "bbox": [ 0.154296875, 0.845703125, 0.8759765625, 0.876953125 ], "text": "stituents being selected from the group halogen, cyano," }, { "bbox": [ 0.154296875, 0.884765625, 0.8759765625, 0.9140625 ], "text": "nitro, hydroxy, C1-C6alkoxy, C1C6alkylthio," }, { "bbox": [ 0.154296875, 0.923828125, 0.51171875, 0.951171875 ], "text": "C1-C6haloalkyl, and phenyl." } ]
23
US6995262_37_c.png
<markush><cxsmi><r>R</r><r>A</r>N<r>Y</r>CC|Sg:n:4:n:ht</cxsmi><stable>n:1-9<ns>Y:C=O<n>—SO2<ns>A:C=O<n>—SO2<ns>R:an optionally substituted alkyl or aryl radical</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 6 5 1 0 0 M V30 BEGIN ATOM M V30 1 C 6.495191 0.750000 0.000000 0 M V30 2 C 5.196152 -0.000000 0.000000 0 M V30 3 R 3.897114 0.750000 0.000000 0 VAL=2 M V30 4 N 2.598076 -0.000000 0.000000 0 M V30 5 R 1.299038 0.750000 0.000000 0 VAL=2 M V30 6 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 3 4 M V30 4 1 4 5 M V30 5 1 5 6 M V30 END BOND M V30 BEGIN SGROUP M V30 1 SRU 0 ATOMS=(1 2) XBONDS=(2 1 2) XBHEAD=(1 1) XBCORR=(2 1 2) - M V30 CONNECT=HT LABEL=n M V30 END SGROUP M V30 END CTAB M END
**N*CC |$R;A;;Y;;$,Sg:n:4:n:ht:::,|
**N*CC |$R;A;;Y;;$,Sg:n:4:n:ht:::,|
<r>R</r><r>A</r>N<r>Y</r>CC|Sg:n:4:n:ht
null
[ { "bbox": [ 0.443359375, 0.279296875, 0.4560546875, 0.2978515625 ], "text": "n" }, { "bbox": [ 0.4580078125, 0.318359375, 0.4775390625, 0.3427734375 ], "text": "Y" }, { "bbox": [ 0.517578125, 0.2607421875, 0.53515625, 0.30859375 ], "text": "N" }, { "bbox": [ 0.57421875, 0.3154296875, 0.5908203125, 0.33984375 ], "text": "A" }, { "bbox": [ 0.6328125, 0.2861328125, 0.650390625, 0.30859375 ], "text": "R" }, { "bbox": [ 0.044921875, 0.4111328125, 0.17578125, 0.4453125 ], "text": "in which" }, { "bbox": [ 0.08203125, 0.466796875, 0.6611328125, 0.5 ], "text": "n represents 1, 2, 3, 4, 5, 6, 7, 8 or 9" }, { "bbox": [ 0.08203125, 0.5166015625, 0.638671875, 0.5498046875 ], "text": "Y, A represent C=O or —SO2, and" }, { "bbox": [ 0.0791015625, 0.5634765625, 0.9521484375, 0.6005859375 ], "text": "R represents an optionally substituted alkyl or aryl" }, { "bbox": [ 0.12109375, 0.609375, 0.234375, 0.6396484375 ], "text": "radical," }, { "bbox": [ 0.0439453125, 0.6572265625, 0.9599609375, 0.689453125 ], "text": "and at least one substituent selected from the group consist-" }, { "bbox": [ 0.044921875, 0.701171875, 0.1376953125, 0.7333984375 ], "text": "ing of" } ]
24
US7847043B2_22.png
<markush><cxsmi><r>R1</r>[Bi](<r>R2</r>)C(<r>R3</r>)(<r>R4</r>)<r>R5</r></cxsmi><stable>R1:C1-C8 alkyl<n>aryl<n>substituted aryl<n>an aromatic heterocyclic group<ns>R2:C1-C8 alkyl<n>aryl<n>substituted aryl<n>an aromatic heterocyclic group<ns>R3:hydrogen atom<n>C1-C8 alkyl<ns>R4:hydrogen atom<n>C1-C8 alkyl<ns>R5:aryl<n>substituted aryl<n>an aromatic heterocyclic group<n>acyl<n>amido<n>oxycarbonyl<n>cyano</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 7 6 0 0 0 M V30 BEGIN ATOM M V30 1 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 2 Bi 1.299038 0.750000 0.000000 0 VAL=3 M V30 3 R 2.598076 -0.000000 0.000000 0 VAL=1 M V30 4 C 1.299038 2.250000 0.000000 0 M V30 5 R 2.799038 2.250000 0.000000 0 VAL=1 M V30 6 R -0.200962 2.250000 0.000000 0 VAL=1 M V30 7 R 1.299038 3.750000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 4 1 4 5 M V30 5 1 4 6 M V30 6 1 4 7 M V30 END BOND M V30 END CTAB M END
*[Bi](*)C(*)(*)* |$R1;;R2;;R3;R4;R5$,|
*[Bi](*)C(*)(*)* |$R1;;R2;;R3;R4;R5$,|
<r>R1</r>[Bi](<r>R2</r>)C(<r>R3</r>)(<r>R4</r>)<r>R5</r>
null
[ { "bbox": [ 0.349609375, 0.3330078125, 0.3798828125, 0.3642578125 ], "text": "R4" }, { "bbox": [ 0.4248046875, 0.263671875, 0.4541015625, 0.2900390625 ], "text": "R3" }, { "bbox": [ 0.423828125, 0.40234375, 0.4541015625, 0.431640625 ], "text": "R5" }, { "bbox": [ 0.4931640625, 0.3359375, 0.521484375, 0.3642578125 ], "text": "Bi" }, { "bbox": [ 0.5439453125, 0.2744140625, 0.57421875, 0.302734375 ], "text": "R1" }, { "bbox": [ 0.5439453125, 0.3935546875, 0.5771484375, 0.4248046875 ], "text": "R2" }, { "bbox": [ 0.044921875, 0.517578125, 0.9541015625, 0.5576171875 ], "text": "wherein R1 and R2 are C1-C8 alkyl, aryl, substituted aryl or" }, { "bbox": [ 0.0869140625, 0.5615234375, 0.95703125, 0.599609375 ], "text": "an aromatic heterocyclic group, R3 and R4 are each a" }, { "bbox": [ 0.0830078125, 0.6044921875, 0.9521484375, 0.646484375 ], "text": "hydrogen atom or C1-C8 alkyl, and R5 is aryl, substituted" }, { "bbox": [ 0.0830078125, 0.654296875, 0.9560546875, 0.6875 ], "text": "aryl, an aromatic heterocyclic group, acyl, amido, oxy-" }, { "bbox": [ 0.0830078125, 0.6953125, 0.376953125, 0.732421875 ], "text": "carbonyl or cyano." } ]
25
US7847043B2_22_2.png
<markush><cxsmi><r>Z</r>[Bi](<r>R1</r>)<r>R2</r></cxsmi><stable>R1:as defined above<ns>R2:as defined above<ns>Z:a halogen atom<n>alkali metal</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 4 3 0 0 0 M V30 BEGIN ATOM M V30 1 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 2 Bi 1.299038 0.750000 0.000000 0 VAL=3 M V30 3 R 2.598076 -0.000000 0.000000 0 VAL=1 M V30 4 R 1.299038 2.250000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 END BOND M V30 END CTAB M END
*[Bi](*)* |$Z;;R1;R2$,|
*[Bi](*)* |$Z;;R1;R2$,|
<r>Z</r>[Bi](<r>R1</r>)<r>R2</r>
null
[ { "bbox": [ 0.3837890625, 0.4052734375, 0.4072265625, 0.43359375 ], "text": "Z" }, { "bbox": [ 0.4560546875, 0.4072265625, 0.4814453125, 0.4296875 ], "text": "Bi" }, { "bbox": [ 0.5029296875, 0.33984375, 0.53515625, 0.369140625 ], "text": "R1" }, { "bbox": [ 0.5029296875, 0.4599609375, 0.53515625, 0.4912109375 ], "text": "R2" }, { "bbox": [ 0.0419921875, 0.572265625, 0.9521484375, 0.6103515625 ], "text": "(wherein R1 and R2 are as defined above, and Z is a halogen" }, { "bbox": [ 0.0830078125, 0.623046875, 0.41015625, 0.65625 ], "text": "atom or alkali metal)" } ]
26
US8076430B2_12_c.png
<markush><cxsmi><r>R1</r>[Bi](<r>R2</r>)<r>R3</r></cxsmi><stable>R1:a C1-C8 alkyl group<n>an aryl group<n>a substituted aryl group<n>an aromatic heterocyclic group<n>a group represented by the formula (2)<ns>R2:a C1-C8 alkyl group<n>an aryl group<n>a substituted aryl group<n>an aromatic heterocyclic group<n>a group represented by the formula (2)<ns>R3:a C1-C8 alkyl group<n>an aryl group<n>a substituted aryl group<n>an aromatic heterocyclic group<n>a group represented by the formula (2)</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 4 3 0 0 0 M V30 BEGIN ATOM M V30 1 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 2 Bi 1.299038 0.750000 0.000000 0 VAL=3 M V30 3 R 2.598076 -0.000000 0.000000 0 VAL=1 M V30 4 R 1.299038 2.250000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 END BOND M V30 END CTAB M END
*[Bi](*)* |$R1;;R2;R3$,|
*[Bi](*)* |$R1;;R2;R3$,|
<r>R1</r>[Bi](<r>R2</r>)<r>R3</r>
null
[ { "bbox": [ 0.408203125, 0.3408203125, 0.435546875, 0.3662109375 ], "text": "R3" }, { "bbox": [ 0.4794921875, 0.34375, 0.5087890625, 0.369140625 ], "text": "Bi" }, { "bbox": [ 0.5263671875, 0.283203125, 0.5556640625, 0.3095703125 ], "text": "R1" }, { "bbox": [ 0.5283203125, 0.400390625, 0.5595703125, 0.4287109375 ], "text": "R2" }, { "bbox": [ 0.0419921875, 0.509765625, 0.9560546875, 0.544921875 ], "text": "wherein R1 to R3 each represent a C1-C8 alkyl group, an aryl" }, { "bbox": [ 0.044921875, 0.5517578125, 0.953125, 0.58984375 ], "text": "group, a substituted aryl group, an aromatic heterocyclic" }, { "bbox": [ 0.0439453125, 0.5986328125, 0.9560546875, 0.630859375 ], "text": "group or a group represented by the formula (2) where at least" }, { "bbox": [ 0.0439453125, 0.6376953125, 0.9560546875, 0.673828125 ], "text": "one of R1 and R2 is a group represented by the following" }, { "bbox": [ 0.0439453125, 0.6787109375, 0.2177734375, 0.71484375 ], "text": "formula (2)" } ]
27
US8076430B2_13.png
<markush><cxsmi><r>R7</r>C1=C(<r>R6</r>)C(<r>R5</r>)=C(SC)C(<r>R4</r>)=C1<r>R8</r></cxsmi><stable>R4:a C3-C8 alkyl group<n>an aryl group<n>a substituted aryl group<ns>R5:a C3-C8 alkyl group<n>an aryl group<n>a substituted aryl group<ns>R6:a hydrogen atom<n>a C1-C8 alkyl group<n>an aryl group<n>a substituted aryl group<ns>R7:a hydrogen atom<n>a C1-C8 alkyl group<n>an aryl group<n>a substituted aryl group<ns>R8:a hydrogen atom<n>a C1-C8 alkyl group<n>an aryl group<n>a substituted aryl group</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 13 13 0 0 0 M V30 BEGIN ATOM M V30 1 C 3.750000 1.299038 0.000000 0 M V30 2 S 2.250000 1.299038 0.000000 0 M V30 3 C 0.800000 0.000000 0.000000 0 M V30 4 C 0.350000 -0.606218 0.000000 0 M V30 5 R -1.042046 1.078954 0.000000 0 VAL=1 M V30 6 C -0.400000 -0.692820 0.000000 0 M V30 7 R -2.250000 -1.299038 0.000000 0 VAL=1 M V30 8 C -0.700000 0.000000 0.000000 0 M V30 9 R 0.051550 -0.126557 0.000000 0 VAL=1 M V30 10 C -0.400000 0.692820 0.000000 0 M V30 11 R -2.250000 1.299038 0.000000 0 VAL=1 M V30 12 C 0.350000 0.606218 0.000000 0 M V30 13 R -0.413378 -1.441915 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 2 3 4 M V30 4 1 4 5 M V30 5 1 4 6 M V30 6 1 6 7 M V30 7 2 6 8 M V30 8 1 8 9 M V30 9 1 8 10 M V30 10 1 10 11 M V30 11 2 10 12 M V30 12 1 12 13 M V30 13 1 12 3 M V30 END BOND M V30 END CTAB M END
*C1=C(*)C(*)=C(SC)C(*)=C1* |$R7;;;R6;;R5;;;;;R4;;R8$,|
*C1=C(*)C(*)=C(SC)C(*)=C1* |$R7;;;R6;;R5;;;;;R4;;R8$,|
<r>R7</r>C1=C(<r>R6</r>)C(<r>R5</r>)=C(SC)C(<r>R4</r>)=C1<r>R8</r>
null
[ { "bbox": [ 0.3642578125, 0.365234375, 0.380859375, 0.3896484375 ], "text": "S" }, { "bbox": [ 0.4248046875, 0.240234375, 0.4599609375, 0.26953125 ], "text": "R5" }, { "bbox": [ 0.5595703125, 0.240234375, 0.5927734375, 0.26953125 ], "text": "R6" }, { "bbox": [ 0.62890625, 0.353515625, 0.6591796875, 0.384765625 ], "text": "R7" }, { "bbox": [ 0.5595703125, 0.4736328125, 0.591796875, 0.50390625 ], "text": "R8" }, { "bbox": [ 0.423828125, 0.4736328125, 0.4580078125, 0.501953125 ], "text": "R4" }, { "bbox": [ 0.0419921875, 0.5693359375, 0.9521484375, 0.6064453125 ], "text": "wherein R4 and R5 each represent a C3-C8 alkyl group, an" }, { "bbox": [ 0.0439453125, 0.6123046875, 0.953125, 0.6484375 ], "text": "aryl group or a substituted aryl group, and R6 to R8 each" }, { "bbox": [ 0.0458984375, 0.650390625, 0.953125, 0.685546875 ], "text": "represent a hydrogen atom, a C1-C8 alkyl group, an aryl" }, { "bbox": [ 0.044921875, 0.689453125, 0.9521484375, 0.7265625 ], "text": "group or a substituted aryl group, and R3 is a group other than" }, { "bbox": [ 0.044921875, 0.7294921875, 0.4775390625, 0.759765625 ], "text": "the at least one of R1 and R2." } ]
28
US8076430B2_13_2.png
<markush><cxsmi><r>X</r>[Bi](<r>X</r>)<r>X</r></cxsmi><stable>X:halogen atom<n>a C1-C8 alkyl group<n>an aryl group<n>a substituted aryl group<n>an aromatic heterocyclic group</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 4 3 0 0 0 M V30 BEGIN ATOM M V30 1 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 2 Bi 1.299038 0.750000 0.000000 0 VAL=3 M V30 3 R 2.598076 -0.000000 0.000000 0 VAL=1 M V30 4 R 1.299038 2.250000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 END BOND M V30 END CTAB M END
*[Bi](*)* |$X;;X;X$,|
*[Bi](*)* |$X;;X;X$,|
<r>X</r>[Bi](<r>X</r>)<r>X</r>
null
[ { "bbox": [ 0.4091796875, 0.3876953125, 0.43359375, 0.4169921875 ], "text": "X" }, { "bbox": [ 0.4833984375, 0.392578125, 0.5107421875, 0.4169921875 ], "text": "Bi" }, { "bbox": [ 0.529296875, 0.3310546875, 0.55078125, 0.3544921875 ], "text": "X" }, { "bbox": [ 0.529296875, 0.4453125, 0.55078125, 0.474609375 ], "text": "X" }, { "bbox": [ 0.044921875, 0.5439453125, 0.9501953125, 0.5791015625 ], "text": "wherein X represents a halogen atom, a C1-C8 alkyl group, an" }, { "bbox": [ 0.0439453125, 0.5888671875, 0.94921875, 0.6220703125 ], "text": "aryl group, a substituted aryl group or an aromatic heterocy-" }, { "bbox": [ 0.0439453125, 0.62890625, 0.8544921875, 0.6611328125 ], "text": "clic group where at least one of Xs is a halogen atom," } ]
29
US8076430B2_13_4.png
<markush><cxsmi><r>R10</r>[Bi](<r>R11</r>)C(<r>R12</r>)(<r>R13</r>)<r>R14</r></cxsmi><stable>R10:a C1-C8 alkyl group<n>an aryl group<n>a substituted aryl group<n>an aromatic heterocyclic group<ns>R11:a C1-C8 alkyl group<n>an aryl group<n>a substituted aryl group<n>an aromatic heterocyclic group<ns>R12:a hydrogen atom<n>a C1-C8 alkyl group<ns>R13:a hydrogen atom<n>a C1-C8 alkyl group<ns>R14:aryl group<n>a substituted aryl group<n>an aromatic heterocyclic group<n>an acyl group<n>an amido group<n>an oxycarbonyl group<n>a cyano group</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 7 6 0 0 0 M V30 BEGIN ATOM M V30 1 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 2 Bi 1.299038 0.750000 0.000000 0 VAL=3 M V30 3 R 2.598076 -0.000000 0.000000 0 VAL=1 M V30 4 C 1.299038 2.250000 0.000000 0 M V30 5 R 2.799038 2.250000 0.000000 0 VAL=1 M V30 6 R -0.200962 2.250000 0.000000 0 VAL=1 M V30 7 R 1.299038 3.750000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 4 1 4 5 M V30 5 1 4 6 M V30 6 1 4 7 M V30 END BOND M V30 END CTAB M END
*[Bi](*)C(*)(*)* |$R10;;R11;;R12;R13;R14$,|
*[Bi](*)C(*)(*)* |$R10;;R11;;R12;R13;R14$,|
<r>R10</r>[Bi](<r>R11</r>)C(<r>R12</r>)(<r>R13</r>)<r>R14</r>
null
[ { "bbox": [ 0.3603515625, 0.3369140625, 0.4033203125, 0.365234375 ], "text": "R13" }, { "bbox": [ 0.3935546875, 0.3623046875, 0.439453125, 0.39453125 ], "text": "R12" }, { "bbox": [ 0.4287109375, 0.23828125, 0.4716796875, 0.2685546875 ], "text": "R14" }, { "bbox": [ 0.486328125, 0.3427734375, 0.5166015625, 0.365234375 ], "text": "Bi" }, { "bbox": [ 0.5625, 0.3017578125, 0.603515625, 0.3349609375 ], "text": "R10" }, { "bbox": [ 0.5615234375, 0.3681640625, 0.599609375, 0.400390625 ], "text": "R11" }, { "bbox": [ 0.0419921875, 0.466796875, 0.953125, 0.5078125 ], "text": "wherein R10 and R11 each represent a C1-C8 alkyl group, an" }, { "bbox": [ 0.0439453125, 0.5166015625, 0.953125, 0.5478515625 ], "text": "aryl group, a substituted aryl group or an aromatic heterocy-" }, { "bbox": [ 0.04296875, 0.552734375, 0.947265625, 0.5888671875 ], "text": "clic group, R12 and R13 each represent a hydrogen atom or a" }, { "bbox": [ 0.044921875, 0.5966796875, 0.9521484375, 0.6298828125 ], "text": "C1-C8 alkyl group, and R14 represents an aryl group, a sub-" }, { "bbox": [ 0.0439453125, 0.6396484375, 0.955078125, 0.677734375 ], "text": "stituted aryl group, an aromatic heterocyclic group, an acyl" }, { "bbox": [ 0.0439453125, 0.68359375, 0.9501953125, 0.716796875 ], "text": "group, an amido group, an oxycarbonyl group or a cyano" }, { "bbox": [ 0.0439453125, 0.73046875, 0.1396484375, 0.759765625 ], "text": "group." } ]
30
US8076430B2_13_5.png
<markush><cxsmi><r>R15</r>[Te]C(<r>R12</r>)(<r>R13</r>)<r>R14</r></cxsmi><stable>R15:C1-C8 alkyl group<n>an aryl group<n>a substituted aryl group<n>an aromatic heterocyclic group<ns>R12:a hydrogen atom<n>a C1-C8 alkyl group<ns>R13:a hydrogen atom<n>a C1-C8 alkyl group<ns>R14:an aryl group<n>a substituted aryl group<n>an aromatic heterocyclic group<n>an acyl group<n>an amido group<n>an oxycarbonyl group<n>a cyano group</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 6 5 0 0 0 M V30 BEGIN ATOM M V30 1 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 2 C 1.299038 0.750000 0.000000 0 M V30 3 R 2.598076 1.500000 0.000000 0 VAL=1 M V30 4 R 2.049038 -0.549038 0.000000 0 VAL=1 M V30 5 Te 0.549038 2.049038 0.000000 0 VAL=2 M V30 6 R 1.299038 3.348076 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 4 1 2 5 M V30 5 1 5 6 M V30 END BOND M V30 END CTAB M END
*[Te]C(*)(*)* |$R15;;;R12;R13;R14$,|
*[Te]C(*)(*)* |$R15;;;R12;R13;R14$,|
<r>R15</r>[Te]C(<r>R12</r>)(<r>R13</r>)<r>R14</r>
null
[ { "bbox": [ 0.369140625, 0.365234375, 0.4091796875, 0.3916015625 ], "text": "R13" }, { "bbox": [ 0.435546875, 0.2607421875, 0.4775390625, 0.2890625 ], "text": "R14" }, { "bbox": [ 0.3994140625, 0.3896484375, 0.4453125, 0.4189453125 ], "text": "R12" }, { "bbox": [ 0.4970703125, 0.369140625, 0.5263671875, 0.392578125 ], "text": "Te" }, { "bbox": [ 0.5537109375, 0.3271484375, 0.59765625, 0.357421875 ], "text": "R15" }, { "bbox": [ 0.044921875, 0.484375, 0.953125, 0.5205078125 ], "text": "wherein R15 represents a C1-C8 alkyl group, an aryl group, a" }, { "bbox": [ 0.0439453125, 0.529296875, 0.9501953125, 0.5615234375 ], "text": "substituted aryl group or an aromatic heterocyclic group, R12" }, { "bbox": [ 0.0439453125, 0.5693359375, 0.953125, 0.60546875 ], "text": "and R13 each represent a hydrogen atom or a C1-C8 alkyl" }, { "bbox": [ 0.044921875, 0.61328125, 0.953125, 0.6513671875 ], "text": "group, and R14 represents an aryl group, a substituted aryl" }, { "bbox": [ 0.044921875, 0.658203125, 0.9501953125, 0.69140625 ], "text": "group, an aromatic heterocyclic group, an acyl group, an" }, { "bbox": [ 0.0439453125, 0.7021484375, 0.857421875, 0.7353515625 ], "text": "amido group, an oxycarbonyl group or a cyano group." } ]
31
US20060078834A1_26_c.png
<markush><cxsmi><r>A12</r>C1=CC(=C(<r>R11</r>)C2=C([O-])C(=C(<r>Q11</r>)<r>R12</r>)C2=O)C=C(<r>A11</r>)<r>Z11</r>1</cxsmi><stable>R11:a hydrogen atom<n>a substituent<ns>R12:a hydrogen atom<n>a substituent<ns>Z11:O<n>S<n>N—R1<n>Se<n>Te<ns>Q11:a 6-membered heteocyclic group<ns>A11:a substituent<ns>A12:a substituent</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 19 20 0 0 0 M V30 BEGIN ATOM M V30 1 O 3.361771 2.747927 0.000000 0 CHG=-1 VAL=1 M V30 2 C 3.018006 0.031188 0.000000 0 M V30 3 C 3.350000 0.606218 0.000000 0 M V30 4 C 2.250000 -1.299038 0.000000 0 M V30 5 R 2.836059 -2.679811 0.000000 0 VAL=1 M V30 6 C 0.750000 -1.299038 0.000000 0 M V30 7 C -0.000000 0.000000 0.000000 0 M V30 8 C 0.750000 1.299038 0.000000 0 M V30 9 R 1.500000 2.598076 0.000000 0 VAL=1 M V30 10 R -0.750000 1.299038 0.000000 0 VAL=2 M V30 11 C -1.500000 0.000000 0.000000 0 M V30 12 R -3.000000 0.000000 0.000000 0 VAL=1 M V30 13 C -0.750000 -1.299038 0.000000 0 M V30 14 C 3.018006 0.031188 0.000000 0 M V30 15 O 5.747927 -0.361771 0.000000 0 M V30 16 C 3.350000 0.606218 0.000000 0 M V30 17 C 2.250000 -1.299038 0.000000 0 M V30 18 R 3.152755 -2.496967 0.000000 0 VAL=1 M V30 19 R 0.794576 -1.661999 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 3 4 M V30 4 1 4 5 M V30 5 2 4 6 CFG=2 M V30 6 1 6 7 M V30 7 2 7 8 M V30 8 1 8 9 M V30 9 1 8 10 M V30 10 1 10 11 M V30 11 1 11 12 M V30 12 2 11 13 M V30 13 1 3 14 M V30 14 2 14 15 M V30 15 1 14 16 M V30 16 2 16 17 CFG=2 M V30 17 1 17 18 M V30 18 1 17 19 M V30 19 1 16 2 M V30 20 1 13 6 M V30 END BOND M V30 END CTAB M END
*C1=CC(=C(*)C2=C([O-])C(=C(*)*)C2=O)C=C(*)*1 |$A12;;;;;R11;;;;;;Q11;R12;;;;;A11;Z11$,|
*C1=CC(=C(*)C2=C([O-])C(=C(*)*)C2=O)C=C(*)*1 |$A12;;;;;R11;;;;;;Q11;R12;;;;;A11;Z11$,|
<r>A12</r>C1=CC(=C(<r>R11</r>)C2=C([O-])C(=C(<r>Q11</r>)<r>R12</r>)C2=O)C=C(<r>A11</r>)<r>Z11</r>1
null
[ { "bbox": [ 0.1953125, 0.1796875, 0.2373046875, 0.2109375 ], "text": "A11" }, { "bbox": [ 0.1953125, 0.296875, 0.236328125, 0.3349609375 ], "text": "Z11" }, { "bbox": [ 0.1884765625, 0.423828125, 0.2373046875, 0.4521484375 ], "text": "A12" }, { "bbox": [ 0.408203125, 0.3701171875, 0.447265625, 0.4013671875 ], "text": "R11" }, { "bbox": [ 0.52734375, 0.181640625, 0.5458984375, 0.2060546875 ], "text": "O" }, { "bbox": [ 0.52734375, 0.41796875, 0.5556640625, 0.447265625 ], "text": "O-1" }, { "bbox": [ 0.64453125, 0.3701171875, 0.6884765625, 0.4013671875 ], "text": "R12" }, { "bbox": [ 0.71484375, 0.3017578125, 0.7568359375, 0.330078125 ], "text": "Q11" }, { "bbox": [ 0.04296875, 0.5537109375, 0.951171875, 0.599609375 ], "text": "wherein R11 and R12 are each independently a hydrogen" }, { "bbox": [ 0.0810546875, 0.607421875, 0.9501953125, 0.6396484375 ], "text": "atom or a substituent; Z11 is O, S, N—R1, Se or. Te," }, { "bbox": [ 0.0810546875, 0.6494140625, 0.94921875, 0.6875 ], "text": "provided that R1 is an alkyl group or an aryl group; Q11" }, { "bbox": [ 0.083984375, 0.6923828125, 0.951171875, 0.7275390625 ], "text": "is a 6-membered heterocyclic group; A11 and A12 are" }, { "bbox": [ 0.080078125, 0.73828125, 0.951171875, 0.7734375 ], "text": "each independently a substituent, provided that A11 and" }, { "bbox": [ 0.083984375, 0.78125, 0.7431640625, 0.8193359375 ], "text": "A12 are different groups from each other," } ]
32
US20060078834A1_28.png
<markush><cxsmi><r>R31</r>C1=C/C(=C(\<r>R11</r>)C2=C([O-])/C(=C(\<r>R12</r>)C3=CC(C4=CC=C(<r>X1</r>)C(<r>X2</r>)=C4)=[O+]C(<r>R31</r>)=C3)C2=O)C=C(C2=CC(<r>X2</r>)=C(<r>X1</r>)C=C2)O1</cxsmi><stable>R11:the same as in Formula (1)<ns>R12:the same as in Formula (1)<ns>X1:a halogen atom<ns>X2:a halogen atom<ns>R31:alkyl group</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 40 44 0 0 0 M V30 BEGIN ATOM M V30 1 O 1.975143 1.928650 0.000000 0 CHG=-1 VAL=1 M V30 2 C 2.611771 1.448889 0.000000 0 M V30 3 C 3.000000 -0.000000 0.000000 0 M V30 4 C 2.250000 -1.299038 0.000000 0 M V30 5 R 3.292046 -2.377992 0.000000 0 VAL=1 M V30 6 C 0.750000 -1.299038 0.000000 0 M V30 7 C 0.000000 0.000000 0.000000 0 M V30 8 C 0.750000 1.299038 0.000000 0 M V30 9 R 1.061456 2.032838 0.000000 0 VAL=1 M V30 10 O -0.750000 1.299038 0.000000 0 M V30 11 C -1.500000 0.000000 0.000000 0 M V30 12 C -0.750000 -1.299038 0.000000 0 M V30 13 C -3.000000 0.000000 0.000000 0 M V30 14 C -3.750000 1.299038 0.000000 0 M V30 15 C -4.500000 0.000000 0.000000 0 M V30 16 R -3.457954 -1.078954 0.000000 0 VAL=1 M V30 17 C -6.000000 0.000000 0.000000 0 M V30 18 R -7.500000 0.000000 0.000000 0 VAL=1 M V30 19 C -5.250000 -1.299038 0.000000 0 M V30 20 C -3.750000 -1.299038 0.000000 0 M V30 21 C 4.448889 0.388229 0.000000 0 M V30 22 O 5.747927 -0.361771 0.000000 0 M V30 23 C 3.000000 -0.000000 0.000000 0 M V30 24 C 2.250000 -1.299038 0.000000 0 M V30 25 R 0.794576 -1.661999 0.000000 0 VAL=1 M V30 26 C 3.000000 -2.598076 0.000000 0 M V30 27 C 2.250000 -3.897114 0.000000 0 M V30 28 C 3.000000 -5.196152 0.000000 0 M V30 29 O 4.500000 -5.196152 0.000000 0 CHG=1 VAL=3 M V30 30 C 5.250000 -3.897114 0.000000 0 M V30 31 R 6.750000 -3.897114 0.000000 0 VAL=1 M V30 32 C 4.500000 -2.598076 0.000000 0 M V30 33 C 2.250000 -6.495191 0.000000 0 M V30 34 C 0.750000 -6.495191 0.000000 0 M V30 35 C 1.500000 -7.794229 0.000000 0 M V30 36 C 0.750000 -9.093267 0.000000 0 M V30 37 R 0.000000 -10.392305 0.000000 0 VAL=1 M V30 38 C 2.250000 -9.093267 0.000000 0 M V30 39 R 3.000000 -10.392305 0.000000 0 VAL=1 M V30 40 C 3.000000 -7.794229 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 3 4 M V30 4 1 4 5 M V30 5 2 4 6 M V30 6 1 6 7 M V30 7 2 7 8 M V30 8 1 8 9 M V30 9 1 8 10 M V30 10 1 10 11 M V30 11 2 11 12 M V30 12 1 11 13 M V30 13 2 13 14 M V30 14 1 14 15 M V30 15 1 15 16 M V30 16 2 15 17 M V30 17 1 17 18 M V30 18 1 17 19 M V30 19 2 19 20 M V30 20 1 3 21 M V30 21 2 21 22 M V30 22 1 21 23 M V30 23 2 23 24 M V30 24 1 24 25 M V30 25 1 24 26 M V30 26 2 26 27 M V30 27 1 27 28 M V30 28 2 28 29 M V30 29 1 29 30 M V30 30 1 30 31 M V30 31 2 30 32 M V30 32 1 28 33 M V30 33 2 33 34 M V30 34 1 34 35 M V30 35 2 35 36 M V30 36 1 36 37 M V30 37 1 36 38 M V30 38 1 38 39 M V30 39 2 38 40 M V30 40 1 23 2 M V30 41 1 32 26 M V30 42 1 40 33 M V30 43 1 12 6 M V30 44 1 20 13 M V30 END BOND M V30 END CTAB M END
*C1=C/C(=C(\*)C2=C([O-])/C(=C(\*)C3=CC(C4=CC=C(*)C(*)=C4)=[O+]C(*)=C3)C2=O)C=C(C2=CC(*)=C(*)C=C2)O1 |$R31;;;;;R11;;;;;;R12;;;;;;;;X1;;X2;;;;R31;;;;;;;;;X2;;X1;;;$,|
*C1=C/C(=C(\*)C2=C([O-])/C(=C(\*)C3=CC(C4=CC=C(*)C(*)=C4)=[O+]C(*)=C3)C2=O)C=C(C2=CC(*)=C(*)C=C2)O1 |$R31;;;;;R11;;;;;;R12;;;;;;;;X1;;X2;;;;R31;;;;;;;;;X2;;X1;;;$,|
<r>R31</r>C1=C/C(=C(\<r>R11</r>)C2=C([O-])/C(=C(\<r>R12</r>)C3=CC(C4=CC=C(<r>X1</r>)C(<r>X2</r>)=C4)=[O+]C(<r>R31</r>)=C3)C2=O)C=C(C2=CC(<r>X2</r>)=C(<r>X1</r>)C=C2)O1
null
[ { "bbox": [ 0.0439453125, 0.1552734375, 0.07421875, 0.181640625 ], "text": "X1" }, { "bbox": [ 0.1806640625, 0.1572265625, 0.2158203125, 0.18359375 ], "text": "X2" }, { "bbox": [ 0.1494140625, 0.4541015625, 0.1689453125, 0.4775390625 ], "text": "O" }, { "bbox": [ 0.1494140625, 0.5751953125, 0.1875, 0.6015625 ], "text": "R31" }, { "bbox": [ 0.353515625, 0.521484375, 0.3935546875, 0.552734375 ], "text": "R11" }, { "bbox": [ 0.4716796875, 0.333984375, 0.4912109375, 0.359375 ], "text": "O" }, { "bbox": [ 0.4736328125, 0.5693359375, 0.50390625, 0.5927734375 ], "text": "O-1" }, { "bbox": [ 0.5927734375, 0.521484375, 0.630859375, 0.5517578125 ], "text": "R12" }, { "bbox": [ 0.794921875, 0.451171875, 0.8291015625, 0.4755859375 ], "text": "O+1" }, { "bbox": [ 0.7978515625, 0.5751953125, 0.837890625, 0.6015625 ], "text": "R31" }, { "bbox": [ 0.7626953125, 0.15625, 0.7939453125, 0.18359375 ], "text": "X2" }, { "bbox": [ 0.900390625, 0.15625, 0.9296875, 0.181640625 ], "text": "X1" }, { "bbox": [ 0.0625, 0.7099609375, 0.9521484375, 0.744140625 ], "text": "wherein R11 and R12 are each respectively the same as R11" }, { "bbox": [ 0.1025390625, 0.755859375, 0.953125, 0.79296875 ], "text": "and R12 in Formula (1); X1 and X2 are each indepen-" }, { "bbox": [ 0.1025390625, 0.8046875, 0.8896484375, 0.83984375 ], "text": "dently a halogen atom; and R31 is an alkyl group." } ]
33
US20110217348A1_18.png
<markush><cxsmi><r>R2</r>C=C(<r>R1</r>)C(=O)O<r>R3</r></cxsmi><stable>R1:C1-to C10-alkyl<n>H<ns>R2:C1-to C10-alkyl<n>H<ns>R3:C1-to C10-alkyl<n>H</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 8 7 0 0 0 M V30 BEGIN ATOM M V30 1 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 2 C 1.299038 0.750000 0.000000 0 M V30 3 C 2.598076 -0.000000 0.000000 0 M V30 4 R 3.897114 0.750000 0.000000 0 VAL=1 M V30 5 C 1.299038 2.250000 0.000000 0 M V30 6 O 2.598076 3.000000 0.000000 0 M V30 7 O 0.000000 3.000000 0.000000 0 M V30 8 R 0.000000 4.500000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 CFG=2 M V30 3 1 3 4 M V30 4 1 2 5 M V30 5 2 5 6 M V30 6 1 5 7 M V30 7 1 7 8 M V30 END BOND M V30 END CTAB M END
*C=C(*)C(=O)O* |$R2;;;R1;;;;R3$,|
*C=C(*)C(=O)O* |$R2;;;R1;;;;R3$,|
<r>R2</r>C=C(<r>R1</r>)C(=O)O<r>R3</r>
null
[ { "bbox": [ 0.083984375, 0.3291015625, 0.1142578125, 0.3583984375 ], "text": "R2" }, { "bbox": [ 0.1875, 0.2734375, 0.2099609375, 0.29296875 ], "text": "O" }, { "bbox": [ 0.2939453125, 0.32421875, 0.349609375, 0.3564453125 ], "text": "OR3" }, { "bbox": [ 0.22265625, 0.4482421875, 0.25390625, 0.4765625 ], "text": "R1" }, { "bbox": [ 0.0439453125, 0.5556640625, 0.171875, 0.5888671875 ], "text": "wherein" }, { "bbox": [ 0.0439453125, 0.5966796875, 0.955078125, 0.6376953125 ], "text": "R1, R2 and R3 are independently C1-to C10-alkyl which is" }, { "bbox": [ 0.0859375, 0.6435546875, 0.951171875, 0.6796875 ], "text": "linear or branched, or substituted or unsubstituted aryl;" }, { "bbox": [ 0.0439453125, 0.6865234375, 0.4716796875, 0.7275390625 ], "text": "R1 and R2 are optionally H." } ]
34
US20110217348A1_18_2.png
<markush><cxsmi>C<r>R4</r>C1C(=O)C(<r>R4</r>C)C(=O)C(<r>R4</r>C)C1=O|Sg:n:1,2,3,5,8,10,13,4,6,9,7,11,14: :ht</cxsmi><stable>R4:an alkylene or arylene residue</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 15 15 1 0 0 M V30 BEGIN ATOM M V30 1 C 3.750000 -1.299038 0.000000 0 M V30 2 R 3.000000 0.000000 0.000000 0 VAL=2 M V30 3 C 1.500000 0.000000 0.000000 0 M V30 4 C 0.750000 -1.299038 0.000000 0 M V30 5 O 1.500000 -2.598076 0.000000 0 M V30 6 C -0.750000 -1.299038 0.000000 0 M V30 7 R -1.500000 -2.598076 0.000000 0 VAL=2 M V30 8 C -3.000000 -2.598076 0.000000 0 M V30 9 C -1.500000 0.000000 0.000000 0 M V30 10 O -3.000000 0.000000 0.000000 0 M V30 11 C -0.750000 1.299038 0.000000 0 M V30 12 R -1.500000 2.598076 0.000000 0 VAL=2 M V30 13 C -0.750000 3.897114 0.000000 0 M V30 14 C 0.750000 1.299038 0.000000 0 M V30 15 O 1.500000 2.598076 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 3 4 M V30 4 2 4 5 M V30 5 1 4 6 M V30 6 1 6 7 M V30 7 1 7 8 M V30 8 1 6 9 M V30 9 2 9 10 M V30 10 1 9 11 M V30 11 1 11 12 M V30 12 1 12 13 M V30 13 1 11 14 M V30 14 2 14 15 M V30 15 1 14 3 M V30 END BOND M V30 BEGIN SGROUP M V30 1 SRU 0 ATOMS=(13 2 3 4 6 9 11 14 5 7 10 8 12 15) - M V30 XBONDS=(1 1) XBHEAD=(1 1) CONNECT=HT M V30 END SGROUP M V30 END CTAB M END
C*C1C(=O)C(*C)C(=O)C(*C)C1=O |$;R4;;;;;R4;;;;;R4;;;$,Sg:n:1,2,3,5,8,10,13,4,6,9,7,11,14: :ht:::,|
C*C1C(=O)C(*C)C(=O)C(*C)C1=O |$;R4;;;;;R4;;;;;R4;;;$,Sg:n:1,2,3,5,8,10,13,4,6,9,7,11,14: :ht:::,|
C<r>R4</r>C1C(=O)C(<r>R4</r>C)C(=O)C(<r>R4</r>C)C1=O|Sg:n:1,2,3,5,8,10,13,4,6,9,7,11,14: :ht
null
[ { "bbox": [ 0.1455078125, 0.529296875, 0.1845703125, 0.5625 ], "text": "R4" }, { "bbox": [ 0.140625, 0.3525390625, 0.169921875, 0.3818359375 ], "text": "O" }, { "bbox": [ 0.2998046875, 0.2568359375, 0.3427734375, 0.291015625 ], "text": "R4" }, { "bbox": [ 0.4599609375, 0.3505859375, 0.48828125, 0.3837890625 ], "text": "O" }, { "bbox": [ 0.4609375, 0.52734375, 0.5, 0.5625 ], "text": "R4" }, { "bbox": [ 0.2998046875, 0.625, 0.3291015625, 0.6513671875 ], "text": "O" }, { "bbox": [ 0.0439453125, 0.76171875, 0.958984375, 0.810546875 ], "text": "wherein R4 is an alkylene or arylene residue;" } ]
35
US20200041896A1_18.png
<markush><cxsmi><r>R32</r>O[Sn](<r>L</r>[Sn](O<r>R35</r>)(OC(<r>R34</r>)=O)OC(<r>R36</r>)=O)(OC(<r>R31</r>)=O)OC(<r>R33</r>)=O</cxsmi><stable>R31:a substituted or unsubstituted C1 to C10 alkyl group<n>a substituted or unsubstituted C3 to C20 cycloalkyll group<n>a substituted or unsubstituted C2 to C8 alkenyl group<n>a substituted or unsubstituted C2 to C8 alkynyl group<n>a substituted or unsubstituted C6 to C30 arylalkyl group<ns>R32:a substituted or unsubstituted C1 to C10 alkyl group<n>a substituted or unsubstituted C3 to C20 cycloalkyll group<n>a substituted or unsubstituted C2 to C8 alkenyl group<n>a substituted or unsubstituted C2 to C8 alkynyl group<n>a substituted or unsubstituted C6 to C30 arylalkyl group<ns>R33:a substituted or unsubstituted C1 to C10 alkyl group<n>a substituted or unsubstituted C3 to C20 cycloalkyll group<n>a substituted or unsubstituted C2 to C8 alkenyl group<n>a substituted or unsubstituted C2 to C8 alkynyl group<n>a substituted or unsubstituted C6 to C30 arylalkyl group<ns>R34:a substituted or unsubstituted C1 to C10 alkyl group<n>a substituted or unsubstituted C3 to C20 cycloalkyll group<n>a substituted or unsubstituted C2 to C8 alkenyl group<n>a substituted or unsubstituted C2 to C8 alkynyl group<n>a substituted or unsubstituted C6 to C30 arylalkyl group<ns>R35:a substituted or unsubstituted C1 to C10 alkyl group<n>a substituted or unsubstituted C3 to C20 cycloalkyll group<n>a substituted or unsubstituted C2 to C8 alkenyl group<n>a substituted or unsubstituted C2 to C8 alkynyl group<n>a substituted or unsubstituted C6 to C30 arylalkyl group<ns>R36:a substituted or unsubstituted C1 to C10 alkyl group<n>a substituted or unsubstituted C3 to C20 cycloalkyll group<n>a substituted or unsubstituted C2 to C8 alkenyl group<n>a substituted or unsubstituted C2 to C8 alkynyl group<n>a substituted or unsubstituted C6 to C30 arylalkyl group<ns>L:divalent linking group</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 23 22 0 0 0 M V30 BEGIN ATOM M V30 1 R -1.299038 2.250000 0.000000 0 VAL=1 M V30 2 C -0.000000 3.000000 0.000000 0 M V30 3 O -0.000000 4.500000 0.000000 0 M V30 4 O 1.299038 2.250000 0.000000 0 M V30 5 Sn 2.598076 3.000000 0.000000 0 VAL=4 M V30 6 O 3.348076 1.700962 0.000000 0 M V30 7 R 2.598076 0.401924 0.000000 0 VAL=1 M V30 8 O 1.848076 4.299038 0.000000 0 M V30 9 C 2.598076 5.598076 0.000000 0 M V30 10 R 1.848076 6.897114 0.000000 0 VAL=1 M V30 11 O 4.098076 5.598076 0.000000 0 M V30 12 R 3.897114 3.750000 0.000000 0 VAL=2 M V30 13 Sn 5.196152 3.000000 0.000000 0 VAL=4 M V30 14 O 6.495191 2.250000 0.000000 0 M V30 15 R 7.501774 2.677237 0.000000 0 VAL=1 M V30 16 O 4.446152 1.700962 0.000000 0 M V30 17 C 5.196152 0.401924 0.000000 0 M V30 18 R 4.446152 -0.897114 0.000000 0 VAL=1 M V30 19 O 6.696152 0.401924 0.000000 0 M V30 20 O 5.946152 4.299038 0.000000 0 M V30 21 C 7.446152 4.299038 0.000000 0 M V30 22 R 8.196152 5.598076 0.000000 0 VAL=1 M V30 23 O 8.104261 3.425748 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 2 4 M V30 4 1 4 5 M V30 5 1 5 6 M V30 6 1 6 7 M V30 7 1 5 8 M V30 8 1 8 9 M V30 9 1 9 10 M V30 10 2 9 11 M V30 11 1 5 12 M V30 12 1 12 13 M V30 13 1 13 14 M V30 14 1 14 15 M V30 15 1 13 16 M V30 16 1 16 17 M V30 17 1 17 18 M V30 18 2 17 19 M V30 19 1 13 20 M V30 20 1 20 21 M V30 21 1 21 22 M V30 22 2 21 23 M V30 END BOND M V30 END CTAB M END
*O[Sn](*[Sn](O*)(OC(*)=O)OC(*)=O)(OC(*)=O)OC(*)=O |$R32;;;L;;;R35;;;R34;;;;R36;;;;R31;;;;R33;$,|
*O[Sn](*[Sn](O*)(OC(*)=O)OC(*)=O)(OC(*)=O)OC(*)=O |$R32;;;L;;;R35;;;R34;;;;R36;;;;R31;;;;R33;$,|
<r>R32</r>O[Sn](<r>L</r>[Sn](O<r>R35</r>)(OC(<r>R34</r>)=O)OC(<r>R36</r>)=O)(OC(<r>R31</r>)=O)OC(<r>R33</r>)=O
null
[ { "bbox": [ 0.1513671875, 0.13671875, 0.1884765625, 0.166015625 ], "text": "R31" }, { "bbox": [ 0.212890625, 0.0498046875, 0.2353515625, 0.068359375 ], "text": "O" }, { "bbox": [ 0.26953125, 0.1416015625, 0.2880859375, 0.1650390625 ], "text": "O" }, { "bbox": [ 0.2724609375, 0.208984375, 0.30078125, 0.2294921875 ], "text": "Sn" }, { "bbox": [ 0.20703125, 0.2080078125, 0.2275390625, 0.2294921875 ], "text": "O" }, { "bbox": [ 0.1513671875, 0.248046875, 0.189453125, 0.2734375 ], "text": "R32" }, { "bbox": [ 0.26953125, 0.271484375, 0.2880859375, 0.2900390625 ], "text": "O" }, { "bbox": [ 0.365234375, 0.326171875, 0.3837890625, 0.345703125 ], "text": "O" }, { "bbox": [ 0.2607421875, 0.3759765625, 0.298828125, 0.4013671875 ], "text": "R33" }, { "bbox": [ 0.3466796875, 0.205078125, 0.3681640625, 0.2294921875 ], "text": "L" }, { "bbox": [ 0.353515625, 0.0478515625, 0.3740234375, 0.068359375 ], "text": "O" }, { "bbox": [ 0.4677734375, 0.04296875, 0.5068359375, 0.0693359375 ], "text": "R36" }, { "bbox": [ 0.41015625, 0.1416015625, 0.4296875, 0.1630859375 ], "text": "O" }, { "bbox": [ 0.4130859375, 0.2080078125, 0.4423828125, 0.2294921875 ], "text": "Sn" }, { "bbox": [ 0.4892578125, 0.2060546875, 0.509765625, 0.2275390625 ], "text": "O" }, { "bbox": [ 0.53125, 0.15625, 0.5712890625, 0.181640625 ], "text": "R35" }, { "bbox": [ 0.412109375, 0.26953125, 0.431640625, 0.2900390625 ], "text": "O" }, { "bbox": [ 0.521484375, 0.2626953125, 0.560546875, 0.29296875 ], "text": "R34" }, { "bbox": [ 0.4697265625, 0.3671875, 0.486328125, 0.3876953125 ], "text": "O" }, { "bbox": [ 0.087890625, 0.4892578125, 0.9072265625, 0.5244140625 ], "text": "wherein, in Chemical Formula 2 to Chemical Formula 4," }, { "bbox": [ 0.087890625, 0.5458984375, 0.9072265625, 0.5869140625 ], "text": "R11 to R16, R21 to R26, and R31 to R36 are each indepen-" }, { "bbox": [ 0.123046875, 0.5908203125, 0.9072265625, 0.619140625 ], "text": "dently selected from a substituted or unsubstituted C1" }, { "bbox": [ 0.1240234375, 0.630859375, 0.9052734375, 0.6640625 ], "text": "to C10 alkyl group, a substituted or unsubstituted C3 to" }, { "bbox": [ 0.1240234375, 0.671875, 0.9052734375, 0.7021484375 ], "text": "C20 cycloalkyl] group, a substituted or unsubstituted C2" }, { "bbox": [ 0.12109375, 0.7099609375, 0.9072265625, 0.7431640625 ], "text": "to C8 alkenyl group, a substituted or unsubstituted C2" }, { "bbox": [ 0.1240234375, 0.75, 0.9072265625, 0.7802734375 ], "text": "to C8 alkynyl group, and a substituted or unsubstituted" }, { "bbox": [ 0.123046875, 0.7900390625, 0.58203125, 0.8232421875 ], "text": "C6 to C30 arylalkyl group, and" }, { "bbox": [ 0.087890625, 0.84765625, 0.9111328125, 0.8798828125 ], "text": "L is a divalent linking group comprising at least one" }, { "bbox": [ 0.123046875, 0.884765625, 0.9091796875, 0.9189453125 ], "text": "substituted or unsubstituted C1 to C20 alkylene group" }, { "bbox": [ 0.1240234375, 0.9296875, 0.384765625, 0.955078125 ], "text": "in the main chain." } ]
36
WO2000004894A2_34.png
<markush><cxsmi><r>M</r>OC(=O)CCC(NC(=O)CC(<r>R</r>)(<r>R1</r>)<r>R2</r>)C(N)=O|Sg:n:10:n:ht</cxsmi><stable>R:H<n>lower alkoxy (C1-6)<n>lower alkyl (C1-6)<ns>R1:H<n>lower alkoxy (C1-6)<n>lower alkyl (C1-6)<ns>R2:Formula II</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 18 17 1 0 0 M V30 BEGIN ATOM M V30 1 N 9.093267 0.750000 0.000000 0 M V30 2 C 7.794229 -0.000000 0.000000 0 M V30 3 O 7.794229 -1.500000 0.000000 0 M V30 4 C 6.495191 0.750000 0.000000 0 M V30 5 C 5.196152 -0.000000 0.000000 0 M V30 6 C 3.897114 0.750000 0.000000 0 M V30 7 C 2.598076 -0.000000 0.000000 0 M V30 8 O 2.598076 -1.500000 0.000000 0 M V30 9 O 1.299038 0.750000 0.000000 0 M V30 10 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 11 N 6.495191 2.250000 0.000000 0 M V30 12 C 7.794229 3.000000 0.000000 0 M V30 13 O 9.093267 2.250000 0.000000 0 M V30 14 C 7.794229 4.500000 0.000000 0 M V30 15 C 9.093267 5.250000 0.000000 0 M V30 16 R 8.343267 6.549038 0.000000 0 VAL=1 M V30 17 R 9.843267 3.950962 0.000000 0 VAL=1 M V30 18 R 10.392305 6.000000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 2 4 M V30 4 1 4 5 M V30 5 1 5 6 M V30 6 1 6 7 M V30 7 2 7 8 M V30 8 1 7 9 M V30 9 1 9 10 M V30 10 1 4 11 M V30 11 1 11 12 M V30 12 2 12 13 M V30 13 1 12 14 M V30 14 1 14 15 M V30 15 1 15 16 M V30 16 1 15 17 M V30 17 1 15 18 M V30 END BOND M V30 BEGIN SGROUP M V30 1 SRU 0 ATOMS=(1 14) XBONDS=(2 13 14) XBHEAD=(1 13) XBCORR=(2 13 14) - M V30 CONNECT=HT LABEL=n M V30 END SGROUP M V30 END CTAB M END
*OC(=O)CCC(NC(=O)CC(*)(*)*)C(N)=O |$M;;;;;;;;;;;;R;R1;R2;;;$,Sg:n:10:n:ht:::,|
*OC(=O)CCC(NC(=O)CC(*)(*)*)C(N)=O |$M;;;;;;;;;;;;R;R1;R2;;;$,Sg:n:10:n:ht:::,|
<r>M</r>OC(=O)CCC(NC(=O)CC(<r>R</r>)(<r>R1</r>)<r>R2</r>)C(N)=O|Sg:n:10:n:ht
null
[ { "bbox": [ 0.109375, 0.41796875, 0.134765625, 0.4443359375 ], "text": "R2" }, { "bbox": [ 0.19140625, 0.34375, 0.2109375, 0.3681640625 ], "text": "R" }, { "bbox": [ 0.193359375, 0.48828125, 0.21875, 0.5224609375 ], "text": "R1" }, { "bbox": [ 0.3193359375, 0.4052734375, 0.3310546875, 0.4248046875 ], "text": "n" }, { "bbox": [ 0.380859375, 0.5009765625, 0.3974609375, 0.525390625 ], "text": "O" }, { "bbox": [ 0.4296875, 0.416015625, 0.4482421875, 0.435546875 ], "text": "N" }, { "bbox": [ 0.427734375, 0.3408203125, 0.4443359375, 0.359375 ], "text": "H" }, { "bbox": [ 0.4296875, 0.5458984375, 0.4482421875, 0.564453125 ], "text": "O" }, { "bbox": [ 0.546875, 0.5478515625, 0.5947265625, 0.572265625 ], "text": "N" }, { "bbox": [ 0.6875, 0.33203125, 0.7041015625, 0.3515625 ], "text": "O" }, { "bbox": [ 0.75, 0.44140625, 0.7890625, 0.4609375 ], "text": "OM" }, { "bbox": [ 0.0458984375, 0.59375, 0.955078125, 0.619140625 ], "text": "wherein R and R1 are independently selected from the group consisting of H, lower" }, { "bbox": [ 0.1181640625, 0.6396484375, 0.810546875, 0.6640625 ], "text": "alkoxy (C1-6), and lower alkyl (C1-6); R2 is selected from Formula II;" } ]
37
WO2020146194A1_22_c.png
<markush><cxsmi><r>R1</r>C1=NO<r>X</r>=C1C(=O)N[C@H](C1=CN2N=CC(C(<r>R2</r>)N3C[C@@H](C(F)(F)F)NC3=O)=CC2=N1)C1CCC(F)(F)CC1</cxsmi><stable>X:CH<n>N<ns>R1:-CH3<n>-CH2F<n>-CHF2<n>-CF3<n>-CH2CH3<n>-CH2CF3<n>-CH(CH3)2<n>-CH2CHF2<n>-CH2CH2F<n>-CF(CH3)2<n>-CF2CH3<n>-OCH3<ns>R2:-H<n>-CH2OCH3</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 39 43 0 0 0 M V30 BEGIN ATOM M V30 1 F 7.735314 -0.084720 0.000000 0 M V30 2 C 6.521788 -0.966398 0.000000 0 M V30 3 F 7.403466 -2.179924 0.000000 0 M V30 4 F 5.640110 0.247127 0.000000 0 M V30 5 C 5.308263 -1.848076 0.000000 0 M V30 6 C 3.881678 -1.384551 0.000000 0 M V30 7 N 3.000000 -2.598076 0.000000 0 M V30 8 C 1.500000 -2.598076 0.000000 0 M V30 9 R 0.750000 -3.897114 0.000000 0 VAL=1 M V30 10 C 0.750000 -1.299038 0.000000 0 M V30 11 C 1.500000 0.000000 0.000000 0 M V30 12 C 0.750000 1.299038 0.000000 0 M V30 13 N 1.213525 2.725623 0.000000 0 M V30 14 C 0.000000 3.607301 0.000000 0 M V30 15 C -1.213525 2.725623 0.000000 0 M V30 16 N -0.750000 1.299038 0.000000 0 M V30 17 N -1.500000 0.000000 0.000000 0 M V30 18 C -0.750000 -1.299038 0.000000 0 M V30 19 C 0.000000 5.107301 0.000000 0 M V30 20 N -1.299038 5.857301 0.000000 0 M V30 21 C -1.299038 7.357301 0.000000 0 M V30 22 O 0.000000 8.107301 0.000000 0 M V30 23 C -2.598076 8.107301 0.000000 0 M V30 24 R -3.601772 9.222018 0.000000 0 VAL=3 M V30 25 O -2.851772 10.521056 0.000000 0 M V30 26 N -1.384551 10.209189 0.000000 0 M V30 27 C -2.754869 9.599084 0.000000 0 M V30 28 R -4.053907 10.349084 0.000000 0 VAL=1 M V30 29 C 1.299038 5.857301 0.000000 0 M V30 30 C 2.598076 5.107301 0.000000 0 M V30 31 C 3.897114 5.857301 0.000000 0 M V30 32 C 3.897114 7.357301 0.000000 0 M V30 33 F 4.410145 8.766840 0.000000 0 M V30 34 F 5.374326 7.096828 0.000000 0 M V30 35 C 2.598076 8.107301 0.000000 0 M V30 36 C 1.299038 7.357301 0.000000 0 M V30 37 C 3.881678 -3.811602 0.000000 0 M V30 38 O 3.418152 -5.238186 0.000000 0 M V30 39 N 5.308263 -3.348076 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 4 1 5 2 CFG=1 M V30 5 1 5 6 M V30 6 1 6 7 M V30 7 1 7 8 M V30 8 1 8 9 M V30 9 1 8 10 M V30 10 2 10 11 M V30 11 1 11 12 M V30 12 2 12 13 M V30 13 1 13 14 M V30 14 2 14 15 M V30 15 1 15 16 M V30 16 1 16 17 M V30 17 2 17 18 M V30 18 1 14 19 M V30 19 1 19 20 CFG=1 M V30 20 1 20 21 M V30 21 2 21 22 M V30 22 1 21 23 M V30 23 2 23 24 M V30 24 1 24 25 M V30 25 1 25 26 M V30 26 2 26 27 M V30 27 1 27 28 M V30 28 1 19 29 M V30 29 1 29 30 M V30 30 1 30 31 M V30 31 1 31 32 M V30 32 1 32 33 M V30 33 1 32 34 M V30 34 1 32 35 M V30 35 1 35 36 M V30 36 1 7 37 M V30 37 2 37 38 M V30 38 1 37 39 M V30 39 1 39 5 M V30 40 1 18 10 M V30 41 1 27 23 M V30 42 1 36 29 M V30 43 1 16 12 M V30 END BOND M V30 END CTAB M END
*C1=NO*=C1C(=O)N[C@H](C1=CN2N=CC(C(*)N3C[C@@H](C(F)(F)F)NC3=O)=CC2=N1)C1CCC(F)(F)CC1 |$R1;;;;X;;;;;;;;;;;;;R2;;;;;;;;;;;;;;;;;;;;;$,|
*C1=NO*=C1C(=O)N[C@H](C1=CN2N=CC(C(*)N3C[C@@H](C(F)(F)F)NC3=O)=CC2=N1)C1CCC(F)(F)CC1 |$R1;;;;X;;;;;;;;;;;;;R2;;;;;;;;;;;;;;;;;;;;;$,|
<r>R1</r>C1=NO<r>X</r>=C1C(=O)N[C@H](C1=CN2N=CC(C(<r>R2</r>)N3C[C@@H](C(F)(F)F)NC3=O)=CC2=N1)C1CCC(F)(F)CC1
null
[ { "bbox": [ 0.2177734375, 0.22265625, 0.234375, 0.244140625 ], "text": "O" }, { "bbox": [ 0.244140625, 0.1875, 0.259765625, 0.2060546875 ], "text": "N" }, { "bbox": [ 0.326171875, 0.158203125, 0.349609375, 0.1796875 ], "text": "R1" }, { "bbox": [ 0.25, 0.2529296875, 0.265625, 0.2744140625 ], "text": "X" }, { "bbox": [ 0.3203125, 0.2998046875, 0.3388671875, 0.3173828125 ], "text": "O" }, { "bbox": [ 0.35546875, 0.212890625, 0.3720703125, 0.2578125 ], "text": "N" }, { "bbox": [ 0.3662109375, 0.4130859375, 0.3828125, 0.4345703125 ], "text": "F" }, { "bbox": [ 0.4208984375, 0.4169921875, 0.4365234375, 0.4345703125 ], "text": "F" }, { "bbox": [ 0.4345703125, 0.1962890625, 0.447265625, 0.216796875 ], "text": "N" }, { "bbox": [ 0.4912109375, 0.2255859375, 0.5068359375, 0.244140625 ], "text": "N" }, { "bbox": [ 0.5341796875, 0.2236328125, 0.5498046875, 0.244140625 ], "text": "N" }, { "bbox": [ 0.515625, 0.076171875, 0.5390625, 0.095703125 ], "text": "R2" }, { "bbox": [ 0.595703125, 0.115234375, 0.609375, 0.1337890625 ], "text": "N" }, { "bbox": [ 0.6064453125, 0.0439453125, 0.623046875, 0.0634765625 ], "text": "O" }, { "bbox": [ 0.6552734375, 0.095703125, 0.693359375, 0.115234375 ], "text": "N" }, { "bbox": [ 0.7275390625, 0.14453125, 0.7431640625, 0.1630859375 ], "text": "F" }, { "bbox": [ 0.7236328125, 0.1845703125, 0.73828125, 0.2060546875 ], "text": "F" }, { "bbox": [ 0.6875, 0.2021484375, 0.7001953125, 0.220703125 ], "text": "F" }, { "bbox": [ 0.0927734375, 0.466796875, 0.1787109375, 0.4892578125 ], "text": "wherein:" }, { "bbox": [ 0.09375, 0.509765625, 0.236328125, 0.5322265625 ], "text": "X is CH, or N;" }, { "bbox": [ 0.0927734375, 0.5478515625, 0.8515625, 0.5771484375 ], "text": "R1 is -CH3, -CH2F, -CHF2, -CF3, -CH2CH3, -CH2CF3, -CH(CH3)2, -CH2CHF2," }, { "bbox": [ 0.091796875, 0.6826171875, 0.5048828125, 0.70703125 ], "text": "-CH2CH2F, -CF(CH3)2, -CF2CH3, -OCH3," }, { "bbox": [ 0.0927734375, 0.8837890625, 0.328125, 0.9111328125 ], "text": "R2 is -H or -CH2OCH3;" }, { "bbox": [ 0.0927734375, 0.927734375, 0.537109375, 0.953125 ], "text": "or a pharmaceutically acceptable salt thereof," } ]
38
US6239192_9_2.png
<markush><cxsmi><r>R1</r>NC1=NC(N<r>R2</r>)=NC(N<r>R3</r>)=N1</cxsmi><stable>R1:cyclopropyl<n>isopropyl<ns>R2:hydrogen<n>halogen<n>C1-C12-alkylcarbonyl<n>cyclopropylcarbonyl<n>C1-C12-alkylcarbamoyl<n>C1-C12-alkylthiocarbamoyl<n>C2-C6-alkenylcarbamoyl<ns>R3:hydrogen<n>C1-C12-alkyl<n>cyclopropyl<n>C2-C6-alkenyl<n>C1-C12-alkylcarbonyl<n>cyclopropylcarbonyl<n>C1-C12-alkylcarbamoyl<n>C1-C12-alkylthiocarbamoyl<n>C2-C6-alkenylcarbamoyl</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 12 12 0 0 0 M V30 BEGIN ATOM M V30 1 R 3.750000 -1.299038 0.000000 0 VAL=1 M V30 2 N 3.000000 0.000000 0.000000 0 M V30 3 C 1.500000 0.000000 0.000000 0 M V30 4 N 0.750000 -1.299038 0.000000 0 M V30 5 C -0.750000 -1.299038 0.000000 0 M V30 6 N -1.500000 -2.598076 0.000000 0 M V30 7 R -3.000000 -2.598076 0.000000 0 VAL=1 M V30 8 N -1.500000 0.000000 0.000000 0 M V30 9 C -0.750000 1.299038 0.000000 0 M V30 10 N -1.500000 2.598076 0.000000 0 M V30 11 R -0.750000 3.897114 0.000000 0 VAL=1 M V30 12 N 0.750000 1.299038 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 2 3 4 M V30 4 1 4 5 M V30 5 1 5 6 M V30 6 1 6 7 M V30 7 2 5 8 M V30 8 1 8 9 M V30 9 1 9 10 M V30 10 1 10 11 M V30 11 2 9 12 M V30 12 1 12 3 M V30 END BOND M V30 END CTAB M END
*NC1=NC(N*)=NC(N*)=N1 |$R1;;;;;;R2;;;;R3;$,|
*NC1=NC(N*)=NC(N*)=N1 |$R1;;;;;;R2;;;;R3;$,|
<r>R1</r>NC1=NC(N<r>R2</r>)=NC(N<r>R3</r>)=N1
null
[ { "bbox": [ 0.1298828125, 0.3505859375, 0.1591796875, 0.37890625 ], "text": "R2" }, { "bbox": [ 0.205078125, 0.3466796875, 0.2490234375, 0.3720703125 ], "text": "N" }, { "bbox": [ 0.2626953125, 0.248046875, 0.2861328125, 0.271484375 ], "text": "N" }, { "bbox": [ 0.32421875, 0.1494140625, 0.369140625, 0.169921875 ], "text": "N" }, { "bbox": [ 0.4130859375, 0.1494140625, 0.4404296875, 0.173828125 ], "text": "R1" }, { "bbox": [ 0.3857421875, 0.248046875, 0.4052734375, 0.267578125 ], "text": "N" }, { "bbox": [ 0.32421875, 0.3486328125, 0.34375, 0.3720703125 ], "text": "N" }, { "bbox": [ 0.4423828125, 0.3466796875, 0.482421875, 0.3740234375 ], "text": "N" }, { "bbox": [ 0.53125, 0.3466796875, 0.5595703125, 0.3779296875 ], "text": "R3" }, { "bbox": [ 0.0439453125, 0.453125, 0.166015625, 0.48046875 ], "text": "wherein" }, { "bbox": [ 0.044921875, 0.490234375, 0.6494140625, 0.52734375 ], "text": "R1 represents cyclopropyl or isopropyl;" }, { "bbox": [ 0.044921875, 0.5322265625, 0.951171875, 0.568359375 ], "text": "R2 denotes hydrogen, halogen, C1-C12-alkylcarbonyl," }, { "bbox": [ 0.080078125, 0.572265625, 0.94921875, 0.6064453125 ], "text": "cyclopropylcarbonyl, C1-C12-alkylcarbamoyl, C1-C12-" }, { "bbox": [ 0.080078125, 0.611328125, 0.8935546875, 0.6474609375 ], "text": "alkylthiocarbamoyl or C2-C6-alkenylcarbamoyl; and" }, { "bbox": [ 0.0439453125, 0.6513671875, 0.94921875, 0.685546875 ], "text": "R3 represents hydrogen, C1-C12-alkyl, cyclopropyl, C2-C6-" }, { "bbox": [ 0.08203125, 0.693359375, 0.94921875, 0.7275390625 ], "text": "alkenyl, C1-C12-alkylcarbonyl, cyclopropylcarbonyl," }, { "bbox": [ 0.08203125, 0.736328125, 0.94921875, 0.771484375 ], "text": "C1-C12-alkylcarbamoyl, C1-C12-alkylthiocarbamoyl or" }, { "bbox": [ 0.080078125, 0.7763671875, 0.951171875, 0.8095703125 ], "text": "C2-C6-alkenylcarbamoyl, and acid addition sals thereof" }, { "bbox": [ 0.080078125, 0.8193359375, 0.802734375, 0.849609375 ], "text": "which are non-toxic to warm-blooded animals." } ]
39
US6444415_41.png
<markush><cxsmi><r>R''</r>C1=CC(<r>R'</r>)=C(O)C(C(<r>R</r>)C2=C(O)C(<r>R'</r>)=CC(<r>R''</r>)=C2)=C1</cxsmi><stable>R:a hydrogen atom<n>an alkyl group having from 1 to 10 carbon atoms<ns>R':an alkyl group having from 1 to 5 carbon atoms<ns>R'':an alkyl group having from 1 to 5 carbon atoms</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 20 21 0 0 0 M V30 BEGIN ATOM M V30 1 O 2.402755 1.197929 0.000000 0 M V30 2 C 0.800000 0.000000 0.000000 0 M V30 3 C 0.350000 -0.606218 0.000000 0 M V30 4 C -0.400000 -0.692820 0.000000 0 M V30 5 C -0.700000 0.000000 0.000000 0 M V30 6 R 0.051550 -0.126557 0.000000 0 VAL=1 M V30 7 C -0.400000 0.692820 0.000000 0 M V30 8 C 0.350000 0.606218 0.000000 0 M V30 9 R -0.413378 -1.441915 0.000000 0 VAL=1 M V30 10 C -0.750000 1.299038 0.000000 0 M V30 11 R -2.250000 1.299038 0.000000 0 VAL=1 M V30 12 C -0.000000 2.598076 0.000000 0 M V30 13 C -0.750000 3.897114 0.000000 0 M V30 14 C 0.000000 5.196152 0.000000 0 M V30 15 R -0.750000 6.495191 0.000000 0 VAL=1 M V30 16 C 1.500000 5.196152 0.000000 0 M V30 17 C 0.750000 3.897114 0.000000 0 M V30 18 R -0.705424 4.260076 0.000000 0 VAL=1 M V30 19 C 1.500000 2.598076 0.000000 0 M V30 20 O 2.402755 1.400147 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 3 4 M V30 4 2 4 5 M V30 5 1 5 6 M V30 6 1 5 7 M V30 7 2 7 8 M V30 8 1 8 9 M V30 9 1 3 10 M V30 10 1 10 11 M V30 11 1 10 12 M V30 12 2 12 13 M V30 13 1 13 14 M V30 14 1 14 15 M V30 15 2 14 16 M V30 16 1 16 17 M V30 17 1 17 18 M V30 18 2 17 19 M V30 19 1 19 20 M V30 20 1 8 2 M V30 21 1 19 12 M V30 END BOND M V30 END CTAB M END
*C1=CC(*)=C(O)C(C(*)C2=C(O)C(*)=CC(*)=C2)=C1 |$R'';;;;R';;;;;R;;;;;R';;;R'';;$,|
*C1=CC(*)=C(O)C(C(*)C2=C(O)C(*)=CC(*)=C2)=C1 |$R'';;;;R';;;;;R;;;;;R';;;R'';;$,|
<r>R''</r>C1=CC(<r>R'</r>)=C(O)C(C(<r>R</r>)C2=C(O)C(<r>R'</r>)=CC(<r>R''</r>)=C2)=C1
null
[ { "bbox": [ 0.158203125, 0.3203125, 0.1826171875, 0.34375 ], "text": "R'" }, { "bbox": [ 0.2763671875, 0.2568359375, 0.3193359375, 0.27734375 ], "text": "O" }, { "bbox": [ 0.27734375, 0.5224609375, 0.30859375, 0.548828125 ], "text": "R''" }, { "bbox": [ 0.4033203125, 0.291015625, 0.419921875, 0.3134765625 ], "text": "R" }, { "bbox": [ 0.546875, 0.25390625, 0.58984375, 0.27734375 ], "text": "O" }, { "bbox": [ 0.6650390625, 0.3193359375, 0.6953125, 0.3447265625 ], "text": "R'" }, { "bbox": [ 0.546875, 0.525390625, 0.5771484375, 0.548828125 ], "text": "R''" }, { "bbox": [ 0.0439453125, 0.619140625, 0.953125, 0.6533203125 ], "text": "wherein R represents a hydrogen atom or an alkyl group" }, { "bbox": [ 0.0439453125, 0.6611328125, 0.9501953125, 0.6953125 ], "text": "having from 1 to 10 carbon atoms, and R' and R'' each" }, { "bbox": [ 0.0439453125, 0.7041015625, 0.953125, 0.7353515625 ], "text": "represents an alkyl group having from 1 to 5 carbon atoms." } ]
40
US6538013_36.png
<markush><cxsmi><r>R</r>C(=O)OC(<r>R2'</r>)(<r>R2</r>)OC(=O)N(<r>U</r>)/C(=C/N(=O)=O)N(<r>T</r>)<r>R1</r></cxsmi><stable>R:C1-C20alkyl<ns>T:hydrogen<n>methyl<n>ethyl<ns>U:hydrogen<n>methyl<n>ethyl<ns>R2:hydrogen<n>C1-C6alkyl<ns>R2':hydrogen<n>C1-C6alkyl</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 20 19 0 0 0 M V30 BEGIN ATOM M V30 1 R -2.250000 1.299038 0.000000 0 VAL=1 M V30 2 N -0.750000 1.299038 0.000000 0 M V30 3 R 0.000000 2.598076 0.000000 0 VAL=1 M V30 4 C 0.000000 0.000000 0.000000 0 M V30 5 C 1.500000 0.000000 0.000000 0 M V30 6 N 2.250000 1.299038 0.000000 0 M V30 7 O 3.750000 1.299038 0.000000 0 M V30 8 O 1.500000 2.598076 0.000000 0 M V30 9 N -0.750000 -1.299038 0.000000 0 M V30 10 R -2.250000 -1.299038 0.000000 0 VAL=1 M V30 11 C 0.000000 -2.598076 0.000000 0 M V30 12 O 1.500000 -2.598076 0.000000 0 M V30 13 O -0.750000 -3.897114 0.000000 0 M V30 14 C 0.000000 -5.196152 0.000000 0 M V30 15 R -1.299038 -5.946152 0.000000 0 VAL=1 M V30 16 R 1.299038 -4.446152 0.000000 0 VAL=1 M V30 17 O 0.750000 -6.495191 0.000000 0 M V30 18 C 2.250000 -6.495191 0.000000 0 M V30 19 R 3.000000 -7.794229 0.000000 0 VAL=1 M V30 20 O 3.000000 -5.196152 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 4 2 4 5 M V30 5 1 5 6 M V30 6 2 6 7 M V30 7 2 6 8 M V30 8 1 4 9 M V30 9 1 9 10 M V30 10 1 9 11 M V30 11 2 11 12 M V30 12 1 11 13 M V30 13 1 13 14 M V30 14 1 14 15 M V30 15 1 14 16 M V30 16 1 14 17 M V30 17 1 17 18 M V30 18 1 18 19 M V30 19 2 18 20 M V30 END BOND M V30 END CTAB M END
*C(=O)OC(*)(*)OC(=O)N(*)/C(=C/N(=O)=O)N(*)* |$R;;;;;R2';R2;;;;;U;;;;;;;T;R1$,|
*C(=O)OC(*)(*)OC(=O)N(*)/C(=C/N(=O)=O)N(*)* |$R;;;;;R2';R2;;;;;U;;;;;;;T;R1$,|
<r>R</r>C(=O)OC(<r>R2'</r>)(<r>R2</r>)OC(=O)N(<r>U</r>)/C(=C/N(=O)=O)N(<r>T</r>)<r>R1</r>
null
[ { "bbox": [ 0.2578125, 0.041015625, 0.30859375, 0.064453125 ], "text": "O2N" }, { "bbox": [ 0.2255859375, 0.130859375, 0.2509765625, 0.16015625 ], "text": "R1" }, { "bbox": [ 0.2890625, 0.1640625, 0.30859375, 0.185546875 ], "text": "N" }, { "bbox": [ 0.2880859375, 0.220703125, 0.3095703125, 0.24609375 ], "text": "T" }, { "bbox": [ 0.3935546875, 0.162109375, 0.4130859375, 0.185546875 ], "text": "N" }, { "bbox": [ 0.396484375, 0.22265625, 0.4130859375, 0.2431640625 ], "text": "U" }, { "bbox": [ 0.44921875, 0.0712890625, 0.4677734375, 0.091796875 ], "text": "O" }, { "bbox": [ 0.501953125, 0.1640625, 0.51953125, 0.1845703125 ], "text": "O" }, { "bbox": [ 0.5263671875, 0.080078125, 0.5517578125, 0.10546875 ], "text": "R2" }, { "bbox": [ 0.583984375, 0.0791015625, 0.6171875, 0.1064453125 ], "text": "R2'" }, { "bbox": [ 0.6064453125, 0.1640625, 0.6259765625, 0.181640625 ], "text": "O" }, { "bbox": [ 0.66015625, 0.0712890625, 0.6796875, 0.091796875 ], "text": "O" }, { "bbox": [ 0.7138671875, 0.1650390625, 0.73046875, 0.185546875 ], "text": "R" }, { "bbox": [ 0.0888671875, 0.4248046875, 0.197265625, 0.451171875 ], "text": "herein" }, { "bbox": [ 0.1220703125, 0.4716796875, 0.9111328125, 0.50390625 ], "text": "R, is—CH2—pyridyl, which is unsubstituted or mono- or" }, { "bbox": [ 0.154296875, 0.5087890625, 0.91015625, 0.5400390625 ], "text": "poly-substituted by identical or different halogen" }, { "bbox": [ 0.158203125, 0.5498046875, 0.2470703125, 0.578125 ], "text": "atoms;" }, { "bbox": [ 0.1220703125, 0.591796875, 0.9091796875, 0.6259765625 ], "text": "R is C1-C20alkyl, being unsubstituted or mono- or poly-" }, { "bbox": [ 0.154296875, 0.6298828125, 0.9072265625, 0.6611328125 ], "text": "substituted by identical or different substituents, the" }, { "bbox": [ 0.15625, 0.6669921875, 0.9091796875, 0.7001953125 ], "text": "said substLents being selected from the group halogen," }, { "bbox": [ 0.15625, 0.7080078125, 0.9091796875, 0.740234375 ], "text": "cyano, nitro, hydroxy, C1-C6alkoxy, C1-C6alkylthio," }, { "bbox": [ 0.15625, 0.7451171875, 0.8095703125, 0.77734375 ], "text": "C1-C6haloalkyl, C1-C6haloalkoxy and phenyl;" }, { "bbox": [ 0.1201171875, 0.7900390625, 0.91015625, 0.822265625 ], "text": "T and U are each independently of the other hydrogen," }, { "bbox": [ 0.154296875, 0.8291015625, 0.3798828125, 0.859375 ], "text": "methyl or ethyl;" }, { "bbox": [ 0.1240234375, 0.875, 0.6123046875, 0.90625 ], "text": "R2 is hydrogen or C1-C6alkyl; and" }, { "bbox": [ 0.1201171875, 0.9208984375, 0.546875, 0.951171875 ], "text": "R2'is hydrogen or C1-C6alkyl." } ]
41
US8076430B2_13_3.png
<markush><cxsmi><r>Y</r>SC1=C(<r>R5</r>)C(<r>R6</r>)=C(<r>R7</r>)C(<r>R8</r>)=C1<r>R4</r></cxsmi><stable>Y:hydrogen atom or an alkali metal<ns>R4:a C3-C8 alkyl group<n>an aryl group<n>a substituted aryl group<ns>R5:a C3-C8 alkyl group<n>an aryl group<n>a substituted aryl group<ns>R6:a hydrogen atom<n>a C1-C8 alkyl group<n>an aryl group<n>a substituted aryl group<ns>R7:a hydrogen atom<n>a C1-C8 alkyl group<n>an aryl group<n>a substituted aryl group<ns>R8:a hydrogen atom<n>a C1-C8 alkyl group<n>an aryl group<n>a substituted aryl group</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 13 13 0 0 0 M V30 BEGIN ATOM M V30 1 R 3.750000 1.299038 0.000000 0 VAL=1 M V30 2 S 2.250000 1.299038 0.000000 0 M V30 3 C 0.800000 0.000000 0.000000 0 M V30 4 C 0.350000 -0.606218 0.000000 0 M V30 5 R -1.042046 1.078954 0.000000 0 VAL=1 M V30 6 C -0.400000 -0.692820 0.000000 0 M V30 7 R -2.250000 -1.299038 0.000000 0 VAL=1 M V30 8 C -0.700000 0.000000 0.000000 0 M V30 9 R 0.051550 -0.126557 0.000000 0 VAL=1 M V30 10 C -0.400000 0.692820 0.000000 0 M V30 11 R -2.250000 1.299038 0.000000 0 VAL=1 M V30 12 C 0.350000 0.606218 0.000000 0 M V30 13 R -0.413378 -1.441915 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 2 3 4 M V30 4 1 4 5 M V30 5 1 4 6 M V30 6 1 6 7 M V30 7 2 6 8 M V30 8 1 8 9 M V30 9 1 8 10 M V30 10 1 10 11 M V30 11 2 10 12 M V30 12 1 12 13 M V30 13 1 12 3 M V30 END BOND M V30 END CTAB M END
*SC1=C(*)C(*)=C(*)C(*)=C1* |$Y;;;;R5;;R6;;R7;;R8;;R4$,|
*SC1=C(*)C(*)=C(*)C(*)=C1* |$Y;;;;R5;;R6;;R7;;R8;;R4$,|
<r>Y</r>SC1=C(<r>R5</r>)C(<r>R6</r>)=C(<r>R7</r>)C(<r>R8</r>)=C1<r>R4</r>
null
[ { "bbox": [ 0.298828125, 0.349609375, 0.318359375, 0.3779296875 ], "text": "Y" }, { "bbox": [ 0.369140625, 0.349609375, 0.384765625, 0.376953125 ], "text": "S" }, { "bbox": [ 0.4326171875, 0.2314453125, 0.462890625, 0.259765625 ], "text": "R5" }, { "bbox": [ 0.568359375, 0.2314453125, 0.59765625, 0.2578125 ], "text": "R6" }, { "bbox": [ 0.6376953125, 0.34765625, 0.6650390625, 0.3740234375 ], "text": "R7" }, { "bbox": [ 0.5654296875, 0.4638671875, 0.599609375, 0.4951171875 ], "text": "R8" }, { "bbox": [ 0.4326171875, 0.46484375, 0.4638671875, 0.4912109375 ], "text": "R4" }, { "bbox": [ 0.0439453125, 0.5595703125, 0.953125, 0.599609375 ], "text": "wherein Y represents a hydrogen atom or an alkali metal, R4" }, { "bbox": [ 0.04296875, 0.599609375, 0.955078125, 0.6396484375 ], "text": "and R5 each represent a C3-C8 alkyl group, an aryl group or" }, { "bbox": [ 0.0439453125, 0.6455078125, 0.94921875, 0.6796875 ], "text": "a substituted aryl group, and R6 to R8 each represent a hydro-" }, { "bbox": [ 0.0439453125, 0.689453125, 0.955078125, 0.7236328125 ], "text": "gen atom, a C1-C8 alkyl group, an aryl group or a substituted" }, { "bbox": [ 0.0439453125, 0.7314453125, 0.2080078125, 0.767578125 ], "text": "aryl group," } ]
42
US9372402B2_19.png
<markush><cxsmi><r>R1</r>C.<r>R2</r>C.C1=CN=C(C2=NC=CC=C2)C=C1|m:1:4.5.6.7.14.15,m:3:8.9.10.11.12.13</cxsmi><stable>R1:one substituent<n>two substituent<n>three substituent<ns>R2:one substituent<n>two substituent<n>three substituent</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 16 15 0 0 0 M V30 BEGIN ATOM M V30 1 C 1.299038 3.049038 0.000000 0 M V30 2 R 0.000000 2.299038 0.000000 0 VAL=1 M V30 3 C 1.299038 4.799038 0.000000 0 M V30 4 R 0.000000 4.049038 0.000000 0 VAL=1 M V30 5 C 1.500000 0.000000 0.000000 0 M V30 6 C 0.750000 -1.299038 0.000000 0 M V30 7 N -0.750000 -1.299038 0.000000 0 M V30 8 C -0.000000 -0.000000 0.000000 0 M V30 9 C -0.750000 1.299038 0.000000 0 M V30 10 C 0.750000 1.299038 0.000000 0 M V30 11 C 1.500000 -0.000000 0.000000 0 M V30 12 N 2.250000 -1.299038 0.000000 0 M V30 13 C 3.750000 -1.299038 0.000000 0 M V30 14 C 4.500000 -0.000000 0.000000 0 M V30 15 C 3.750000 1.299038 0.000000 0 M V30 16 C 2.250000 1.299038 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 ENDPTS=(6 5 6 10 7 8 9) ATTACH=ANY M V30 2 1 3 4 ENDPTS=(6 16 11 12 13 15 14) ATTACH=ANY M V30 3 2 5 6 M V30 4 1 6 7 M V30 5 2 7 8 M V30 6 1 8 9 M V30 7 2 9 10 M V30 8 1 8 11 M V30 9 2 11 12 M V30 10 1 12 13 M V30 11 2 13 14 M V30 12 1 14 15 M V30 13 2 15 16 M V30 14 1 10 5 M V30 15 1 16 11 M V30 END BOND M V30 END CTAB M END
*C.*C.C1=CN=C(C2=NC=CC=C2)C=C1 |$R1;;R2;;;;;;;;;;;;;$,m:1:4.5.15.6.7.14,m:3:13.8.9.10.12.11|
*C.*C.C1=CN=C(C2=NC=CC=C2)C=C1 |$R1;;R2;;;;;;;;;;;;;$,m:1:4.5.15.6.7.14,m:3:13.8.9.10.12.11|
<r>R1</r>C.<r>R2</r>C.C1=CN=C(C2=NC=CC=C2)C=C1|m:1:4.5.6.7.14.15,m:3:8.9.10.11.12.13
null
[ { "bbox": [ 0.0849609375, 0.181640625, 0.11328125, 0.208984375 ], "text": "R1" }, { "bbox": [ 0.2177734375, 0.2958984375, 0.23828125, 0.3193359375 ], "text": "N" }, { "bbox": [ 0.3583984375, 0.2958984375, 0.376953125, 0.3193359375 ], "text": "N" }, { "bbox": [ 0.482421875, 0.1796875, 0.513671875, 0.208984375 ], "text": "R2" }, { "bbox": [ 0.0439453125, 0.5, 0.9599609375, 0.5400390625 ], "text": "R1 and R2 each represent one, two or three substituents and" }, { "bbox": [ 0.0830078125, 0.5498046875, 0.9560546875, 0.5859375 ], "text": "are each independently selected from hydrogen, halo-" }, { "bbox": [ 0.0849609375, 0.59765625, 0.9560546875, 0.6337890625 ], "text": "gen, (C1-4)alkoxy, hydroxyl, nitro, amino, cyano, and" }, { "bbox": [ 0.0859375, 0.6396484375, 0.953125, 0.6826171875 ], "text": "(C1-6)alkyl optionally substituted with halogen," }, { "bbox": [ 0.0810546875, 0.6904296875, 0.953125, 0.728515625 ], "text": "hydroxyl, nitro, amino, cyano, and phenyl, wherein the" }, { "bbox": [ 0.0810546875, 0.734375, 0.953125, 0.7744140625 ], "text": "phenyl may be optionally substituted with (C1-6)alkyl," }, { "bbox": [ 0.0810546875, 0.78125, 0.7744140625, 0.81640625 ], "text": "halogen, hydroxyl, nitro, amino, and cyano;" } ]
43
US20210149301A1_106.png
<markush><cxsmi>*<r>R21</r>.<r>RA</r>C(C)(<r>YA</r>C1=CC=CC=C1)C([H])([H])C.*O|Sg:n:17:b:ht,Sg:n:1:c:ht,Sg:n:13,12,14,3,2,5,6,7,8,9,10,11: :ht,m:16:6.7.8.9.10.11,m:0:6.7.8.9.10.11</cxsmi><stable>RA:hydrogen<n>methyl<ns>YA:a single bond<n>a ester bond<ns>R21:fluorine<n>iodine<n>a C1-C10 hydrocarbyl group<ns>b:1-5<ns>c:0-4</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 18 16 3 0 0 M V30 BEGIN ATOM M V30 1 H 4.299038 0.750000 0.000000 0 M V30 2 C 5.049038 -0.549038 0.000000 0 M V30 3 H 5.799038 -1.848076 0.000000 0 M V30 4 C 6.348076 0.200962 0.000000 0 M V30 5 C 3.750000 -1.299038 0.000000 0 M V30 6 C 2.450962 -2.049038 0.000000 0 M V30 7 R 4.500000 -2.598076 0.000000 0 VAL=1 M V30 8 R 3.000000 0.000000 0.000000 0 VAL=2 M V30 9 C 1.500000 0.000000 0.000000 0 M V30 10 C 0.750000 -1.299038 0.000000 0 M V30 11 C -0.750000 -1.299038 0.000000 0 M V30 12 C -1.500000 0.000000 0.000000 0 M V30 13 C -0.750000 1.299038 0.000000 0 M V30 14 C 0.750000 1.299038 0.000000 0 M V30 15 A 0.000000 2.299038 0.000000 0 M V30 16 O 1.299038 3.049038 0.000000 0 M V30 17 A 0.000000 4.049038 0.000000 0 M V30 18 C 1.299038 4.799038 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 4 1 2 5 M V30 5 1 5 6 M V30 6 1 5 7 M V30 7 1 5 8 M V30 8 1 8 9 M V30 9 2 9 10 M V30 10 1 10 11 M V30 11 2 11 12 M V30 12 1 12 13 M V30 13 2 13 14 M V30 14 1 15 16 ENDPTS=(6 9 10 11 12 13 14) ATTACH=ANY M V30 15 1 17 18 ENDPTS=(6 9 10 11 12 13 14) ATTACH=ANY M V30 16 1 14 9 M V30 END BOND M V30 BEGIN SGROUP M V30 1 SRU 0 ATOMS=(1 16) XBONDS=(1 14) XBHEAD=(1 14) CONNECT=HT LABEL=b M V30 2 SRU 0 ATOMS=(1 18) XBONDS=(1 15) XBHEAD=(1 15) CONNECT=HT LABEL=c M V30 3 SRU 0 ATOMS=(12 1 2 3 5 7 8 9 10 11 12 13 14) CONNECT=HT M V30 END SGROUP M V30 END CTAB M END
*C.*C(C)(*C1=CC=CC=C1)C([H])([H])C.*O |$;R21;RA;;;YA;;;;;;;;;;;;$,,,,Sg:n:17:b:ht:::,Sg:n:1:c:ht:::,Sg:n:13,12,14,3,2,5,6,7,8,9,10,11: :ht:::,m:16:6.7.8.9.10.11,m:0:6.7.8.9.10.11|
*C.*C(C)(*C1=CC=CC=C1)C([H])([H])C.*O |$;R21;RA;;;YA;;;;;;;;;;;;$,,,,Sg:n:17:b:ht:::,Sg:n:1:c:ht:::,Sg:n:13,12,14,3,2,5,6,7,8,9,10,11: :ht:::,m:16:6.7.8.9.10.11,m:0:6.7.8.9.10.11|
*<r>R21</r>.<r>RA</r>C(C)(<r>YA</r>C1=CC=CC=C1)C([H])([H])C.*O|Sg:n:17:b:ht,Sg:n:1:c:ht,Sg:n:13,12,14,3,2,5,6,7,8,9,10,11: :ht,m:16:6.7.8.9.10.11,m:0:6.7.8.9.10.11
null
[ { "bbox": [ 0.3720703125, 0.181640625, 0.388671875, 0.205078125 ], "text": "H" }, { "bbox": [ 0.3671875, 0.2998046875, 0.3896484375, 0.32421875 ], "text": "H" }, { "bbox": [ 0.5029296875, 0.1796875, 0.537109375, 0.203125 ], "text": "RA" }, { "bbox": [ 0.5009765625, 0.296875, 0.537109375, 0.322265625 ], "text": "YA" }, { "bbox": [ 0.357421875, 0.4306640625, 0.39453125, 0.4599609375 ], "text": "R2" }, { "bbox": [ 0.408203125, 0.44921875, 0.41796875, 0.46484375 ], "text": "c" }, { "bbox": [ 0.556640625, 0.521484375, 0.5986328125, 0.5478515625 ], "text": "O" }, { "bbox": [ 0.611328125, 0.529296875, 0.62109375, 0.552734375 ], "text": "b" }, { "bbox": [ 0.04296875, 0.619140625, 0.953125, 0.658203125 ], "text": "wherein RA is hydrogen or methyl, YA is a single bond or" }, { "bbox": [ 0.041015625, 0.6611328125, 0.953125, 0.6953125 ], "text": "ester bond, R21 is fluorine, iodine or a C1-C10 hydrocarbyl" }, { "bbox": [ 0.0439453125, 0.703125, 0.953125, 0.740234375 ], "text": "group in which —CH2— may be replaced by an ether bond" }, { "bbox": [ 0.0439453125, 0.7412109375, 0.955078125, 0.7763671875 ], "text": "or carbonyl moiety, b is an integer of 1 to 5, c is an integer" }, { "bbox": [ 0.0439453125, 0.7861328125, 0.4775390625, 0.81640625 ], "text": "of 0 to 4, and b+c is 1 to 5." } ]
44
WO2002010163A1_30.png
<markush><cxsmi><r>R1</r>C1=C(<r>R</r>)OC(C(<r>L</r>)(<r>R2</r>)<r>R3</r>)=N1</cxsmi><stable>R:as described hereinabove<ns>R1:as described hereinabove<ns>R2:as described hereinabove<ns>R3:as described hereinabove<ns>L:halogen<n>sulfonate</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 11 11 0 0 0 M V30 BEGIN ATOM M V30 1 R -1.987380 0.000000 0.000000 0 VAL=1 M V30 2 C -0.487380 0.000000 0.000000 0 M V30 3 C 0.394298 1.213525 0.000000 0 M V30 4 R 1.607824 2.095203 0.000000 0 VAL=1 M V30 5 N 0.394298 -0.286475 0.000000 0 M V30 6 C -1.032286 -0.750000 0.000000 0 M V30 7 O 0.394298 -1.213525 0.000000 0 M V30 8 C -2.245812 -1.631678 0.000000 0 M V30 9 R -3.127490 -0.418152 0.000000 0 VAL=1 M V30 10 R -1.364134 -2.845203 0.000000 0 VAL=1 M V30 11 R -3.459337 -2.513356 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 3 4 M V30 4 1 3 5 M V30 5 2 5 6 M V30 6 1 6 7 M V30 7 1 6 8 M V30 8 1 8 9 M V30 9 1 8 10 M V30 10 1 8 11 M V30 11 1 7 2 M V30 END BOND M V30 END CTAB M END
*C1=C(*)OC(C(*)(*)*)=N1 |$R1;;;R;;;;L;R2;R3;$,|
*C1=C(*)OC(C(*)(*)*)=N1 |$R1;;;R;;;;L;R2;R3;$,|
<r>R1</r>C1=C(<r>R</r>)OC(C(<r>L</r>)(<r>R2</r>)<r>R3</r>)=N1
null
[ { "bbox": [ 0.5849609375, 0.2275390625, 0.6201171875, 0.263671875 ], "text": "R1" }, { "bbox": [ 0.5849609375, 0.359375, 0.6103515625, 0.3876953125 ], "text": "R" }, { "bbox": [ 0.6806640625, 0.3408203125, 0.708984375, 0.369140625 ], "text": "O" }, { "bbox": [ 0.6884765625, 0.25390625, 0.708984375, 0.279296875 ], "text": "N" }, { "bbox": [ 0.7724609375, 0.34765625, 0.8095703125, 0.3828125 ], "text": "R2" }, { "bbox": [ 0.8212890625, 0.318359375, 0.859375, 0.35546875 ], "text": "R3" }, { "bbox": [ 0.8037109375, 0.24609375, 0.82421875, 0.2763671875 ], "text": "L" }, { "bbox": [ 0.0439453125, 0.5166015625, 0.1982421875, 0.5546875 ], "text": "wherein:" }, { "bbox": [ 0.0439453125, 0.6142578125, 0.94921875, 0.66015625 ], "text": "R, R1, R2 and R3 are as described hereinabove; and" }, { "bbox": [ 0.0439453125, 0.7265625, 0.4990234375, 0.7685546875 ], "text": "L is halogen or sulfonate;" } ]
45
US9029365_37_c.png
<markush><cxsmi><r>R2</r>C1=CC(C(=O)N(<r>R4a</r>)<r>R4b</r>)=C(NC(=O)C2=CC(<r>R3</r>)=NN2C2=C(<r>R5</r>)C=CC=N2)C(<r>R1</r>)=C1</cxsmi><stable>R1:CH3<n>F<n>Cl<n>Br<ns>R2:F<n>Cl<n>Br<n>I<n>CF3<ns>R3:CF3<n>Cl<n>Br<n>OCH2CF3<ns>R4a:C1-C4 alkyl<ns>R4b:H<n>CH3<ns>R5:Cl<n>Br</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 29 31 0 0 0 M V30 BEGIN ATOM M V30 1 R 5.250000 -1.299038 0.000000 0 VAL=1 M V30 2 N 3.750000 -1.299038 0.000000 0 M V30 3 R 3.000000 -2.598076 0.000000 0 VAL=1 M V30 4 C 3.000000 0.000000 0.000000 0 M V30 5 O 3.750000 1.299038 0.000000 0 M V30 6 C 1.500000 0.000000 0.000000 0 M V30 7 C -0.000000 0.000000 0.000000 0 M V30 8 N -0.750000 1.299038 0.000000 0 M V30 9 C -0.000000 2.598076 0.000000 0 M V30 10 O 1.500000 2.598076 0.000000 0 M V30 11 C -0.750000 3.897114 0.000000 0 M V30 12 C -2.241783 4.053907 0.000000 0 M V30 13 C -2.553650 5.521128 0.000000 0 M V30 14 R -3.923969 6.131233 0.000000 0 VAL=1 M V30 15 N -1.254612 6.271128 0.000000 0 M V30 16 N -0.139895 5.267433 0.000000 0 M V30 17 C 1.327326 5.579300 0.000000 0 M V30 18 C 1.790852 7.005885 0.000000 0 M V30 19 R 2.254377 8.432470 0.000000 0 VAL=1 M V30 20 C 0.323630 6.694017 0.000000 0 M V30 21 C -0.139895 5.267433 0.000000 0 M V30 22 C 0.863801 4.152715 0.000000 0 M V30 23 N 2.331022 4.464583 0.000000 0 M V30 24 C -0.750000 -1.299038 0.000000 0 M V30 25 R -0.000000 -2.598076 0.000000 0 VAL=1 M V30 26 C -1.500000 0.000000 0.000000 0 M V30 27 C -0.750000 1.299038 0.000000 0 M V30 28 R -1.500000 2.598076 0.000000 0 VAL=1 M V30 29 C 0.750000 1.299038 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 4 2 4 5 M V30 5 1 4 6 M V30 6 2 6 7 M V30 7 1 7 8 M V30 8 1 8 9 M V30 9 2 9 10 M V30 10 1 9 11 M V30 11 2 11 12 M V30 12 1 12 13 M V30 13 1 13 14 M V30 14 2 13 15 M V30 15 1 15 16 M V30 16 1 16 17 M V30 17 2 17 18 M V30 18 1 18 19 M V30 19 1 18 20 M V30 20 2 20 21 M V30 21 1 21 22 M V30 22 2 22 23 M V30 23 1 7 24 M V30 24 1 24 25 M V30 25 2 24 26 M V30 26 1 26 27 M V30 27 1 27 28 M V30 28 2 27 29 M V30 29 1 29 6 M V30 30 1 16 11 M V30 31 1 23 17 M V30 END BOND M V30 END CTAB M END
*C1=CC(C(=O)N(*)*)=C(NC(=O)C2=CC(*)=NN2C2=C(*)C=CC=N2)C(*)=C1 |$R2;;;;;;;R4a;R4b;;;;;;;;R3;;;;;R5;;;;;;R1;$,|
*C1=CC(C(=O)N(*)*)=C(NC(=O)C2=CC(*)=NN2C2=C(*)C=CC=N2)C(*)=C1 |$R2;;;;;;;R4a;R4b;;;;;;;;R3;;;;;R5;;;;;;R1;$,|
<r>R2</r>C1=CC(C(=O)N(<r>R4a</r>)<r>R4b</r>)=C(NC(=O)C2=CC(<r>R3</r>)=NN2C2=C(<r>R5</r>)C=CC=N2)C(<r>R1</r>)=C1
null
[ { "bbox": [ 0.248046875, 0.54296875, 0.2890625, 0.58203125 ], "text": "R2" }, { "bbox": [ 0.408203125, 0.28125, 0.447265625, 0.3154296875 ], "text": "R1" }, { "bbox": [ 0.5625, 0.548828125, 0.775390625, 0.5859375 ], "text": "C(O)NR4aR4b" }, { "bbox": [ 0.560546875, 0.375, 0.6171875, 0.4072265625 ], "text": "N" }, { "bbox": [ 0.482421875, 0.240234375, 0.513671875, 0.26953125 ], "text": "O" }, { "bbox": [ 0.7685546875, 0.0439453125, 0.8037109375, 0.076171875 ], "text": "R3" }, { "bbox": [ 0.7734375, 0.1953125, 0.8017578125, 0.2255859375 ], "text": "N" }, { "bbox": [ 0.7216796875, 0.2646484375, 0.748046875, 0.296875 ], "text": "N" }, { "bbox": [ 0.720703125, 0.419921875, 0.75, 0.45703125 ], "text": "N" }, { "bbox": [ 0.8994140625, 0.2578125, 0.939453125, 0.296875 ], "text": "R5" }, { "bbox": [ 0.0576171875, 0.6318359375, 0.5, 0.6865234375 ], "text": "R1 is CH3, F, Cl or Br;" }, { "bbox": [ 0.0556640625, 0.6943359375, 0.5322265625, 0.744140625 ], "text": "R2 is F, Cl, Br, I or CF3;" }, { "bbox": [ 0.0576171875, 0.7490234375, 0.6728515625, 0.798828125 ], "text": "R3 is CF3, Cl, Br or OCH2CF3;" }, { "bbox": [ 0.05859375, 0.8046875, 0.4267578125, 0.8544921875 ], "text": "R4a is C1-C4 alkyl;" }, { "bbox": [ 0.05859375, 0.8583984375, 0.470703125, 0.9072265625 ], "text": "R4b is H or CH3; and" }, { "bbox": [ 0.05859375, 0.9140625, 0.3310546875, 0.9560546875 ], "text": "R5 is Cl or Br." } ]
46
US9372402B2_19_2.png
<markush><cxsmi><r>R1</r>C.<r>R2</r>C.OC1=CC=CC=C1/C=N/CC/N=C\C1=C(O)C=CC=C1|m:1:5.6.7.8.9.10,m:3:17.18.20.21.22.23</cxsmi><stable>R1:one substituent<n>two substituent<n>three substituent<ns>R2:one substituent<n>two substituent<n>three substituent</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 24 23 0 0 0 M V30 BEGIN ATOM M V30 1 O 2.250000 1.299038 0.000000 0 M V30 2 C 1.500000 0.000000 0.000000 0 M V30 3 C 0.750000 -1.299038 0.000000 0 M V30 4 C -0.750000 -1.299038 0.000000 0 M V30 5 C -1.500000 0.000000 0.000000 0 M V30 6 C -0.750000 1.299038 0.000000 0 M V30 7 C 0.000000 0.000000 0.000000 0 M V30 8 C -0.750000 -1.299038 0.000000 0 M V30 9 N -2.250000 -1.299038 0.000000 0 M V30 10 C -3.000000 -2.598076 0.000000 0 M V30 11 C -4.500000 -2.598076 0.000000 0 M V30 12 N -5.250000 -3.897114 0.000000 0 M V30 13 C -6.750000 -3.897114 0.000000 0 M V30 14 C -7.500000 -2.598076 0.000000 0 M V30 15 C -9.000000 -2.598076 0.000000 0 M V30 16 O -10.500000 -2.598076 0.000000 0 M V30 17 C -8.250000 -3.897114 0.000000 0 M V30 18 C -6.750000 -3.897114 0.000000 0 M V30 19 C -6.000000 -2.598076 0.000000 0 M V30 20 C -6.750000 -1.299038 0.000000 0 M V30 21 C 1.299038 3.049038 0.000000 0 M V30 22 R 0.000000 2.299038 0.000000 0 VAL=1 M V30 23 C 1.299038 4.799038 0.000000 0 M V30 24 R 0.000000 4.049038 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 3 4 M V30 4 2 4 5 M V30 5 1 5 6 M V30 6 2 6 7 M V30 7 1 7 8 M V30 8 2 8 9 M V30 9 1 9 10 M V30 10 1 10 11 M V30 11 1 11 12 M V30 12 2 12 13 M V30 13 1 13 14 M V30 14 2 14 15 M V30 15 1 15 16 M V30 16 1 15 17 M V30 17 2 17 18 M V30 18 1 18 19 M V30 19 2 19 20 M V30 20 1 21 22 ENDPTS=(6 4 5 3 6 7 2) ATTACH=ANY M V30 21 1 23 24 ENDPTS=(6 17 15 18 19 20 14) ATTACH=ANY M V30 22 1 7 2 M V30 23 1 20 14 M V30 END BOND M V30 END CTAB M END
*C.*C.OC1=CC=CC=C1/C=N/CC/N=C\C1=C(O)C=CC=C1 |$R1;;R2;;;;;;;;;;;;;;;;;;;;;$,m:1:7.8.6.9.10.5,m:3:20.18.21.22.23.17|
*C.*C.OC1=CC=CC=C1/C=N/CC/N=C\C1=C(O)C=CC=C1 |$R1;;R2;;;;;;;;;;;;;;;;;;;;;$,m:1:7.8.6.9.10.5,m:3:20.18.21.22.23.17|
<r>R1</r>C.<r>R2</r>C.OC1=CC=CC=C1/C=N/CC/N=C\C1=C(O)C=CC=C1|m:1:5.6.7.8.9.10,m:3:17.18.20.21.22.23
null
[ { "bbox": [ 0.0927734375, 0.0947265625, 0.1220703125, 0.1220703125 ], "text": "R1" }, { "bbox": [ 0.26171875, 0.2529296875, 0.30859375, 0.2802734375 ], "text": "O" }, { "bbox": [ 0.30859375, 0.0927734375, 0.3291015625, 0.1142578125 ], "text": "N" }, { "bbox": [ 0.4462890625, 0.0927734375, 0.4697265625, 0.1162109375 ], "text": "N" }, { "bbox": [ 0.4658203125, 0.2529296875, 0.509765625, 0.2783203125 ], "text": "O" }, { "bbox": [ 0.6611328125, 0.0888671875, 0.6923828125, 0.1201171875 ], "text": "R2" }, { "bbox": [ 0.0546875, 0.6396484375, 0.9423828125, 0.681640625 ], "text": "R1 and R2 each represent one, two or three substituents and" }, { "bbox": [ 0.0927734375, 0.6904296875, 0.9423828125, 0.724609375 ], "text": "are each independently selected from hydrogen, halo-" }, { "bbox": [ 0.0927734375, 0.7392578125, 0.9423828125, 0.7744140625 ], "text": "gen, (C1-4)alkoxy, hydroxyl, nitro, amino, cyano, and" }, { "bbox": [ 0.0927734375, 0.78125, 0.9423828125, 0.8173828125 ], "text": "(C1-6)alkyl optionally substituted with halogen," }, { "bbox": [ 0.0927734375, 0.8271484375, 0.943359375, 0.86328125 ], "text": "hydroxyl, nitro, amino, cyano, and phenyl, wherein the" }, { "bbox": [ 0.0927734375, 0.8740234375, 0.9404296875, 0.9111328125 ], "text": "phenyl may be optionally substituted with (C1-6)alkyl," }, { "bbox": [ 0.0908203125, 0.916015625, 0.76953125, 0.953125 ], "text": "halogen, hydroxyl, nitro, amino, and cyano;" } ]
47
US20220213127A1_51.png
<markush><cxsmi><r>R32</r>C1=C(<r>R31</r>)C2=C(C(<r>R34</r>)=C1<r>R33</r>)N(<r>R1</r>)C1=C3B2C2=C(C4=C(<r>Y3</r>C5=C4<r>Z4</r>=<r>Z3</r><r>Z2</r>=<r>Z1</r>5)C=C2)N(<r>R1</r>)C3=C(<r>R36</r>)C(<r>R35</r>)=C1<r>R37</r></cxsmi><stable>R31:hydrogen<n>deuterium<n>C1 to C10 alkyl group unsubstituted or substituted with deuterium<n>C6 to C30 arylamine group unsubstituted or substituted with deuterium or C1 to C10 alkyl<n>C6 to C30 aryl group unsubstituted or substituted with deuterium or C1 to C10 alkyl<n>C5 to C30 heteroaryl group unsubstituted or substituted with deuterium or C1 to C10 alkyl<ns>R32:hydrogen<n>deuterium<n>C1 to C10 alkyl group unsubstituted or substituted with deuterium<n>C6 to C30 arylamine group unsubstituted or substituted with deuterium or C1 to C10 alkyl<n>C6 to C30 aryl group unsubstituted or substituted with deuterium or C1 to C10 alkyl<n>C5 to C30 heteroaryl group unsubstituted or substituted with deuterium or C1 to C10 alkyl<ns>R33:hydrogen<n>deuterium<n>C1 to C10 alkyl group unsubstituted or substituted with deuterium<n>C6 to C30 arylamine group unsubstituted or substituted with deuterium or C1 to C10 alkyl<n>C6 to C30 aryl group unsubstituted or substituted with deuterium or C1 to C10 alkyl<n>C5 to C30 heteroaryl group unsubstituted or substituted with deuterium or C1 to C10 alkyl<ns>R34:hydrogen<n>deuterium<n>C1 to C10 alkyl group unsubstituted or substituted with deuterium<n>C6 to C30 arylamine group unsubstituted or substituted with deuterium or C1 to C10 alkyl<n>C6 to C30 aryl group unsubstituted or substituted with deuterium or C1 to C10 alkyl<n>C5 to C30 heteroaryl group unsubstituted or substituted with deuterium or C1 to C10 alkyl<ns>R35:hydrogen<n>deuterium<n>C1 to C10 alkyl group unsubstituted or substituted with deuterium<n>C6 to C30 arylamine group unsubstituted or substituted with deuterium or C1 to C10 alkyl<n>C6 to C30 aryl group unsubstituted or substituted with deuterium or C1 to C10 alkyl<n>C5 to C30 heteroaryl group unsubstituted or substituted with deuterium or C1 to C10 alkyl<ns>R36:hydrogen<n>deuterium<n>C1 to C10 alkyl group unsubstituted or substituted with deuterium<n>C6 to C30 arylamine group unsubstituted or substituted with deuterium or C1 to C10 alkyl<n>C6 to C30 aryl group unsubstituted or substituted with deuterium or C1 to C10 alkyl<n>C5 to C30 heteroaryl group unsubstituted or substituted with deuterium or C1 to C10 alkyl<ns>R37:hydrogen<n>deuterium<n>C1 to C10 alkyl group unsubstituted or substituted with deuterium<n>C6 to C30 arylamine group unsubstituted or substituted with deuterium or C1 to C10 alkyl<n>C6 to C30 aryl group unsubstituted or substituted with deuterium or C1 to C10 alkyl<n>C5 to C30 heteroaryl group unsubstituted or substituted with deuterium or C1 to C10 alkyl</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 37 43 0 0 0 M V30 BEGIN ATOM M V30 1 R -1.370318 -2.373461 0.000000 0 VAL=1 M V30 2 N -0.000000 -2.983566 0.000000 0 M V30 3 C 1.213525 -2.101888 0.000000 0 M V30 4 C 1.370318 -3.593671 0.000000 0 M V30 5 C 2.583844 -2.711993 0.000000 0 M V30 6 C 2.427051 -1.220210 0.000000 0 M V30 7 C 1.213525 -2.101888 0.000000 0 M V30 8 C -0.156793 -1.491783 0.000000 0 M V30 9 C -0.000000 -0.000000 0.000000 0 M V30 10 C 0.750000 -1.299038 0.000000 0 M V30 11 R -0.253696 -2.413755 0.000000 0 VAL=2 M V30 12 R 1.500000 0.000000 0.000000 0 VAL=3 M V30 13 R 0.750000 1.299038 0.000000 0 VAL=3 M V30 14 R -0.750000 1.299038 0.000000 0 VAL=3 M V30 15 R -1.500000 0.000000 0.000000 0 VAL=3 M V30 16 B 2.740636 -4.203776 0.000000 0 M V30 17 C 2.897429 -5.695558 0.000000 0 M V30 18 C 4.267747 -6.305663 0.000000 0 M V30 19 N 3.054222 -7.187341 0.000000 0 M V30 20 R 1.957219 -8.210368 0.000000 0 VAL=1 M V30 21 C 2.897429 -5.695558 0.000000 0 M V30 22 C 1.527111 -5.085453 0.000000 0 M V30 23 C 0.156793 -4.475349 0.000000 0 M V30 24 C 4.297800 -5.158007 0.000000 0 M V30 25 R 5.463519 -6.101987 0.000000 0 VAL=1 M V30 26 C 2.897429 -5.695558 0.000000 0 M V30 27 R 2.311258 -7.076284 0.000000 0 VAL=1 M V30 28 C 1.731710 -4.751578 0.000000 0 M V30 29 R 0.331339 -5.289130 0.000000 0 VAL=1 M V30 30 C 2.897429 -5.695558 0.000000 0 M V30 31 R 1.506623 -6.257393 0.000000 0 VAL=1 M V30 32 C 2.740636 -4.203776 0.000000 0 M V30 33 R 3.954162 -3.322098 0.000000 0 VAL=1 M V30 34 C 2.897429 -5.695558 0.000000 0 M V30 35 R 4.374655 -5.955951 0.000000 0 VAL=1 M V30 36 C 1.683904 -6.577236 0.000000 0 M V30 37 R 1.657685 -8.077007 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 2 3 4 M V30 4 1 4 5 M V30 5 2 5 6 M V30 6 1 6 7 M V30 7 2 7 8 M V30 8 1 8 9 M V30 9 2 9 10 M V30 10 1 10 11 M V30 11 1 10 12 M V30 12 2 12 13 M V30 13 1 13 14 M V30 14 2 14 15 M V30 15 1 4 16 M V30 16 1 16 17 M V30 17 2 17 18 M V30 18 1 18 19 M V30 19 1 19 20 M V30 20 1 19 21 M V30 21 2 21 22 M V30 22 1 22 23 M V30 23 2 23 24 M V30 24 1 24 25 M V30 25 1 24 26 M V30 26 1 26 27 M V30 27 2 26 28 M V30 28 1 28 29 M V30 29 1 18 30 M V30 30 1 30 31 M V30 31 2 30 32 M V30 32 1 32 33 M V30 33 1 32 34 M V30 34 1 34 35 M V30 35 2 34 36 M V30 36 1 36 37 M V30 37 1 23 2 M V30 38 1 8 3 M V30 39 1 15 9 M V30 40 1 22 16 M V30 41 1 11 7 M V30 42 1 36 17 M V30 43 1 28 21 M V30 END BOND M V30 END CTAB M END
*C1=C(*)C2=C(C(*)=C1*)N(*)C1=C3B2C2=C(C4=C(*C5=C4*=**=*5)C=C2)N(*)C3=C(*)C(*)=C1* |$R32;;;R31;;;;R34;;R33;;R1;;;;;;;;Y3;;;Z4;Z3;Z2;Z1;;;;R1;;;R36;;R35;;R37$,|
*C1=C(*)C2=C(C(*)=C1*)N(*)C1=C3B2C2=C(C4=C(*C5=C4*=**=*5)C=C2)N(*)C3=C(*)C(*)=C1* |$R32;;;R31;;;;R34;;R33;;R1;;;;;;;;Y3;;;Z4;Z3;Z2;Z1;;;;R1;;;R36;;R35;;R37$,|
<r>R32</r>C1=C(<r>R31</r>)C2=C(C(<r>R34</r>)=C1<r>R33</r>)N(<r>R1</r>)C1=C3B2C2=C(C4=C(<r>Y3</r>C5=C4<r>Z4</r>=<r>Z3</r><r>Z2</r>=<r>Z1</r>5)C=C2)N(<r>R1</r>)C3=C(<r>R36</r>)C(<r>R35</r>)=C1<r>R37</r>
null
[ { "bbox": [ 0.216796875, 0.0927734375, 0.2509765625, 0.1181640625 ], "text": "R33" }, { "bbox": [ 0.3291015625, 0.04296875, 0.3623046875, 0.064453125 ], "text": "R32" }, { "bbox": [ 0.216796875, 0.2001953125, 0.2490234375, 0.2255859375 ], "text": "R34" }, { "bbox": [ 0.419921875, 0.0966796875, 0.4521484375, 0.119140625 ], "text": "R31" }, { "bbox": [ 0.3291015625, 0.251953125, 0.3447265625, 0.275390625 ], "text": "N" }, { "bbox": [ 0.26953125, 0.283203125, 0.29296875, 0.3037109375 ], "text": "R1" }, { "bbox": [ 0.30859375, 0.361328125, 0.341796875, 0.3837890625 ], "text": "R37" }, { "bbox": [ 0.419921875, 0.19921875, 0.4384765625, 0.2236328125 ], "text": "B" }, { "bbox": [ 0.421875, 0.4111328125, 0.4560546875, 0.4404296875 ], "text": "R35" }, { "bbox": [ 0.513671875, 0.359375, 0.5498046875, 0.3837890625 ], "text": "R36" }, { "bbox": [ 0.513671875, 0.2578125, 0.529296875, 0.2734375 ], "text": "N" }, { "bbox": [ 0.5615234375, 0.28125, 0.583984375, 0.3037109375 ], "text": "R1" }, { "bbox": [ 0.61328125, 0.1044921875, 0.6357421875, 0.126953125 ], "text": "Y3" }, { "bbox": [ 0.630859375, 0.236328125, 0.6552734375, 0.26171875 ], "text": "Z4" }, { "bbox": [ 0.6875, 0.244140625, 0.7109375, 0.2685546875 ], "text": "Z3" }, { "bbox": [ 0.720703125, 0.2001953125, 0.7431640625, 0.228515625 ], "text": "Z2" }, { "bbox": [ 0.69921875, 0.154296875, 0.720703125, 0.1767578125 ], "text": "Z1" }, { "bbox": [ 0.1513671875, 0.5048828125, 0.8447265625, 0.533203125 ], "text": "wherein in the Formulas 4-2 to 4-4, one of Z1 to Z4 is N," }, { "bbox": [ 0.1806640625, 0.5390625, 0.5556640625, 0.5693359375 ], "text": "and three of Z1 to Z4 are CR4," }, { "bbox": [ 0.15234375, 0.58203125, 0.84765625, 0.609375 ], "text": "wherein at least one of three R4 is deuterium-substituted" }, { "bbox": [ 0.1806640625, 0.615234375, 0.5244140625, 0.640625 ], "text": "C1 to C10 alkyl group, and" }, { "bbox": [ 0.15234375, 0.6591796875, 0.8427734375, 0.6884765625 ], "text": "wherein each of R31 to R37 is independently selected from" }, { "bbox": [ 0.1806640625, 0.6923828125, 0.8427734375, 0.7197265625 ], "text": "the group consisting of hydrogen, deuterium, C1 to C10" }, { "bbox": [ 0.1806640625, 0.7265625, 0.8427734375, 0.75390625 ], "text": "alkyl group unsubstituted or substituted with deute-" }, { "bbox": [ 0.1826171875, 0.7587890625, 0.8447265625, 0.7880859375 ], "text": "rium, C6 to C30 arylamine group unsubstituted or" }, { "bbox": [ 0.1806640625, 0.7919921875, 0.8447265625, 0.8193359375 ], "text": "substituted with deuterium or C1 to C10 alkyl, C6 to" }, { "bbox": [ 0.1796875, 0.826171875, 0.8447265625, 0.8515625 ], "text": "C30 aryl group unsubstituted or substituted with deu-" }, { "bbox": [ 0.177734375, 0.8583984375, 0.8427734375, 0.8876953125 ], "text": "terium or C1 to C10 alkyl, and C5 to C30 heteroaryl" }, { "bbox": [ 0.1796875, 0.8896484375, 0.8447265625, 0.9208984375 ], "text": "group unsubstituted or substituted with deuterium or" }, { "bbox": [ 0.1806640625, 0.92578125, 0.38671875, 0.953125 ], "text": "C1 to C10 alkyl." } ]
48
WO2000043362A1_41.png
<markush><cxsmi><r>Z</r><r>E</r>C1=CC=C(S(=O)(=O)C2CCN(CC(<r>R13</r>)(<r>R14</r>)C3=CC=C(<r>R11</r>)C=C3<r>R12</r>)CC2)C=C1.<r>R21</r>C|m:30:2.3.4.5.27.28</cxsmi><stable>Z:as defined in claim 1<ns>E:as defined in claim 1<ns>R11:as defined in claim 3<ns>R12:as defined in claim 3<ns>R13:as defined in claim 3<ns>R14:as defined in claim 3</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 31 32 0 0 0 M V30 BEGIN ATOM M V30 1 C 1.299038 3.205424 0.000000 0 M V30 2 R 0.000000 2.455424 0.000000 0 VAL=1 M V30 3 R 4.042046 -1.078954 0.000000 0 VAL=1 M V30 4 R 3.000000 0.000000 0.000000 0 VAL=2 M V30 5 C 1.500000 0.000000 0.000000 0 M V30 6 C 0.750000 -1.299038 0.000000 0 M V30 7 C -0.750000 -1.299038 0.000000 0 M V30 8 C -0.000000 -0.000000 0.000000 0 M V30 9 C -0.750000 1.299038 0.000000 0 M V30 10 C 0.750000 1.299038 0.000000 0 M V30 11 S 1.500000 -0.000000 0.000000 0 M V30 12 O 1.862961 -1.455424 0.000000 0 M V30 13 O 1.862961 1.455424 0.000000 0 M V30 14 C 3.000000 -0.000000 0.000000 0 M V30 15 C 3.750000 -1.299038 0.000000 0 M V30 16 C 5.250000 -1.299038 0.000000 0 M V30 17 N 6.000000 -0.000000 0.000000 0 M V30 18 C 7.500000 -0.000000 0.000000 0 M V30 19 C 8.250000 -1.299038 0.000000 0 M V30 20 R 6.950962 -2.049038 0.000000 0 VAL=1 M V30 21 R 9.549038 -0.549038 0.000000 0 VAL=1 M V30 22 C 9.000000 -2.598076 0.000000 0 M V30 23 C 8.250000 -3.897114 0.000000 0 M V30 24 C 9.750000 -3.897114 0.000000 0 M V30 25 C 10.500000 -5.196152 0.000000 0 M V30 26 R 12.000000 -5.196152 0.000000 0 VAL=1 M V30 27 C 9.750000 -3.897114 0.000000 0 M V30 28 C 10.500000 -2.598076 0.000000 0 M V30 29 R 11.250000 -1.299038 0.000000 0 VAL=1 M V30 30 C 5.250000 1.299038 0.000000 0 M V30 31 C 3.750000 1.299038 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 ENDPTS=(6 5 10 9 8 6 7) ATTACH=ANY M V30 2 1 3 4 M V30 3 1 4 5 M V30 4 2 5 6 M V30 5 1 6 7 M V30 6 2 7 8 M V30 7 1 8 9 M V30 8 2 9 10 M V30 9 1 8 11 M V30 10 2 11 12 M V30 11 2 11 13 M V30 12 1 11 14 M V30 13 1 14 15 M V30 14 1 15 16 M V30 15 1 16 17 M V30 16 1 17 18 M V30 17 1 18 19 M V30 18 1 19 20 M V30 19 1 19 21 M V30 20 1 19 22 M V30 21 2 22 23 M V30 22 1 23 24 M V30 23 2 24 25 M V30 24 1 25 26 M V30 25 1 25 27 M V30 26 2 27 28 M V30 27 1 28 29 M V30 28 1 17 30 M V30 29 1 30 31 M V30 30 1 10 5 M V30 31 1 31 14 M V30 32 1 28 22 M V30 END BOND M V30 END CTAB M END
**C1=CC=C(S(=O)(=O)C2CCN(CC(*)(*)C3=CC=C(*)C=C3*)CC2)C=C1.*C |$Z;E;;;;;;;;;;;;;;R13;R14;;;;;R11;;;R12;;;;;R21;$,m:30:2.28.27.5.3.4|
**C1=CC=C(S(=O)(=O)C2CCN(CC(*)(*)C3=CC=C(*)C=C3*)CC2)C=C1.*C |$Z;E;;;;;;;;;;;;;;R13;R14;;;;;R11;;;R12;;;;;R21;$,m:30:2.28.27.5.3.4|
<r>Z</r><r>E</r>C1=CC=C(S(=O)(=O)C2CCN(CC(<r>R13</r>)(<r>R14</r>)C3=CC=C(<r>R11</r>)C=C3<r>R12</r>)CC2)C=C1.<r>R21</r>C|m:30:2.3.4.5.27.28
null
[ { "bbox": [ 0.3095703125, 0.33203125, 0.3291015625, 0.3544921875 ], "text": "E" }, { "bbox": [ 0.3486328125, 0.482421875, 0.3857421875, 0.5078125 ], "text": "R21" }, { "bbox": [ 0.5009765625, 0.4384765625, 0.5234375, 0.46484375 ], "text": "S" }, { "bbox": [ 0.4609375, 0.490234375, 0.4794921875, 0.51171875 ], "text": "O" }, { "bbox": [ 0.5390625, 0.4853515625, 0.556640625, 0.5078125 ], "text": "O" }, { "bbox": [ 0.6396484375, 0.33984375, 0.6591796875, 0.3603515625 ], "text": "N" }, { "bbox": [ 0.677734375, 0.373046875, 0.7158203125, 0.4033203125 ], "text": "R13" }, { "bbox": [ 0.7626953125, 0.37109375, 0.8017578125, 0.3994140625 ], "text": "R14" }, { "bbox": [ 0.837890625, 0.3896484375, 0.87109375, 0.4208984375 ], "text": "R12" }, { "bbox": [ 0.9169921875, 0.1943359375, 0.955078125, 0.2236328125 ], "text": "R11" }, { "bbox": [ 0.044921875, 0.7119140625, 0.7265625, 0.744140625 ], "text": "wherein Z and E are as defined in claim 1; and" }, { "bbox": [ 0.138671875, 0.76953125, 0.869140625, 0.80078125 ], "text": "R11, R12, R13, R14 and R21 are as defined in claim 3." }, { "bbox": [ 0.23828125, 0.3349609375, 0.2578125, 0.359375 ], "text": "Z" } ]
49
WO2001014360A2_33_c.png
<markush><cxsmi>*C=CC1=CC=C(C(=O)O<r>R1</r>)C=C1.<r>R3</r>OCC1(<r>R2</r>)CC<r>X</r>C2=C1C=CC=C2|Sg:n:18:n:ht,m:0:21.22.23.24.25.26</cxsmi><stable>R2:lower alkyl<ns>R3:lower alkyl<n>H<ns>X:oxygen<n>sulfur<ns>n:1-2</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 27 28 1 0 0 M V30 BEGIN ATOM M V30 1 A 5.250000 -1.299038 0.000000 0 M V30 2 C 3.750000 -1.299038 0.000000 0 M V30 3 C 3.000000 0.000000 0.000000 0 M V30 4 C 1.500000 0.000000 0.000000 0 M V30 5 C 0.750000 -1.299038 0.000000 0 M V30 6 C -0.750000 -1.299038 0.000000 0 M V30 7 C -0.000000 -0.000000 0.000000 0 M V30 8 C -0.750000 1.299038 0.000000 0 M V30 9 C 0.750000 1.299038 0.000000 0 M V30 10 C 1.500000 -0.000000 0.000000 0 M V30 11 O 2.250000 -1.299038 0.000000 0 M V30 12 O 2.250000 1.299038 0.000000 0 M V30 13 R 3.750000 1.299038 0.000000 0 VAL=1 M V30 14 R 6.218145 3.659955 0.000000 0 VAL=1 M V30 15 O 4.808606 3.146925 0.000000 0 M V30 16 C 3.659539 4.111106 0.000000 0 M V30 17 C 2.250000 3.598076 0.000000 0 M V30 18 R 2.354715 5.094417 0.000000 0 VAL=1 M V30 19 C 1.500000 2.299038 0.000000 0 M V30 20 C -0.000000 2.299038 0.000000 0 M V30 21 R -0.750000 3.598076 0.000000 0 VAL=2 M V30 22 C -0.000000 4.897114 0.000000 0 M V30 23 C 0.750000 3.598076 0.000000 0 M V30 24 C 1.500000 4.897114 0.000000 0 M V30 25 C 0.750000 6.196152 0.000000 0 M V30 26 C -0.750000 6.196152 0.000000 0 M V30 27 C -1.500000 4.897114 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 ENDPTS=(6 26 27 25 22 23 24) ATTACH=ANY M V30 2 2 2 3 CFG=2 M V30 3 1 3 4 M V30 4 2 4 5 M V30 5 1 5 6 M V30 6 2 6 7 M V30 7 1 7 8 M V30 8 2 8 9 M V30 9 1 7 10 M V30 10 2 10 11 M V30 11 1 10 12 M V30 12 1 12 13 M V30 13 1 14 15 M V30 14 1 15 16 M V30 15 1 16 17 M V30 16 1 17 18 M V30 17 1 17 19 M V30 18 1 19 20 M V30 19 1 20 21 M V30 20 1 21 22 M V30 21 2 22 23 M V30 22 1 23 24 M V30 23 2 24 25 M V30 24 1 25 26 M V30 25 2 26 27 M V30 26 1 9 4 M V30 27 1 23 17 M V30 28 1 27 22 M V30 END BOND M V30 BEGIN SGROUP M V30 1 SRU 0 ATOMS=(1 19) XBONDS=(2 17 18) XBHEAD=(1 17) XBCORR=(2 17 18) - M V30 CONNECT=HT LABEL=n M V30 END SGROUP M V30 END CTAB M END
*C=CC1=CC=C(C(=O)O*)C=C1.*OCC1(*)CC*C2=C1C=CC=C2 |$;;;;;;;;;;R1;;;R3;;;;R2;;;X;;;;;;$,Sg:n:18:n:ht:::,m:0:25.26.24.21.22.23|
*C=CC1=CC=C(C(=O)O*)C=C1.*OCC1(*)CC*C2=C1C=CC=C2 |$;;;;;;;;;;R1;;;R3;;;;R2;;;X;;;;;;$,Sg:n:18:n:ht:::,m:0:25.26.24.21.22.23|
*C=CC1=CC=C(C(=O)O<r>R1</r>)C=C1.<r>R3</r>OCC1(<r>R2</r>)CC<r>X</r>C2=C1C=CC=C2|Sg:n:18:n:ht,m:0:21.22.23.24.25.26
null
[ { "bbox": [ 0.1005859375, 0.26171875, 0.11328125, 0.275390625 ], "text": "n" }, { "bbox": [ 0.0927734375, 0.2802734375, 0.1201171875, 0.3095703125 ], "text": "R2" }, { "bbox": [ 0.1591796875, 0.326171875, 0.1748046875, 0.3486328125 ], "text": "O" }, { "bbox": [ 0.1923828125, 0.3359375, 0.21875, 0.3642578125 ], "text": "R3" }, { "bbox": [ 0.1328125, 0.18359375, 0.1455078125, 0.201171875 ], "text": "X" }, { "bbox": [ 0.439453125, 0.212890625, 0.521484375, 0.23828125 ], "text": "COOR1" }, { "bbox": [ 0.1171875, 0.423828125, 0.21875, 0.44921875 ], "text": "wherein" }, { "bbox": [ 0.1123046875, 0.4697265625, 0.1416015625, 0.4970703125 ], "text": "R" }, { "bbox": [ 0.3056640625, 0.4716796875, 0.6142578125, 0.50390625 ], "text": "is hydrogen, lower alkyl;" }, { "bbox": [ 0.1171875, 0.521484375, 0.146484375, 0.55078125 ], "text": "R2" }, { "bbox": [ 0.3056640625, 0.521484375, 0.478515625, 0.5537109375 ], "text": "is lower alkyl;" }, { "bbox": [ 0.1171875, 0.5732421875, 0.146484375, 0.599609375 ], "text": "R3" }, { "bbox": [ 0.3056640625, 0.57421875, 0.5439453125, 0.6044921875 ], "text": "is lower alkyl or H;" }, { "bbox": [ 0.1171875, 0.626953125, 0.13671875, 0.6494140625 ], "text": "X" }, { "bbox": [ 0.3056640625, 0.625, 0.5478515625, 0.6572265625 ], "text": "is oxygen or sulfur;" }, { "bbox": [ 0.115234375, 0.6865234375, 0.1328125, 0.70703125 ], "text": "n" }, { "bbox": [ 0.3056640625, 0.6787109375, 0.4697265625, 0.708984375 ], "text": "is 1 or 2; and" }, { "bbox": [ 0.115234375, 0.7314453125, 0.216796875, 0.7578125 ], "text": "wherein" }, { "bbox": [ 0.3056640625, 0.7294921875, 0.66015625, 0.76171875 ], "text": "the dotted bond is optional" }, { "bbox": [ 0.1181640625, 0.7822265625, 0.9541015625, 0.8154296875 ], "text": "and pharmaceutically active salts of carboxylic acids of formula I." } ]
50
WO2002010163A1_24.png
<markush><cxsmi><r>X</r>C(=O)C(<r>L</r>)(<r>R2</r>)<r>R3</r></cxsmi><stable>R2:as described hereinabove<ns>R3:as described hereinabove<ns>L:as described hereinabove<ns>X:hydroxy<n>halogen<n>acyloxy</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 7 6 0 0 0 M V30 BEGIN ATOM M V30 1 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 2 C 1.299038 0.750000 0.000000 0 M V30 3 O 1.299038 2.250000 0.000000 0 M V30 4 C 2.598076 -0.000000 0.000000 0 M V30 5 R 3.348076 1.299038 0.000000 0 VAL=1 M V30 6 R 1.848076 -1.299038 0.000000 0 VAL=1 M V30 7 R 3.897114 -0.750000 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 2 4 M V30 4 1 4 5 M V30 5 1 4 6 M V30 6 1 4 7 M V30 END BOND M V30 END CTAB M END
*C(=O)C(*)(*)* |$X;;;;L;R2;R3$,|
*C(=O)C(*)(*)* |$X;;;;L;R2;R3$,|
<r>X</r>C(=O)C(<r>L</r>)(<r>R2</r>)<r>R3</r>
null
[ { "bbox": [ 0.7998046875, 0.3095703125, 0.818359375, 0.341796875 ], "text": "X" }, { "bbox": [ 0.84375, 0.23828125, 0.8642578125, 0.26171875 ], "text": "O" }, { "bbox": [ 0.86328125, 0.3525390625, 0.8994140625, 0.3857421875 ], "text": "R2" }, { "bbox": [ 0.9169921875, 0.357421875, 0.94921875, 0.388671875 ], "text": "R3" }, { "bbox": [ 0.9365234375, 0.2861328125, 0.955078125, 0.3134765625 ], "text": "L" }, { "bbox": [ 0.0439453125, 0.5234375, 0.1845703125, 0.556640625 ], "text": "wherein:" }, { "bbox": [ 0.0439453125, 0.609375, 0.8291015625, 0.6533203125 ], "text": "R2, R3 and L are as described hereinabove; and" }, { "bbox": [ 0.0439453125, 0.7177734375, 0.61328125, 0.755859375 ], "text": "X is hydroxy, halogen or acyloxy;" } ]
51
WO2002010163A1_25.png
<markush><cxsmi><r>R6</r>C.<r>R7</r>C.<r>X</r>C(=O)C1CCN(<r>P</r>)C1|Sg:n:8:m:ht,Sg:n:12:n:ht,m:1:7.8.9.10.12,m:3:7.8.9.10.12</cxsmi><stable>R6:as described hereinabove<ns>R7:as described hereinabove<ns>X:as described hereinabove<ns>P:nitrogen-protecting group<ns>m:0-5<ns>n:0-5</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 13 11 2 0 0 M V30 BEGIN ATOM M V30 1 C 1.299038 2.963525 0.000000 0 M V30 2 R 0.000000 2.213525 0.000000 0 VAL=1 M V30 3 C 1.299038 4.713525 0.000000 0 M V30 4 R 0.000000 3.963525 0.000000 0 VAL=1 M V30 5 R 2.775976 0.000000 0.000000 0 VAL=1 M V30 6 N 1.275976 0.000000 0.000000 0 M V30 7 C 0.394298 1.213525 0.000000 0 M V30 8 C -1.032286 0.750000 0.000000 0 M V30 9 C -1.032286 -0.750000 0.000000 0 M V30 10 C 0.394298 -1.213525 0.000000 0 M V30 11 C -2.245812 -1.631678 0.000000 0 M V30 12 R -3.616130 -1.021573 0.000000 0 VAL=1 M V30 13 O -2.089019 -3.123461 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 ENDPTS=(5 9 8 7 10 6) ATTACH=ANY M V30 2 1 3 4 ENDPTS=(5 9 8 7 10 6) ATTACH=ANY M V30 3 1 5 6 M V30 4 1 6 7 M V30 5 1 7 8 M V30 6 1 8 9 M V30 7 1 9 10 M V30 8 1 9 11 M V30 9 1 11 12 M V30 10 2 11 13 M V30 11 1 10 6 M V30 END BOND M V30 BEGIN SGROUP M V30 1 SRU 0 ATOMS=(1 8) XBONDS=(2 5 6) XBHEAD=(1 5) XBCORR=(2 5 6) - M V30 CONNECT=HT LABEL=m M V30 2 SRU 0 ATOMS=(1 10) XBONDS=(2 7 11) XBHEAD=(1 7) XBCORR=(2 7 11) - M V30 CONNECT=HT LABEL=n M V30 END SGROUP M V30 END CTAB M END
*C.*C.*C(=O)C1CCN(*)C1 |$R6;;R7;;X;;;;;;;P;$,,,Sg:n:8:m:ht:::,Sg:n:12:n:ht:::,m:1:7.8.9.12.10,m:3:7.8.9.12.10|
*C.*C.*C(=O)C1CCN(*)C1 |$R6;;R7;;X;;;;;;;P;$,,,Sg:n:8:m:ht:::,Sg:n:12:n:ht:::,m:1:7.8.9.12.10,m:3:7.8.9.12.10|
<r>R6</r>C.<r>R7</r>C.<r>X</r>C(=O)C1CCN(<r>P</r>)C1|Sg:n:8:m:ht,Sg:n:12:n:ht,m:1:7.8.9.10.12,m:3:7.8.9.10.12
null
[ { "bbox": [ 0.68359375, 0.1650390625, 0.70703125, 0.1923828125 ], "text": "O" }, { "bbox": [ 0.68359375, 0.2568359375, 0.70703125, 0.2880859375 ], "text": "X" }, { "bbox": [ 0.8359375, 0.1904296875, 0.857421875, 0.2060546875 ], "text": "m" }, { "bbox": [ 0.912109375, 0.15234375, 0.947265625, 0.1904296875 ], "text": "R6" }, { "bbox": [ 0.91796875, 0.2080078125, 0.953125, 0.24609375 ], "text": "R7" }, { "bbox": [ 0.8681640625, 0.25, 0.8876953125, 0.2724609375 ], "text": "N" }, { "bbox": [ 0.912109375, 0.27734375, 0.9296875, 0.3046875 ], "text": "P" }, { "bbox": [ 0.841796875, 0.2939453125, 0.859375, 0.3125 ], "text": "n" }, { "bbox": [ 0.04296875, 0.421875, 0.1884765625, 0.455078125 ], "text": "wherein:" }, { "bbox": [ 0.0439453125, 0.5087890625, 0.7734375, 0.5576171875 ], "text": "R6, R7 and X are as described hereinabove;" }, { "bbox": [ 0.0439453125, 0.6181640625, 0.5908203125, 0.66015625 ], "text": "P is a nitrogen-protecting group;" }, { "bbox": [ 0.044921875, 0.71875, 0.3837890625, 0.7646484375 ], "text": "m equals 0 to 5; and" }, { "bbox": [ 0.041015625, 0.8193359375, 0.3017578125, 0.859375 ], "text": "n equals 0 to 5;" } ]
52
WO2002010163A1_29.png
<markush><cxsmi><r>R</r>C(=O)C(<r>L</r>)<r>R1</r></cxsmi><stable>R:as described hereinabove<ns>R1:as described hereinabove<ns>L:as described hereinabove</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 6 5 0 0 0 M V30 BEGIN ATOM M V30 1 R 0.000000 0.000000 0.000000 0 VAL=1 M V30 2 C 1.299038 0.750000 0.000000 0 M V30 3 R 2.598076 -0.000000 0.000000 0 VAL=1 M V30 4 C 1.299038 2.250000 0.000000 0 M V30 5 R 2.598076 3.000000 0.000000 0 VAL=1 M V30 6 O 0.000000 3.000000 0.000000 0 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 1 2 3 M V30 3 1 2 4 M V30 4 1 4 5 M V30 5 2 4 6 M V30 END BOND M V30 END CTAB M END
*C(=O)C(*)* |$R;;;;L;R1$,|
*C(=O)C(*)* |$R;;;;L;R1$,|
<r>R</r>C(=O)C(<r>L</r>)<r>R1</r>
null
[ { "bbox": [ 0.82421875, 0.259765625, 0.8505859375, 0.2900390625 ], "text": "O" }, { "bbox": [ 0.7724609375, 0.34765625, 0.798828125, 0.3798828125 ], "text": "R" }, { "bbox": [ 0.87890625, 0.3994140625, 0.9169921875, 0.439453125 ], "text": "R1" }, { "bbox": [ 0.93359375, 0.31640625, 0.951171875, 0.3505859375 ], "text": "L" }, { "bbox": [ 0.04296875, 0.578125, 0.2099609375, 0.6171875 ], "text": "wherein:" }, { "bbox": [ 0.044921875, 0.6826171875, 0.8525390625, 0.7333984375 ], "text": "R, R1 and L are as described hereinabove;" } ]
53
11279716_34_c1.png
<markush><cxsmi><r>R3</r>C1=C(<r>R2</r>)C(<r>R1</r>)=[N+]2C1=C(<r>R4</r>)C1=C(<r>R5</r>)C(<r>R6</r>)=C(<r>R7</r>)N1[B-]2(<r>X2</r>)<r>X1</r></cxsmi><stable>R2:a cyano group<ns>R6:hydrogen<ns>R4:a substituted or unsubstituted aryl group<ns>R1:a substituted or unsubstituted cycloalkyl group<n>a substituted or unsubstituted aliphatic heterocyclic group<ns>R3:a substituted or unsubstituted cycloalkyl group<n>a substituted or unsubstituted aliphatic heterocyclic group<ns>R5:a substituted or unsubstituted cycloalkyl group<n>a substituted or unsubstituted aliphatic heterocyclic group<ns>R7:a substituted or unsubstituted cycloalkyl group<n>a substituted or unsubstituted aliphatic heterocyclic group<ns>X1:a halogen group<n>a cyano group<ns>X2:a halogen group<n>a cyano group</stable></markush>
RDKit 2D 0 0 0 0 0 0 0 0 0 0999 V3000 M V30 BEGIN CTAB M V30 COUNTS 21 23 0 0 0 M V30 BEGIN ATOM M V30 1 R -1.987380 0.000000 0.000000 0 VAL=1 M V30 2 C -0.487380 0.000000 0.000000 0 M V30 3 C 0.394298 1.213525 0.000000 0 M V30 4 R 1.607824 2.095203 0.000000 0 VAL=1 M V30 5 C 0.394298 -0.286475 0.000000 0 M V30 6 R 1.607824 -1.168152 0.000000 0 VAL=1 M V30 7 C -1.032286 -0.750000 0.000000 0 M V30 8 N 0.394298 -1.213525 0.000000 0 M V30 9 B 0.706166 -2.680747 0.000000 0 CHG=-1 VAL=4 M V30 10 R 1.501045 -3.952819 0.000000 0 VAL=1 M V30 11 R 2.096942 -2.118837 0.000000 0 VAL=1 M V30 12 N -0.408551 -3.684443 0.000000 0 CHG=1 VAL=4 M V30 13 C -1.523269 -2.680747 0.000000 0 M V30 14 R -1.634255 -1.891349 0.000000 0 VAL=1 M V30 15 C -2.822307 -3.430747 0.000000 0 M V30 16 R -4.192625 -2.820642 0.000000 0 VAL=1 M V30 17 C -1.330524 -3.587540 0.000000 0 M V30 18 R -0.580524 -4.886578 0.000000 0 VAL=1 M V30 19 C -0.720419 -2.217221 0.000000 0 M V30 20 C -2.147004 -1.753696 0.000000 0 M V30 21 R -3.573588 -1.290170 0.000000 0 VAL=1 M V30 END ATOM M V30 BEGIN BOND M V30 1 1 1 2 M V30 2 2 2 3 M V30 3 1 3 4 M V30 4 1 3 5 M V30 5 1 5 6 M V30 6 2 5 7 M V30 7 1 7 8 M V30 8 1 8 9 M V30 9 1 9 10 M V30 10 1 9 11 M V30 11 1 9 12 M V30 12 2 12 13 M V30 13 1 13 14 M V30 14 1 13 15 M V30 15 1 15 16 M V30 16 2 15 17 M V30 17 1 17 18 M V30 18 1 17 19 M V30 19 2 19 20 M V30 20 1 20 21 M V30 21 1 8 2 M V30 22 1 19 12 M V30 23 1 20 7 M V30 END BOND M V30 END CTAB M END
*C1=C(*)C(*)=[N+]2C1=C(*)C1=C(*)C(*)=C(*)N1[B-]2(*)* |$R3;;;R2;;R1;;;;R4;;;R5;;R6;;R7;;;X2;X1$,|
*C1=C(*)C(*)=[N+]2C1=C(*)C1=C(*)C(*)=C(*)N1[B-]2(*)* |$R3;;;R2;;R1;;;;R4;;;R5;;R6;;R7;;;X2;X1$,|
<r>R3</r>C1=C(<r>R2</r>)C(<r>R1</r>)=[N+]2C1=C(<r>R4</r>)C1=C(<r>R5</r>)C(<r>R6</r>)=C(<r>R7</r>)N1[B-]2(<r>X2</r>)<r>X1</r>
null
[ { "bbox": [ 0.0859375, 0.2099609375, 0.119140625, 0.2353515625 ], "text": "R6" }, { "bbox": [ 0.189453125, 0.083984375, 0.2197265625, 0.107421875 ], "text": "R5" }, { "bbox": [ 0.337890625, 0.072265625, 0.369140625, 0.0927734375 ], "text": "R4" }, { "bbox": [ 0.4873046875, 0.0830078125, 0.51953125, 0.109375 ], "text": "R3" }, { "bbox": [ 0.560546875, 0.20703125, 0.5986328125, 0.240234375 ], "text": "R2" }, { "bbox": [ 0.484375, 0.3359375, 0.515625, 0.359375 ], "text": "R1" }, { "bbox": [ 0.3994140625, 0.24609375, 0.42578125, 0.26953125 ], "text": "N" }, { "bbox": [ 0.341796875, 0.28515625, 0.3623046875, 0.302734375 ], "text": "B" }, { "bbox": [ 0.279296875, 0.24609375, 0.30078125, 0.271484375 ], "text": "N" }, { "bbox": [ 0.1787109375, 0.3359375, 0.2099609375, 0.359375 ], "text": "R7" }, { "bbox": [ 0.302734375, 0.34375, 0.333984375, 0.3642578125 ], "text": "X1" }, { "bbox": [ 0.3701171875, 0.341796875, 0.41015625, 0.3642578125 ], "text": "X2" }, { "bbox": [ 0.041015625, 0.4423828125, 0.431640625, 0.4755859375 ], "text": "in Chemical Formula 1," }, { "bbox": [ 0.0439453125, 0.484375, 0.3857421875, 0.51953125 ], "text": "R2 is a cyano group," }, { "bbox": [ 0.0439453125, 0.529296875, 0.2998046875, 0.5625 ], "text": "R6 is hydrogen," }, { "bbox": [ 0.0439453125, 0.572265625, 0.810546875, 0.6103515625 ], "text": "R4 is a substituted or unsubstituted aryl group," }, { "bbox": [ 0.0439453125, 0.6162109375, 0.94921875, 0.6533203125 ], "text": "R1, R3, R5, and R7 are the same as or different from each" }, { "bbox": [ 0.08203125, 0.6640625, 0.955078125, 0.69921875 ], "text": "other, and are each independently a substituted or" }, { "bbox": [ 0.0810546875, 0.7099609375, 0.94921875, 0.7421875 ], "text": "unsubstituted cycloalkyl group; or a substituted or" }, { "bbox": [ 0.08203125, 0.7587890625, 0.841796875, 0.7958984375 ], "text": "unsubstituted aliphatic heterocyclic group, and" }, { "bbox": [ 0.0439453125, 0.7998046875, 0.951171875, 0.8349609375 ], "text": "X1 and X2 are the same as or different from each other," }, { "bbox": [ 0.0859375, 0.84375, 0.951171875, 0.880859375 ], "text": "and are each independently a halogen group or a cyano" }, { "bbox": [ 0.08203125, 0.8935546875, 0.189453125, 0.9267578125 ], "text": "group." } ]
End of preview. Expand in Data Studio
Description

This repository contains datasets introduced in MarkushGrapher: Joint Visual and Textual Recognition of Markush Structures.

Training:

  • MarkushGrapher-Synthetic-Training: This set contains synthetic Markush structures used for training MarkushGrapher. Samples are synthetically generated using the following steps: (1) SMILES to CXSMILES conversion using RDKit; (2) CXSMILES rendering using CDK; (3) text description generation using templates; and (4) text description augmentation with LLM.

Benchmarks:

  • M2S: This set contains 103 real Markush structures from patent documents. Samples are crops of both Markush structure backbone images and their textual descriptions. They are extracted from documents published in USPTO, EPO and WIPO.
  • USPTO-Markush: This set contains 75 real Markush structure backbone images from patent documents. They are extracted from documents published in USPTO.
  • MarkushGrapher-Synthetic: This set contains 1000 synthetic Markush structures. Its images are sampled such that overall, each Markush features (R-groups, ’m’ and ’Sg’ sections) is represented evenly.

An example of how to read the dataset is provided in dataset_explorer.ipynb.

Downloads last month
1,365

Collection including docling-project/MarkushGrapher-Datasets